ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space/ ddot right-of-way. Date: September 9, 2015 Value: $20,574Client: Dcwatercip | Permit type: Excavation; water ml | Permit id: Pa115694 | |||||
SCORE 100 Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space/ ddot right-of-way. Date: September 9, 2015 Contractor: Dcwater CipPermit type: Excavation; water ml (trench) | Permit status: Permit expired | Expiration date: February 4, 2016 | Permit id: Pa115694 | |||||
SCORE 100 Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space/ ddot right-of-way. Date: January 6, 2016 Contractor: Dcwater CipPermit type: Excavation; water ml (trench) | Permit status: Permit expired | Expiration date: April 4, 2016 | Permit id: Pa115694-R1 | |||||
SCORE 100 Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space/ ddot right-of-way. Date: January 6, 2016 Contractor: Dcwater CipPermit type: Excavation; water ml (trench) | Permit status: Permit expired | Expiration date: April 4, 2016 | Permit id: Pa115694-R1 | |||||
SCORE 98 Steel plate- single location Date: July 16, 2017 Contractor: Anchor ConstructionPermit status: Expired | Expiration date: July 21, 2017 | Permit id: Pa10452838 | |||||
SCORE 100 Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space/ ddot right-of-way. Date: September 9, 2015 Contractor: Dcwater CipPermit type: Excavation; water ml (trench) | Permit status: Permit expired | Expiration date: February 4, 2016 | Permit id: Pa115694 | |||||
SCORE 100 Dc water will be constructing a 2 mg steel composite water tower along with associated water mains adjacent to the st. Elizabeths hospital east campus within the anacostia neighborhood in se washington dc. This project will improve water pressure, system reliability and fire protection in ward 8. The area of construction of the 24-inch water main will be along robinson place se and continue along 12th place se, shippen lane se and terminate on shippen lane se at the intersection with 15th place se. A total of 3,429 lf of water main will be installed as part of this project in public space ddot right-of-way. Date: January 11, 2017 Contractor: Dcwater CipPermit type: Excavation; water ml (trench) | Permit status: Permit expired | Expiration date: March 30, 2017 | Permit id: Pa115694-R7 |