Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Electrical Date: September 11, 2013 Contractor: Paolo Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-249 | |||||
SCORE 87 Supplemental permit to tear off (e) roofing, approx. 3. 5. Sqs. And hot Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13016-70001-156 | |||||
SCORE 87 Hvac Date: August 2, 2013 Contractor: Felipe Guzman Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13044-70000-080 | |||||
SCORE 93 Pv1. Install 6. 5 kw dc roof-mounted solar array, interconnect into Date: September 10, 2013 Contractor: Paolo Campos Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-214 | |||||
SCORE 87 Tear off existing pitch/flat roof. Re-roof with class a or b material Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13016-70000-156 | |||||
SCORE 87 Supplemental permit to tear off (e) roofing, approx. 3. 5. Sqs. And hot Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13016-70001-156 | |||||
SCORE 87 Date: August 2, 2013 Contractor: Felipe Guzman Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13044-70000-080 | |||||
SCORE 93 Pv1. Install 6. 5 kw dc roof-mounted solar array, interconnect into Date: September 10, 2013 Contractor: Paolo Campos Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-10000-214 | |||||
SCORE 96 Date: September 11, 2013 Contractor: Paolo Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-249 | |||||
SCORE 87 Tear off existing pitch flat roof. Re-roof with class a or b material Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13016-70000-156 |