Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Zoning administration Date: February 19, 2015 Contractor: Zoning Verification Letter Permit status: Final draft | Completion date: February 23, 2015 | Current use: Zoning verification letter | Permit id: Plnzad2015-0010 | |||||
SCORE 61 Disassemble and remove the 2 aluminum buildings. Prepare site for improved drainage and asphalt. Pave a 65x62 section with asphalt. Install a 6 aftec wall. Date: March 30, 2016 Contractor: 239 Paramount Storage Expansion Areatray Baldwin Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-09469 | |||||
SCORE 61 Disassemble and remove the 2 aluminum buildings. Prepare site for improved drainage and asphalt. Pave a 65x62 section with asphalt. Install a 6 aftec wall. Date: March 30, 2016 Contractor: 239 Paramount Storage Expansion Areamatt Wideman Permit status: Inspections | Current use: Commercial | Permit id: Bld2015-09469 |