Building Permits at 2503 Noble Ave Alameda CA 94501


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2503 Noble Ave Alameda CA 94501 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Re-roof overlay with class (a) fire rated foam, intall spark arrestor if necessary
Date:  November 10, 2014
Value:   $800

Permit type: Building | Permit status: Finaled | Completion date: April 9, 2015 | Permit id: B14-1019
2014/11/10800952503 Noble Ave Alameda Ca 94501
Electrical upgrade: kitchen and two bathrooms. 1. Rewire upstairs bathroom with 3 switches, 1 fan/light, 1 light and 1 gfi, 2. Rewire lower bath room with 3 switches, 1 fan/light, 1 light and 1 gfi. 3. Rewire kitchen with 12 outlets, 5 switches, and 7 lights. 4. Add 1 dryer outlet and 1 washer outlet in laundry room. 5. Upgrade 6 circuit fuse box to 1 amp subpanel in laundry room. 6. Rewire 2 circuit fuse box to new sub panel . 7. Upgrade main meter panel to 2 amp. 8. Add 12 circuits for rewiring work. 9. Concert grage fuse box to breaker panel. 6-6-16 added light switch and two outlets to crawl space. (4 circuit) (electrical)
Date:  May 18, 2016
Value:   $7,000

Permit type: Electrical | Permit status: Permit issued | Expiration date: May 18, 2019 | Permit id: E16-0143
2016/05/187000952503 Noble Ave Alameda Ca 94501
SCORE
100
Install new york furnace (80,0 btus), ductwork & flue (electrical being run by others)
Date:  June 16, 2016
Value:   $13,483
Contractor: Robert Tuck

Permit type: Mechanical | Permit status: Permit issued | Expiration date: June 16, 2019 | Current use: 434 - residential | Permit id: Mw16-0070
2016/06/16134831002503 Noble Ave Alameda Ca 94501Robert Tuck
SCORE
89
Renovation of two bathrooms and kitchen. No structural changes. Bathroom 1 (downstairs) to relocate vanity and switch tub to shower. Bathroom two (upstairs) to switch shower to tub and turn toilet. Replace kitchen cabinets and upgrade electrical. 6-6-16 submitted drawing for engineered beam. Relocate washing machine water supply line and drain approx. 3 feet. (bldg elec plumbing mech)
Date:  April 20, 2016
Value:   $38,000
Contractor: Josh Meier

Permit type: Building | Permit status: Permit finaled | Completion date: October 20, 2016 | Expiration date: April 20, 2019 | Current use: Residential | Permit id: Cb16-0339
2016/04/2038000892503 Noble Ave Alameda Ca 94501Josh Meier
Electrical upgrade: kitchen and two bathrooms. 1. Rewire upstairs bathroom with 3 switches, 1 fan/light, 1 light and 1 gfi, 2. Rewire lower bath room with 3 switches, 1 fan/light, 1 light and 1 gfi. 3. Rewire kitchen with 12 outlets, 5 switches, and 7 lights. 4. Add 1 dryer outlet and 1 washer outlet in laundry room. 5. Upgrade 6 circuit fuse box to 1 amp subpanel in laundry room. 6. Rewire 2 circuit fuse box to new sub panel . 7. Upgrade main meter panel to 2 amp. 8. Add 12 circuits for rewiring work. 9. Concert grage fuse box to breaker panel. 6-6-16 added light switch and two outlets to crawl space. (4 circuit) (electrical) revision 8/4/16 (dm) cancel adding light switch and two outlets to crawl space (4 circuit)
Date:  May 18, 2016
Value:   $7,000

Permit type: Electrical | Permit status: Permit issued | Expiration date: May 18, 2019 | Permit id: E16-0143
2016/05/187000952503 Noble Ave Alameda Ca 94501
Electrical upgrade: kitchen and two bathrooms. 1. Rewire upstairs bathroom with 3 switches, 1 fan light, 1 light and 1 gfi, 2. Rewire lower bath room with 3 switches, 1 fan light, 1 light and 1 gfi. 3. Rewire kitchen with 12 outlets, 5 switches, and 7 lights. 4. Add 1 dryer outlet and 1 washer outlet in laundry room. 5. Upgrade 6 circuit fuse box to 1 amp subpanel in laundry room. 6. Rewire 2 circuit fuse box to new sub panel . 7. Upgrade main meter panel to 2 amp. 8. Add 12 circuits for rewiring work. 9. Concert grage fuse box to breaker panel. 6-6-16 added light switch and two outlets to crawl space. (4 circuit) (electrical) revision 8 4 16 (dm) cancel adding light switch and two outlets to crawl space (4 circuit)
Date:  May 18, 2016
Value:   $7,000

Permit type: Electrical | Permit status: Permit finaled | Completion date: November 1, 2016 | Expiration date: May 18, 2019 | Permit id: E16-0143
2016/05/187000952503 Noble Ave Alameda Ca 94501
SCORE
100
Install earthquake automatic gas shutoff valve model: little fire fighter. #agv-75. 3/4" pipe, horizontal
Date:  February 23, 2016
Value:   $480
Contractor: Chee Chan

Permit type: Plumbing | Permit status: Permit finaled | Completion date: March 3, 2016 | Expiration date: February 22, 2019 | Current use: 434 - residential | Permit id: Pw16-0043
2016/02/234801002503 Noble Ave Alameda Ca 94501Chee Chan
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.