SCORE 75 This project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 3, 2015 Contractor: Doug Whyte Permit type: Mechanical : 8023 - | Permit status: Permit finaled | Completion date: March 17, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 81 2600sf reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer owens corning brand and model tru-definition color (if cool roof required) sierra gray built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 24, 2015 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). 11/5/2015 plan change see cofa.. T. T. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 17, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 17, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 88 Roof mount residential solar pv for existing sfd (no meter upgrade). 11 5 2015 plan change see cofa.. T. T. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 17, 2015 Contractor: P T Electric Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 17, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 93 Description of work hvac change out - ducts only - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: February 3, 2015 Contractor: Fire And Ice Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 17, 2015 | Permit id: Pds2015-Resalt- | |||||