Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 14000-01528: connection detail for parapet wall for hvac equipment. Date: January 20, 2016 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00042 | |||||
SCORE 96 Install (36) solar water collectors on roof and install (1) 21 gallon solar storage tank in mechanical room Date: August 18, 2015 Contractor: Sun Light And Power Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02188 | |||||
SCORE 99 14-1528: deferred vehicle lift design Date: June 1, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00316 | |||||
SCORE 99 14000-01528: derferred submittal for truss calcs Date: August 12, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00458 | |||||
SCORE 99 14000-01528: deferred submittal for exterior metal stair #3 Date: August 26, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00489 | |||||
SCORE 99 14000-01528: interior layout changes, shift window a3 over by 1-foot, revise outlets, residential split unit systems have been downsized, fire damper added, grease shaft cleanout added. Date: July 29, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00440 | |||||
SCORE 99 14-1528: revised tiedown substitution Date: May 14, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00286 | |||||
SCORE 99 14000-01528: deferred submittal for the electric traction elevator Date: May 18, 2015 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00292 | |||||
SCORE 100 4 amp temp power Date: May 27, 2015 Contractor: Power Pole Service Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01325 | |||||
SCORE 99 Stanford affordable housing: new four (4) story mixed use building (128,682 sf). First floor includes parking (14,9 sf) and commercial space (33,034 sf). Floors 2-4 consist of residential units (80,748 sf). Structure consists of two separate buildings connected by a walkway. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01528 | |||||
SCORE 99 Demo (e) building 13,254 sf Date: June 24, 2014 Contractor: Segue Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01531 | |||||
SCORE 99 14000-01528: revision reduction in bio swails drainage to accomodate out door seating for ti (16000-1686) Date: January 30, 2017 Contractor: Segue Construction Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 17rev-00045 | |||||
SCORE 99 14000-01528: revision expansion of stair 1 roof landing Date: January 30, 2017 Contractor: Segue Construction Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 17rev-00044 | |||||
SCORE 100 Fambrinis cafe: ti and u&o for a 795 sf tenant space on the first floor. Scope of work includes new rooftop equipment Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01686 | |||||
SCORE 89 Vista center for the blind and visually impaired: ti and u&o for a 60 sf tenant space on the ground floor. Scope of work includes changing an exterior door with fixed sidelight to double exterior doors and new rooftop equipment. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00626 | |||||
SCORE 99 14000-01528: deffered submittal of structural for store front Date: April 21, 2016 Contractor: Segue Construction Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00256 | |||||
SCORE 99 14000-01528: ammr for trash exhaust (3) termination at roof. Date: February 26, 2016 Contractor: Segue Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00131 | |||||
SCORE 99 14000-01528: deffered submittal for stairs structural Date: April 21, 2016 Contractor: Segue Construction Inc Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00255 | |||||
SCORE 99 New 2-story single family residence (2772 sf) with basement (1713 sf), covered patio (559 sf), gas fire pit (dedicated line) and outdoor fountain; detached garage under 14-3221; 14pln-00381 Date: March 25, 2016 Contractor: Segue Construction Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00204 | |||||
SCORE 99 Demo (e) building 13,254 sf Date: June 24, 2014 Contractor: Segue Construction Inc Permit status: Permit issued | Permit id: 14000-01531 | |||||
SCORE 99 14000-01528: revision expansion of stair 1 roof landing Date: January 30, 2017 Contractor: Segue Construction Inc Permit status: Completed | Permit id: 17rev-00044 | |||||
SCORE 89 16000-00626: revised structural steel support for movable partition. Plans located in tech area Date: February 22, 2017 Contractor: E A Davidovits And Co Inc Permit status: Permit issued | Permit id: 17rev-00099 | |||||
SCORE 100 4 amp temp power Date: May 27, 2015 Contractor: Power Pole Service Permit status: Permit issued | Permit id: 15000-01325 | |||||
SCORE 89 16000-00626: revision to include updated gb-1 sheet Date: March 9, 2017 Contractor: E A Davidovits And Co Inc Permit status: Completed | Permit id: 17rev-00145 | |||||
SCORE 99 14-1528: deferred vehicle lift design Date: June 1, 2015 Contractor: Segue Construction Inc Permit status: In plan check | Permit id: 15rev-00316 | |||||
SCORE 99 14-1528: revised tiedown substitution Date: May 14, 2015 Contractor: Segue Construction Inc Permit status: Permit issued | Permit id: 15rev-00286 | |||||
SCORE 99 14000-01528: revision reduction in bio swails drainage to accomodate out door seating for ti (16000-1686) Date: January 30, 2017 Contractor: Segue Construction Inc Permit status: Completed | Permit id: 17rev-00045 | |||||
SCORE 89 16000-00626: revision to include updated plans for (n) rtus as well as associated electrical and plumbing. Date: March 31, 2017 Contractor: E A Davidovits And Co Inc Permit status: In plan check | Permit id: 17rev-00203 | |||||
SCORE 99 14000-01528: deferred submittal for the electric traction elevator Date: May 18, 2015 Contractor: Segue Construction Inc Permit status: Completed | Permit id: 15rev-00292 | |||||
SCORE 100 Fambrinis cafe: ti and u&o for a 795 sf tenant space on the first floor. Scope of work includes new rooftop equipment Permit status: Permit issued | Permit id: 16000-01686 | |||||
SCORE 99 14000-01528: add seven (7) booster fans for the dryers. No change to exterior. Revision required by building inspector Date: May 5, 2017 Contractor: Segue Construction Inc Permit status: Permit issued | Permit id: 17rev-00271 | |||||
SCORE 99 Stanford affordable housing: new four (4) story mixed use building (128,682 sf). First floor includes parking (14,9 sf) and commercial space (33,034 sf). Floors 2-4 consist of residential units (80,748 sf). Structure consists of two separate buildings connected by a walkway. U&o submitted for apartments. Date: June 24, 2014 Contractor: Segue Construction Inc Permit status: Finaled | Permit id: 14000-01528 | |||||
SCORE 89 Vista center for the blind and visually impaired: ti and u&o for a 60 sf tenant space on the ground floor. Scope of work includes changing an exterior door with fixed sidelight to double exterior doors and new rooftop equipment. Permit status: Permit issued | Permit id: 16000-00626 |