Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2014 Contractor: Timothy J Molek Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2014 Contractor: T And M Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 24, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 18, 2017 Contractor: W C Heating And Air Conditioning Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: September 23, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |