Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoe dwelling used mh ![]() Permit status: Closed | Permit id: 11-00104 | |||||
SCORE 100 Zoe dwelling used mh Client: Zoe Dwelling Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-00104 | Parcel: 22840 | |||||
SCORE 99 Zoe dwelling used mh Client: Zoe Dwelling Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-00104 | Parcel: 22840 | |||||
Residential multi-family low density Client: Zoning Letter | Permit type: Research zoning letters | Permit status: Approved | Current use: Research | Permit id: 10-13000048pz | |||||
January 3, 2011 1:37:25 pm kneel. Zoe dwelling - used mh to lot location: hazel mill to ben lippen to gorman bridge to largo.; february 18, 2011 4:32:29 pm ajohnson. Changed electrical contractor on permit; no longer wants to use joseph c ray. Going to use jesse klennon. Aet.; march 15, 2011 3:20:29 pm jfortner. Recieved amendment to remove mechanical. Ok per jared, jlf; september 19, 2011 8:11:04 am kneel. Zoe dwelling - used mh to lot; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid b Permit type: Permits - historical | Permit status: Closed | Permit id: 11-00104 | Parcel: 22840 | |||||
Residential multi-family low density ![]() Client: Zoning Letter | Permit type: Research zoning letters | Permit status: Approved | Current use: Research | Permit id: 10-13000048pz | |||||
Zoe dwelling used mh ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 11-00104 | |||||
January 3, 2011 1:37:25 pm kneel. Zoe dwelling - used mh to lot location: hazel mill to ben lippen to gorman bridge to largo.; february 18, 2011 4:32:29 pm ajohnson. Changed electrical contractor on permit; no longer wants to use joseph c ray. Going to use jesse klennon. Aet.; march 15, 2011 3:20:29 pm jfortner. Recieved amendment to remove mechanical. Ok per jared, jlf; september 19, 2011 8:11:04 am kneel. Zoe dwelling - used mh to lot; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid b ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 11-00104 | Parcel: 22840 |