Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Revise to app #2002 05 17 6919. Scope of revision is to relocate the (e) entry door & install a (n) Date: September 7, 2004 Value: $20,000 Current use: School | Permit id: 200409073455 | |||||
SCORE 96 Install new stand pipe system in new bldg. & modify fire hose cabinets in (e) bldg. Current use: School | Permit id: 200404010233 | |||||
SCORE 100 Reve200205176919. R-5. Add new stair to connect 2nd fl addition to 3rd fl (e) mclaren bldg. Copy of Current use: School | Permit id: 200406156480 | |||||
Revise location of (e)entry to bldg.& construct a (n)pavillion canopy @exterior of entry as shown on Date: June 29, 2004 Value: $2,500 Current use: School | Permit id: 200406297603 | |||||
Revision to pa 200205176919, change courtyard, new scoring pattern in concrete, drinage layout, relo Date: July 7, 2004 Value: $4,500 Current use: School | Permit id: 200407078218 | |||||
SCORE 100 Add 1 door for security reasons in hallway at 2nd floor. Rev 200205176919 Current use: School | Permit id: 200501274172 | |||||
SCORE 99 Interior non structural demo permit & minor t. T. On 4th floor. Permit correct to as build Current use: Office | Permit id: #200506094675 | |||||
SCORE 99 N concrete foundation curb on Current use: Office | Permit id: #200507288920 | |||||
SCORE 100 Fire alarm ti for mclaren hall 4th floor. 1 sd 2 door holders Current use: Office | Permit id: #200805162219 | |||||
Internal remodel to extg dorm washrooms and new r. A. Apartment and reading room. Date: January 27, 2011 Current use: Apartments | Permit id: #201101279178 | |||||
SCORE 86 Fire alarm t. I at 2345 golden gate phelan hall. 1-monitor module 5-synch module 6-control relays 6 - smoke detectors 1- duct detector 1- booster power supply - hornstrobes - wall strobes - wall Date: November 22, 2011 Contractor: Richard Haswell Current use: Apartments | Permit id: #201111229422 | |||||
SCORE 99 Internal remodel to extg dorm washrooms and new r. A. Apartment and reading room open lounge. Current use: Apartments | Permit id: #201101279178 | |||||
Usf. Voluntary seismic upgrade to existing basement thru the sixth floor of the seven story bldg no change of occupancy. Date: March 2, 2011 Current use: Apartments | Permit id: #201103021231 | |||||
Revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical plumbing openings in (e) concrete slab on 5 floors (2-6). Infill openings with new concrete. No exterior work no change of use Date: April 15, 2011 Current use: Apartments | Permit id: #201104154222 | |||||
SCORE 99 Usf phelan hall. For limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. Local structural member strengthening. No change of occupancy (per general portion of asce-41 procedure with certain exceptions). See engineers statement dated 4-18-11 attached. Current use: Apartments | Permit id: #201103021231 | |||||
SCORE 99 Revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical plumbing openings in (e) concrete slab on 5 floors (2-6). Infill openings with new concrete. No exterior work no change of use Current use: Apartments | Permit id: #201104154222 | |||||
Window replacement to 1 windows. Partially visible from street. U = 0. 47 for all replacement window. Existing alum & steel wndows replaced to alum. Date: May 5, 2011 Current use: Apartments | Permit id: #201105055449 | |||||
SCORE 99 Usf voluntary seismic upgrade of (e) bldg (mcclarren hall) no change of occupancy. In tandem permit with phelan hall pa# 2011 03 02 1231. For same scope of work. Both bldgs share same address block lot. This pa is for mclaren hall (per general portion of asce 41 procedure with certain exception Current use: Apartments | Permit id: #201105065532 | |||||
SCORE 100 Install piping system in core area of 2nd thur 6th flrs which compries the common bathrm area accessible bedrm area. The i. T room reading rom & the prefect aptment & elevator lobby. Piping in corridors shall not be installed until the commencement of phase #2 construction Current use: Apartments | Permit id: #201106037388 | |||||
SCORE 99 Refer to arch pa# 2011-0127-9178-replace shower room exhaust fan install new exhaust fan & air handling unit on roof. New supply & exhaust ductwork for 5 floors. Current use: Apartments | Permit id: #201106278978 | |||||
SCORE 99 2nd 3rd 4th 5th & 6th flrs-revision to pa# 2011-0627-8978-change exhaust fsds to subducts with exhaust at roof on emergency power Current use: Apartments | Permit id: #201107069551 | |||||
SCORE 99 Window replacement to 1 windows. Partially visible from street. U = 0. 47 for all replacement window. Existing alum & steel wndows replaced to alum. No change in opening size. Current use: Apartments | Permit id: #201105055449 | |||||
SCORE 86 F a upgrade at usf phelan hall. Permit is to allow insp of existing devices refitted in phase 1 and existg areas. Phase 2 is pending completion and will have both phases incorporated. 5-new smoke detectrs 5-new switching modules & 5 new horn strobes for ada. Plans req before final. Current use: Office | Permit id: #201108192852 | |||||
SCORE 95 Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Date: January 27, 2012 Contractor: Owner Current use: Apartments | Permit id: #201201273064 | |||||
SCORE 99 Accessiblity entry upgrade with elevation & internal renovations. Mep under separate permit. Include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. Demo (e) office & restroom & install new replacement accessible restroom & relocated. Current use: Office | Permit id: #201207034034 | |||||
SCORE 93 Update as builts all room designations changed floors moved up 1 level Current use: Apartments | Permit id: #201211073705 | |||||
SCORE 95 Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Date: February 13, 2012 Contractor: Owner Current use: Apartments | Permit id: #201202134093 | |||||
SCORE 99 Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Current use: Apartments | Permit id: #201201273064 | |||||
SCORE 99 Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Existing residential dorms on the basement level ground floor and 1st floor. No change of use. Current use: Apartments | Permit id: #201202134093 | |||||
Accessiblity entry upgrade with elevation & internal renovations. Mep under separate permit. Include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. Demo (e) office & restroom & install new replacement accessible restroom & relocate. Date: July 3, 2012 Value: $2,000,000 Current use: Office | Permit id: #201207034034 | |||||
SCORE 100 Install 2 strobes 17 horn strobes 3 horns interposing relays 3 duct detectors 1 heat detector 23 smoke detectors 2 pull stations and 19 control relays. Relocate facp. Current use: Office | Permit id: #201207275970 | |||||
SCORE 79 Fire alarm ti for floors 2 to 5. Added 18 smoke detectors; added horn strobes; added strobes; added 22 fsds Current use: Apartments | Permit id: #201208097004 | |||||
SCORE 99 Reduce scope of work from application #201207034034. Remove planter new landscape in its place. All work on campus. Date: May 21, 2013 Contractor: Doug Gearman Current use: Office | Permit id: #201305217513 | |||||
SCORE 99 Reduce scope of work from application #201207034034. Remove planter new landscape in its place. All work on campus. Current use: Office | Permit id: #201305217513 | |||||
SCORE 100 T. I. Add 14 relocate 6 sprinklers for new ceiling configurations or layout. Current use: Office | Permit id: #201307021012 | |||||
SCORE 100 Phelan hall 1st & 2nd floor:install 31 horn strobes 27 horns 4 strobes 11 smoke detectors 2 control relays 2 interposing relays. 1 booster supply. 1 synchronization module. All additions are tied into the extg system. Current use: Office | Permit id: #201308023403 | |||||
SCORE 99 To obtain final inspection for work approved under pa# 201107069551. All work is complete. Current use: Apartments | Permit id: #201409156323 | |||||
SCORE 99 To obtain final inspection for work approved under pa# 201104154222. All work is complete. Current use: Apartments | Permit id: #201409156325 | |||||
SCORE 95 Reconfigure lighting power and fire alarm at lobby and large work space office. Add outdoor bollards. (58) lights (10) switches (25) receptacles (42) circuits @ usf mclaren hall - 2345 golden gate ave. Date: August 8, 2013 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130710621 | |||||
SCORE 95 Data cabling at usf phelan hall - 1st floor Date: August 3, 2012 Contractor: Paganini Communications Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120803301 | |||||
SCORE 95 Data cabling at usf phelan hall - basement Date: August 3, 2012 Contractor: Paganini Communications Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120803262 | |||||
SCORE 95 (6) lights (2) switches (26) receptacles (30) circuits. Date: February 17, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120217981 | |||||
SCORE 95 Witness test - remodel of lobby lounge restrooms @ phelan hall - 2345 golden gate ave. Date: August 23, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120821841 | |||||
SCORE 95 Data cabling at usf phelan hall - ground floor Date: August 3, 2012 Contractor: Paganini Communications Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120803282 | |||||
SCORE 95 See permit numbers ew20130311681 and ew20130611661. Witness test for floors 1 & 2 @ usf phelan hall - 2345 golden gate ave. Date: August 8, 2013 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130805361 | |||||
New exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. Date: August 4, 2015 Permit type: Building permit | Current use: Apartments | Permit id: #201508043284 | |||||
SCORE 95 Witness test at phelan hall - 2345 golden gate ave (multiple floors). Date: August 13, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120808801 | |||||
SCORE 95 Replace existing panel with new. (93) lights (30) switches (124) receptacles (54) circuits. Usf phelan hall - 2345 golden gate ave. 2nd floor. Date: March 11, 2013 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130311681 | |||||
SCORE 95 Replace existing panel with new. (50) lights (12) switches (75) receptacles (42) circuits. Usf - phelan hall - 2345 golden gate ave. 1st floor Date: March 11, 2013 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130311661 | |||||
SCORE 95 Restroom remodel on (5) floors and one new feed-thru panel per floor. (325) lights (35) switches (42) receptacles (90) circuits 200-amp feeder (5) 200-amp feed-thru panels. Date: May 17, 2011 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110517701 | |||||
SCORE 95 Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 4th floor. Date: May 11, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511001 | |||||
SCORE 95 Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 5th floor. Date: May 11, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511021 | |||||
SCORE 99 Window replacement to 1 windows. Partially visible from street. U < = 0. 47 for all replacement window. Existing alum & steel wndows replaced to alum. No change in opening size. Permit type: Building permit | Expiration date: August 12, 2013 | Current use: Apartments | Permit id: #201105055449 | |||||
Revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical plumbing openings in (e) concrete slab on 5 floors (2-6). Infill openings with new concrete. No exterior work no change of use Date: April 15, 2011 Permit type: Building permit | Current use: Apartments | Permit id: #201104154222 | |||||
Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Date: February 13, 2012 Permit type: Building permit | Current use: Apartments | Permit id: #201202134093 | |||||
SCORE 100 Work category: 2pb; underground plumbing for laundry room and adjacent apartment. Includes plumbing for ground and first floor dorm showers and restrooms. Date: February 17, 2012 Contractor: Pribuss Engineering Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120217414 | |||||
SCORE 100 Work category: 5p; remodel conferennce area room Date: February 7, 2013 Contractor: Pribuss Engineering Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130207540 | |||||
Internal remodel to extg dorm washrooms and new r. A. Apartment and reading room. Date: January 27, 2011 Permit type: Building permit | Current use: Apartments | Permit id: #201101279178 | |||||
Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Date: January 27, 2012 Permit type: Building permit | Current use: Apartments | Permit id: #201201273064 | |||||
SCORE 99 2nd 3rd 4th 5th & 6th flrs-revision to pa# 2011-0627-8978-change exhaust fsds to subducts with exhaust at roof on emergency power Permit type: Building permit | Expiration date: November 7, 2011 | Current use: Apartments | Permit id: #201107069551 | |||||
SCORE 100 Shower pans (63) in 5 floors; 11 inspections. Date: July 12, 2011 Contractor: K Z Tile Company Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20110712506 | |||||
SCORE 95 12 shower pans on floors 2-6 building app# 201201273064 Date: July 5, 2012 Contractor: Turner Construction Co Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120705811 | |||||
SCORE 100 Work category: 3pa; modernization phase 2 includes common restrooms showers common kitchen student apartments laundry facilities gas piping and domestic water heat exchanger. Date: July 23, 2012 Contractor: Pribuss Engineering Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120723386 | |||||
SCORE 95 Shower pan in basement level. Date: July 30, 2012 Contractor: Turner Construction Co Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120730408 | |||||
SCORE 95 Install a vdf for an exhaust fan. Conduit and wiring. Date: August 5, 2016 Contractor: Sierra Electric Co Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201607269571 | |||||
Accessiblity entry upgrade with elevation & internal renovations. Mep under separate permit. Include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. Demo (e) office & restroom & install new replacement accessible restroom & relocate. Date: July 3, 2012 Value: $2,000,000 Permit type: Building permit | Current use: Office | Permit id: #201207034034 | |||||
SCORE 99 Refer to arch pa# 2011-0127-9178-replace shower room exhaust fan install new exhaust fan & air handling unit on roof. New supply & exhaust ductwork for 5 floors. Permit type: Building permit | Expiration date: June 28, 2013 | Current use: Apartments | Permit id: #201106278978 | |||||
SCORE 82 Install new system in core areas 2 3 4 5 &6 only Date: June 17, 2011 Contractor: Rcm Fire Protection Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20110617986 | |||||
SCORE 99 Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Existing residential dorms on the basement level ground floor and 1st floor. No change of use. Permit type: Building permit | Expiration date: June 28, 2015 | Current use: Apartments | Permit id: #201202134093 | |||||
SCORE 99 Reduce scope of work from application #201207034034. Remove planter new landscape in its place. All work on campus. Permit type: Building permit | Expiration date: October 14, 2013 | Current use: Office | Permit id: #201305217513 | |||||
SCORE 99 Internal remodel to extg dorm washrooms and new r. A. Apartment and reading room + open lounge. Permit type: Building permit | Expiration date: March 1, 2014 | Current use: Apartments | Permit id: #201101279178 | |||||
Usf. Voluntary seismic upgrade to existing basement thru the sixth floor of the seven story bldg no change of occupancy. Date: March 2, 2011 Permit type: Building permit | Current use: Apartments | Permit id: #201103021231 | |||||
SCORE 99 Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Permit type: Building permit | Expiration date: September 28, 2014 | Current use: Apartments | Permit id: #201201273064 | |||||
SCORE 99 Usf phelan hall. For limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. Local structural member strengthening. No change of occupancy (per general portion of asce-41 procedure with certain exceptions). See engineers statement dated 4-18-11 attached. Permit type: Building permit | Expiration date: May 19, 2013 | Current use: Apartments | Permit id: #201103021231 | |||||
SCORE 99 Revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical plumbing openings in (e) concrete slab on 5 floors (2-6). Infill openings with new concrete. No exterior work no change of use Permit type: Building permit | Expiration date: May 19, 2012 | Current use: Apartments | Permit id: #201104154222 | |||||
Window replacement to 1 windows. Partially visible from street. U Date: May 5, 2011 Permit type: Building permit | Current use: Apartments | Permit id: #201105055449 | |||||
SCORE 100 Work category: 3pb; toilet and shower room remodel on floors 2 through 6 of and existing dormitory building Date: May 27, 2011 Contractor: Pribuss Engineering Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110527721 | |||||
SCORE 99 Reduce scope of work from application #201207034034. Remove planter new landscape in its place. All work on campus. Date: May 21, 2013 Contractor: Doug Gearman Permit type: Building permit | Current use: Office | Permit id: #201305217513 | |||||
SCORE 95 Shower pans on ground and 1st floors.(17 shower pans). App#201202134093 Date: May 7, 2013 Contractor: Turner Construction Co Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130507530 | |||||
SCORE 86 Fire alarm t. I at 2345 golden gate phelan hall. 1-monitor module 5-synch module 6-control relays 6 - smoke detectors 1- duct detector 1- booster power supply - hornstrobes - wall strobes - wall Date: November 22, 2011 Contractor: Richard Haswell Permit type: Building permit | Current use: Apartments | Permit id: #201111229422 | |||||
SCORE 99 Accessiblity entry upgrade with elevation & internal renovations. Mep under separate permit. Include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. Demo (e) office & restroom & install new replacement accessible restroom & relocated. Permit type: Building permit | Expiration date: May 9, 2015 | Current use: Office | Permit id: #201207034034 | |||||
SCORE 93 Update as builts all room designations changed floors moved up 1 level Permit type: Building permit | Expiration date: March 7, 2013 | Current use: Apartments | Permit id: #201211073705 | |||||
SCORE 99 To obtain final inspection for work approved under pa# 201107069551. All work is complete. Permit type: Building permit | Expiration date: January 15, 2015 | Current use: Apartments | Permit id: #201409156323 | |||||
SCORE 99 To obtain final inspection for work approved under pa# 201104154222. All work is complete. Permit type: Building permit | Expiration date: January 15, 2015 | Current use: Apartments | Permit id: #201409156325 | |||||
New exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust relief. Date: August 4, 2015 Permit type: Building permit | Current use: Apartments | Permit id: #201508043284 | |||||
SCORE 95 Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Date: February 13, 2012 Contractor: Owner Permit type: Building permit | Current use: Apartments | Permit id: #201202134093 | |||||
SCORE 95 Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Date: January 27, 2012 Contractor: Owner Permit type: Building permit | Current use: Apartments | Permit id: #201201273064 | |||||
Window replacement to 1 windows. Partially visible from street. U < = 0. 47 for all replacement window. Existing alum & steel wndows replaced to alum. Date: May 5, 2011 Permit type: Building permit | Current use: Apartments | Permit id: #201105055449 | |||||
SCORE 95 Lobby/reception area remodel. (75) lights; (12) switches; (70) receptacles; (42) circuits; 1 amp feeder; 100-amp panelboard at usf phelan hall. Date: May 11, 2012 Contractor: Paganini Electric Corp Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511981 | |||||
New fire alarm devices connected to an existing fire alarm system in new 4-=story building Permit status: Complete | Permit id: E20030730980 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 5th floor. Permit status: Complete | Permit id: Ew20120511021 | |||||
4th floor Permit status: Complete | Permit id: Ew20050616878 | |||||
Data cabling at usf phelan hall - 1st floor Permit status: Expired | Permit id: Ew20120803301 | |||||
Reconfigure lighting power and fire alarm at lobby and large work space office. Add outdoor bollards. (58) lights (10) switches (25) receptacles (42) circuits @ usf mclaren hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20130710621 | |||||
Data cabling at usf phelan hall - ground floor Permit status: Expired | Permit id: Ew20120803282 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 4th floor. Permit status: Complete | Permit id: Ew20120511001 | |||||
Witness test - remodel of lobby lounge restrooms @ phelan hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20120821841 | |||||
(6) lights (2) switches (26) receptacles (30) circuits. Permit status: Complete | Permit id: Ew20120217981 | |||||
Data cabling at usf phelan hall - basement Permit status: Expired | Permit id: Ew20120803262 | |||||
Complete electrical install for new 4-story buildintg with classrooms and offices Permit status: Complete | Permit id: E20030730978 | |||||
Replace existing panel with new. (93) lights (30) switches (124) receptacles (54) circuits. Usf phelan hall - 2345 golden gate ave. 2nd floor. Permit status: Complete | Permit id: Ew20130311681 | |||||
See permit numbers ew20130311681 and ew20130611661. Witness test for floors 1 & 2 @ usf phelan hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20130805361 | |||||
48 horns 14 smoke detectors 2 horn strobes 1 booster panel 3 modules Permit status: Complete | Permit id: E200308061255 | |||||
Life safety witness mclaren hall Permit status: Complete | Permit id: E200308061256 | |||||
Replace existing panel with new. (50) lights (12) switches (75) receptacles (42) circuits. Usf - phelan hall - 2345 golden gate ave. 1st floor Permit status: Complete | Permit id: Ew20130311661 | |||||
Witness test at phelan hall - 2345 golden gate ave (multiple floors). Permit status: Complete | Permit id: Ew20120808801 | |||||
Restroom remodel on (5) floors and one new feed-thru panel per floor. (325) lights (35) switches (42) receptacles (90) circuits 200-amp feeder (5) 200-amp feed-thru panels. Permit status: Complete | Permit id: Ew20110517701 | |||||
Convert electrical hardwire power for atm into duplex receptacle. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080819682 | |||||
Lobby reception area remodel. (75) lights; (12) switches; (70) receptacles; (42) circuits; 1 amp feeder; 100-amp panelboard at usf phelan hall. Permit status: Complete | Permit id: Ew20120511981 | |||||
Install a vdf for an exhaust fan. Conduit and wiring. Permit status: Filed | Permit id: Ew201607269571 | |||||
Lobby reception area remodel. (75) lights; (12) switches; (70) receptacles; (42) circuits; 1 amp feeder; 100-amp panelboard at usf phelan hall. Permit status: Complete | Permit id: Ew20120511981 | |||||
Convert electrical hardwire power for atm into duplex receptacle. [scope of work does not include residential electric space heater installation.] Permit status: Complete | Permit id: Ew20080819682 | |||||
Restroom remodel on (5) floors and one new feed-thru panel per floor. (325) lights (35) switches (42) receptacles (90) circuits 200-amp feeder (5) 200-amp feed-thru panels. Permit status: Complete | Permit id: Ew20110517701 | |||||
Witness test at phelan hall - 2345 golden gate ave (multiple floors). Permit status: Complete | Permit id: Ew20120808801 | |||||
Replace existing panel with new. (50) lights (12) switches (75) receptacles (42) circuits. Usf - phelan hall - 2345 golden gate ave. 1st floor Permit status: Complete | Permit id: Ew20130311661 | |||||
48 horns 14 smoke detectors 2 horn strobes 1 booster panel 3 modules Permit status: Complete | Permit id: E200308061255 | |||||
See permit numbers ew20130311681 and ew20130611661. Witness test for floors 1 & 2 @ usf phelan hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20130805361 | |||||
Replace existing panel with new. (93) lights (30) switches (124) receptacles (54) circuits. Usf phelan hall - 2345 golden gate ave. 2nd floor. Permit status: Complete | Permit id: Ew20130311681 | |||||
Complete electrical install for new 4-story buildintg with classrooms and offices Permit status: Complete | Permit id: E20030730978 | |||||
Data cabling at usf phelan hall - basement Permit status: Expired | Permit id: Ew20120803262 | |||||
(6) lights (2) switches (26) receptacles (30) circuits. Permit status: Complete | Permit id: Ew20120217981 | |||||
Witness test - remodel of lobby lounge restrooms @ phelan hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20120821841 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 4th floor. Permit status: Complete | Permit id: Ew20120511001 | |||||
Data cabling at usf phelan hall - ground floor Permit status: Expired | Permit id: Ew20120803282 | |||||
Reconfigure lighting power and fire alarm at lobby and large work space office. Add outdoor bollards. (58) lights (10) switches (25) receptacles (42) circuits @ usf mclaren hall - 2345 golden gate ave. Permit status: Complete | Permit id: Ew20130710621 | |||||
Data cabling at usf phelan hall - 1st floor Permit status: Expired | Permit id: Ew20120803301 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 5th floor. Permit status: Complete | Permit id: Ew20120511021 | |||||
New fire alarm devices connected to an existing fire alarm system in new 4-=story building Permit status: Complete | Permit id: E20030730980 | |||||
4th floor Permit status: Complete | Permit id: Ew20050616878 | |||||
Life safety witness mclaren hall Permit status: Complete | Permit id: E200308061256 | |||||
Install a vdf for an exhaust fan. Conduit and wiring. Permit status: Filed | Permit id: Ew201607269571 | |||||
Add 1 door for security reasons in hallway at 2nd floor. Rev 200205176919 Date: January 27, 2005 Value: $3,000 Permit type: Otc alterations permit | Completion date: May 2, 2005 | Expiration date: January 27, 2005 | Current use: School | Permit id: 200501274172 | |||||
Interior non structural demo permit & minor t. T. On 4th floor. Permit correct to "as build" Date: June 9, 2005 Value: $5,000 Permit type: Otc alterations permit | Completion date: August 24, 2005 | Expiration date: June 9, 2005 | Current use: Office | Permit id: 200506094675 | |||||
N concrete foundation curb on Date: July 28, 2005 Value: $8,000 Permit type: Otc alterations permit | Completion date: March 16, 2017 | Expiration date: July 28, 2005 | Current use: Office | Permit id: 200507288920 | |||||
Life safety upgrades, fire alarms Date: September 5, 2001 Value: $52,440 Permit type: Additions alterations or repairs | Completion date: January 15, 2002 | Expiration date: August 6, 2001 | Current use: Apartments | Permit id: 200108065325 | |||||
Renovate (e) 5 story, 40,000, office bldg, faculty and staff offices, upgrades and site work Date: May 20, 2003 Value: $6,500,000 Permit type: Additions alterations or repairs | Completion date: March 14, 2005 | Expiration date: May 17, 2002 | Current use: School | Permit id: 200205176919 | |||||
Street space & sidewalk repair Date: December 6, 2002 Permit type: Otc alterations permit | Expiration date: December 6, 2002 | Permit id: M22370 | |||||
Furnish and install horns in dorm rooms on 4th 5th floorsfor fire alarm . Furnish and install strobes Date: August 1, 2003 Value: $20,000 Permit type: Otc alterations permit | Expiration date: August 1, 2003 | Current use: School | Permit id: 200308010990 | |||||
Add smoke detector heat detector duct detector manual pull station door hold on control elevator Date: October 20, 2003 Value: $30,000 Permit type: Otc alterations permit | Completion date: October 18, 2004 | Expiration date: October 20, 2003 | Current use: Apartments | Permit id: 200310207879 | |||||
Install new stand pipe system in new bldg. & modify fire hose cabinets in (e) bldg. Date: April 15, 2004 Value: $18,000 Permit type: Additions alterations or repairs | Completion date: October 18, 2004 | Expiration date: April 1, 2004 | Current use: School | Permit id: 200404010233 | |||||
Reve200205176919. R-5. Add new stair to connect 2nd fl addition to 3rd fl (e) mclaren bldg. Copy of Date: July 13, 2004 Value: $1,000 Permit type: Additions alterations or repairs | Completion date: November 12, 2004 | Expiration date: June 15, 2004 | Current use: School | Permit id: 200406156480 | |||||
Revision to approved pa 200205176919 r5. To create (n) walkway & van accessible replacing previously Date: August 19, 2004 Value: $17,500 Permit type: Additions alterations or repairs | Completion date: October 18, 2004 | Expiration date: June 29, 2004 | Current use: School | Permit id: 200406297603 | |||||
Revision to pa 200205176919, change courtyard, new scoring pattern in concrete, drinage layout, relo Date: July 7, 2004 Value: $4,500 Permit type: Otc alterations permit | Completion date: October 18, 2004 | Expiration date: July 7, 2004 | Current use: School | Permit id: 200407078218 | |||||
Revise to app #2002 05 17 6919. Scope of revision is to relocate the (e) entry door & install a (n) Date: November 5, 2004 Value: $20,000 Permit type: Additions alterations or repairs | Completion date: March 11, 2005 | Expiration date: September 7, 2004 | Current use: School | Permit id: 200409073455 | |||||
Otc alterations permit Date: October 22, 2004 Expiration date: October 22, 2004 | Permit id: M29850 | |||||
Fire alarm ti for mclaren hall, 4th floor. 1 sd, 2 door holders Date: May 16, 2008 Value: $5,118 Permit type: Otc alterations permit | Expiration date: May 16, 2008 | Current use: Office | Permit id: 200805162219 | |||||
Internal remodel to extg dorm washrooms and new r. A. Apartment and reading room + open lounge. Date: March 1, 2011 Value: $6,000,000 Permit type: Otc alterations permit | Completion date: September 29, 2014 | Expiration date: January 27, 2011 | Current use: Apartments | Permit id: 201101279178 | |||||
Usf phelan hall. For limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. Local structural member strengthening. No change of occupancy (per general portion of asce-41 procedure with certain exceptions). See engineers statement dated 4-18-11 attached. Date: May 19, 2011 Value: $890,000 Permit type: Additions alterations or repairs | Completion date: August 7, 2014 | Expiration date: March 2, 2011 | Current use: Apartments | Permit id: 201103021231 | |||||
Revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical, plumbing openings in (e) concrete slab on 5 floors (2-6). Infill openings with new concrete. No exterior work no change of use Date: May 19, 2011 Value: $30,000 Permit type: Otc alterations permit | Completion date: September 29, 2014 | Expiration date: April 15, 2011 | Current use: Apartments | Permit id: 201104154222 | |||||
Window replacement to 1 windows. Partially visible from street. U < = 0. 47 for all replacement window. Existing alum & steel wndows replaced to alum. No change in opening size. Date: August 12, 2011 Value: $65,000 Permit type: Additions alterations or repairs | Completion date: November 3, 2011 | Expiration date: May 5, 2011 | Current use: Apartments | Permit id: 201105055449 | |||||
Usf voluntary seismic upgrade of (e) bldg (mcclarren hall), no change of occupancy. In tandem permit with phelan hall pa# 2011 03 02 1231. For same scope of work. Both bldgs share same address block lot. This pa is for mclaren hall (per general portion of asce 41 procedure with certain exception Date: May 19, 2011 Value: $150,000 Permit type: Additions alterations or repairs | Completion date: February 11, 2015 | Expiration date: May 6, 2011 | Current use: Apartments | Permit id: 201105065532 | |||||
Install piping system in core area of 2nd thur 6th flrs which compries the common bathrm area, accessible bedrm area. The i. T room, reading rom & the prefect aptment & elevator lobby. Piping in corridors shall not be installed until the commencement of phase #2 construction Date: June 17, 2011 Value: $120,000 Permit type: Otc alterations permit | Completion date: October 18, 2016 | Expiration date: June 3, 2011 | Current use: Apartments | Permit id: 201106037388 | |||||
Refer to arch pa# 2011-0127-9178-replace shower room exhaust fan, install new exhaust fan & air handling unit on roof. New supply & exhaust ductwork for 5 floors. Date: June 28, 2011 Value: $321,000 Permit type: Otc alterations permit | Completion date: September 29, 2014 | Expiration date: June 27, 2011 | Current use: Apartments | Permit id: 201106278978 | |||||
2nd, 3rd, 4th, 5th & 6th flrs-revision to pa# 2011-0627-8978-change exhaust fsds to subducts with exhaust at roof on emergency power Date: July 7, 2011 Value: $1 Permit type: Otc alterations permit | Expiration date: July 6, 2011 | Current use: Apartments | Permit id: 201107069551 | |||||
F a upgrade at usf phelan hall. Permit is to allow insp of existing devices refitted in "phase 1" and existg areas. Phase 2 is pending completion and will have both phases incorporated. 5-new smoke detectrs 5-new switching modules & 5 new horn strobes for ada. Plans req before final. Date: August 19, 2011 Value: $1 Permit type: Otc alterations permit | Completion date: September 9, 2014 | Expiration date: August 19, 2011 | Current use: Office | Permit id: 201108192852 | |||||
Fire alarm t. I at 2345 golden gate, phelan hall. 1-monitor module 5-synch module 6-control relays 6 - smoke detectors 1- duct detector 1- booster power supply - hornstrobes - wall strobes - wall Date: November 22, 2011 Value: $23,000 Permit type: Additions alterations or repairs | Expiration date: November 22, 2011 | Current use: Apartments | Permit id: 201111229422 | |||||
Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Date: March 28, 2012 Value: $2,000,000 Permit type: Otc alterations permit | Completion date: August 7, 2014 | Expiration date: January 27, 2012 | Current use: Apartments | Permit id: 201201273064 | |||||
Interior remodel of basement, ground floor and 1st floor. Work to include restroom upgrades, new finishes and dorm room remodel. Existing residential dorms on the basement level, ground floor and 1st floor. No change of use. Date: June 28, 2012 Value: $6,000,000 Permit type: Additions alterations or repairs | Completion date: August 19, 2013 | Expiration date: February 13, 2012 | Current use: Apartments | Permit id: 201202134093 | |||||
Accessiblity entry upgrade with elevation & internal renovations. Mep under separate permit. Include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. Demo (e) office & restroom & install new replacement accessible restroom & relocated. Date: November 9, 2012 Value: $2,000,000 Permit type: Additions alterations or repairs | Completion date: February 11, 2015 | Expiration date: July 3, 2012 | Current use: Office | Permit id: 201207034034 | |||||
Install 2 strobes, 17 horn strobes, 3 horns, interposing relays, 3 duct detectors, 1 heat detector, 23 smoke detectors, 2 pull stations, and 19 control relays. Relocate facp. Date: July 31, 2012 Value: $29,000 Permit type: Otc alterations permit | Completion date: August 20, 2012 | Expiration date: July 27, 2012 | Current use: Office | Permit id: 201207275970 | |||||
Fire alarm ti for floors 2 to 5. Added 18 smoke detectors; added horn strobes; added strobes; added 22 fsds Date: August 10, 2012 Value: $20,000 Permit type: Otc alterations permit | Completion date: August 20, 2012 | Expiration date: August 9, 2012 | Current use: Apartments | Permit id: 201208097004 | |||||
Update as builts, all room designations changed, floors moved up 1 level Date: November 7, 2012 Value: $2,500 Permit type: Otc alterations permit | Completion date: December 5, 2012 | Expiration date: November 7, 2012 | Current use: Apartments | Permit id: 201211073705 | |||||
Reduce scope of work from application #201207034034. Remove planter, new landscape in its place. All work on campus. Date: June 14, 2013 Value: $1 Permit type: Otc alterations permit | Completion date: February 11, 2015 | Expiration date: May 21, 2013 | Current use: Office | Permit id: 201305217513 | |||||
T. I. Add 14 relocate 6 sprinklers for new ceiling configurations or layout. Date: July 2, 2013 Value: $7,350 Permit type: Otc alterations permit | Completion date: July 22, 2013 | Expiration date: July 2, 2013 | Current use: Office | Permit id: 201307021012 | |||||
Phelan hall 1st & 2nd floor:install 31 horn strobes, 27 horns, 4 strobes, 11 smoke detectors, 2 control relays, 2 interposing relays. 1 booster supply. 1 synchronization module. All additions are tied into the extg system. Date: August 2, 2013 Value: $25,000 Permit type: Otc alterations permit | Completion date: August 12, 2013 | Expiration date: August 2, 2013 | Current use: Office | Permit id: 201308023403 | |||||
To obtain final inspection for work approved under pa# 201107069551. All work is complete. Date: September 15, 2014 Value: $1 Permit type: Otc alterations permit | Completion date: September 29, 2014 | Expiration date: September 15, 2014 | Current use: Apartments | Permit id: 201409156323 | |||||
To obtain final inspection for work approved under pa# 201104154222. All work is complete. Date: September 15, 2014 Value: $1 Permit type: Otc alterations permit | Completion date: September 29, 2014 | Expiration date: September 15, 2014 | Current use: Apartments | Permit id: 201409156325 | |||||
New exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust relief. N a maher ord. 155-13 Date: May 20, 2016 Value: $30,000 Permit type: Otc alterations permit | Completion date: April 27, 2017 | Expiration date: August 4, 2015 | Current use: Apartments | Permit id: 201508043284 | |||||
48 horns, 14 smoke detectors, 2 horn strobes, 1 booster panel, 3 modules Date: August 6, 2003 Permit status: Complete | Completion date: August 11, 2003 | Permit id: E200308061255 | |||||
Witness test at phelan hall - 2345 golden gate ave (multiple floors). Date: August 8, 2012 Permit status: Complete | Completion date: August 13, 2012 | Permit id: Ew20120808801 | |||||
Complete electrical install for new 4-story buildintg with classrooms and offices Date: July 30, 2003 Permit status: Complete | Completion date: August 30, 2004 | Permit id: E20030730978 | |||||
Data cabling at usf phelan hall - ground floor Date: August 3, 2012 Permit status: Expired | Permit id: Ew20120803282 | |||||
Install a vdf for an exhaust fan. Conduit and wiring. Date: July 26, 2016 Permit status: Complete | Completion date: August 5, 2016 | Permit id: Ew201607269571 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 5th floor. Date: May 11, 2012 Permit status: Complete | Completion date: August 21, 2012 | Permit id: Ew20120511021 | |||||
New fire alarm devices connected to an existing fire alarm system in new 4-=story building Date: July 30, 2003 Permit status: Complete | Completion date: July 21, 2005 | Permit id: E20030730980 | |||||
Replace existing panel with new. (93) lights, (30) switches, (124) receptacles, (54) circuits. Usf phelan hall - 2345 golden gate ave., 2nd floor. Date: March 11, 2013 Permit status: Complete | Completion date: August 8, 2013 | Permit id: Ew20130311681 | |||||
Life safety witnessmclaren hall Date: August 6, 2003 Permit status: Complete | Completion date: August 11, 2003 | Permit id: E200308061256 | |||||
Data cabling at usf phelan hall - 1st floor Date: August 3, 2012 Permit status: Expired | Permit id: Ew20120803301 | |||||
Replace existing panel with new. (50) lights, (12) switches, (75) receptacles, (42) circuits. Usf - phelan hall - 2345 golden gate ave., 1st floor Date: March 11, 2013 Permit status: Complete | Completion date: August 26, 2013 | Permit id: Ew20130311661 | |||||
Data cabling at usf phelan hall - basement Date: August 3, 2012 Permit status: Expired | Permit id: Ew20120803262 | |||||
Witness test - remodel of lobby, lounge, restrooms @ phelan hall - 2345 golden gate ave. Date: August 21, 2012 Permit status: Complete | Completion date: August 23, 2012 | Permit id: Ew20120821841 | |||||
Convert electrical hardwire power for atm into duplex receptacle. [scope of work does not include residential electric space heater installation.] Date: August 19, 2008 Permit status: Complete | Completion date: January 23, 2009 | Permit id: Ew20080819682 | |||||
(6) lights, (2) switches, (26) receptacles, (30) circuits. Date: February 17, 2012 Permit status: Complete | Completion date: January 24, 2013 | Permit id: Ew20120217981 | |||||
See permit numbers ew20130311681 and ew20130611661. Witness test for floors 1 & 2 @ usf phelan hall - 2345 golden gate ave. Date: August 5, 2013 Permit status: Complete | Completion date: August 8, 2013 | Permit id: Ew20130805361 | |||||
Reconfigure lighting, power and fire alarm at lobby and large work space office. Add outdoor bollards. (58) lights, (10) switches, (25) receptacles, (42) circuits @ usf mclaren hall - 2345 golden gate ave. Date: July 10, 2013 Permit status: Complete | Completion date: August 8, 2013 | Permit id: Ew20130710621 | |||||
Restroom remodel on (5) floors and one new feed-thru panel per floor. (325) lights, (35) switches, (42) receptacles, (90) circuits, 200-amp feeder, (5) 200-amp feed-thru panels. Date: May 17, 2011 Permit status: Complete | Completion date: September 12, 2011 | Permit id: Ew20110517701 | |||||
4th floor Date: June 16, 2005 Permit status: Complete | Completion date: August 11, 2005 | Permit id: Ew20050616878 | |||||
Lobby reception area remodel. (75) lights; (12) switches; (70) receptacles; (42) circuits; 1 amp feeder; 100-amp panelboard at usf phelan hall. Date: May 11, 2012 Permit status: Complete | Completion date: January 24, 2013 | Permit id: Ew20120511981 | |||||
Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 4th floor. Date: May 11, 2012 Permit status: Complete | Completion date: August 21, 2012 | Permit id: Ew20120511001 | |||||
Work category: 3pa; modernization phase 2 includes common restrooms, showers, common kitchen, student apartments, laundry facilities, gas piping and domestic water heat exchanger. Date: July 23, 2012 Permit status: Expired | Expiration date: July 23, 2012 | Permit id: Pw20120723386 | |||||
Shower pan in basement level. Date: July 30, 2012 Permit status: Complete | Completion date: August 9, 2012 | Expiration date: July 30, 2012 | Permit id: Pp20120730408 | |||||
Work category: 5p; remodel conferennce area room Date: February 7, 2013 Permit status: Complete | Completion date: July 30, 2013 | Expiration date: February 7, 2013 | Permit id: Pw20130207540 | |||||
Work category: 2pb; underground plumbing for laundry room and adjacent apartment. Includes plumbing for ground and first floor dorm showers and restrooms. Date: February 17, 2012 Permit status: Expired | Expiration date: February 17, 2012 | Permit id: Pw20120217414 | |||||
12 shower pans, on floors 2-6 building app# 201201273064 Date: July 5, 2012 Permit status: Complete | Completion date: July 12, 2012 | Expiration date: July 5, 2012 | Permit id: Pp20120705811 | |||||
Work category: 5m; install (1) environmental air exhaust fan with associated ductwork in basement under building permit 201508043284 Date: July 26, 2016 Permit status: Complete | Completion date: August 4, 2016 | Expiration date: July 26, 2016 | Permit id: Pmw20160726293 | |||||
Work category: 3pb; toilet and shower room remodel on floors 2 through 6 of and existing dormitory building Date: May 27, 2011 Permit status: Complete | Completion date: September 16, 2011 | Expiration date: May 27, 2011 | Permit id: Pw20110527721 | |||||
Install new system in core areas, 2,3,4,5,&6 only Date: June 17, 2011 Permit status: Expired | Expiration date: June 17, 2011 | Permit id: Pp20110617986 | |||||
Work category: 2pb; jc - 3253 groung and 1st floor: plumbing work. Date: May 31, 2013 Permit status: Complete | Completion date: July 30, 2013 | Expiration date: May 31, 2013 | Permit id: Pw20130531042 | |||||
G f: relocate sprinkler heads in lobby area. Date: July 2, 2013 Permit status: Complete | Completion date: July 31, 2013 | Expiration date: July 2, 2013 | Permit id: Pp20130702135 | |||||
Shower pans on ground and 1st floors.(17 shower pans). App#201202134093 Date: May 7, 2013 Permit status: Complete | Completion date: June 13, 2013 | Expiration date: May 7, 2013 | Permit id: Pp20130507530 | |||||
Shower pans (63) in 5 floors; 11 inspections. Date: July 12, 2011 Permit status: Complete | Completion date: August 12, 2011 | Expiration date: July 12, 2011 | Permit id: Pp20110712506 | |||||
SCORE 86 F/a upgrade at usf phelan hall. Permit is to allow insp of existing devices refitted in "phase 1" and existg areas. Phase 2 is pending completion and will have both phases incorporated. 5-new smoke detectrs 5-new switching modules & 5 new horn/strobes for ada. Plans req before final. Permit type: Building permit | Expiration date: August 19, 2012 | Current use: Office | Permit id: #201108192852 | |||||
SCORE 95 Witness test - remodel of lobby lounge restrooms @ phelan hall - 2345 golden gate ave. Date: August 23, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120821841 | |||||
SCORE 95 Witness test at phelan hall - 2345 golden gate ave (multiple floors). Date: August 13, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120808801 | |||||
SCORE 79 Fire alarm ti for floors 2 to 5. Added 18 smoke detectors; added horn/strobes; added strobes; added 22 fsds Permit type: Building permit | Expiration date: August 10, 2013 | Current use: Apartments | Permit id: #201208097004 | |||||
SCORE 95 See permit numbers ew20130311681 and ew20130611661. Witness test for floors 1 & 2 @ usf phelan hall - 2345 golden gate ave. Date: August 8, 2013 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130805361 | |||||
SCORE 100 Phelan hall 1st & 2nd floor:install 31 horn/strobes 27 horns 4 strobes 11 smoke detectors 2 control relays 2 interposing relays. 1 booster supply. 1 synchronization module. All additions are tied into the extg system. Permit type: Building permit | Expiration date: August 2, 2014 | Current use: Office | Permit id: #201308023403 | |||||
SCORE 95 (6) lights (2) switches (26) receptacles (30) circuits. Date: February 17, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120217981 | |||||
SCORE 100 Interior remodel of basement ground floor and 1st floor. Work to include restroom upgrades new finishes and dorm room remodel. Date: February 13, 2012 Contractor: Owner Owner Permit type: Building permit | Current use: Apartments | Permit id: #201202134093 | |||||
SCORE 100 Interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms Date: January 27, 2012 Contractor: Owner Owner Permit type: Building permit | Current use: Apartments | Permit id: #201201273064 | |||||
SCORE 95 Reconfigure lighting power and fire alarm at lobby and large work space office. Add outdoor bollards. (58) lights (10) switches (25) receptacles (42) circuits @ usf mclaren hall - 2345 golden gate ave. Date: August 8, 2013 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130710621 | |||||
SCORE 100 G/f: relocate sprinkler heads in lobby area. Date: July 2, 2013 Contractor: Rcm Fire Protection Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20130702135 | |||||
SCORE 100 Install 2 strobes 17 horn/strobes 3 horns interposing relays 3 duct detectors 1 heat detector 23 smoke detectors 2 pull stations and 19 control relays. Relocate facp. Permit type: Building permit | Expiration date: July 31, 2013 | Current use: Office | Permit id: #201207275970 | |||||
SCORE 95 Replace existing panel with new. (93) lights (30) switches (124) receptacles (54) circuits. Usf phelan hall - 2345 golden gate ave. 2nd floor. Date: March 11, 2013 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130311681 | |||||
SCORE 95 Replace existing panel with new. (50) lights (12) switches (75) receptacles (42) circuits. Usf - phelan hall - 2345 golden gate ave. 1st floor Date: March 11, 2013 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130311661 | |||||
SCORE 95 Restroom remodel on (5) floors and one new feed-thru panel per floor. (325) lights (35) switches (42) receptacles (90) circuits 200-amp feeder (5) 200-amp feed-thru panels. Date: May 17, 2011 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110517701 | |||||
SCORE 99 Usf voluntary seismic upgrade of (e) bldg (mcclarren hall) no change of occupancy. In tandem permit with phelan hall pa# 2011/03/02/1231. For same scope of work. Both bldgs share same address/ block/lot. This pa is for mclaren hall (per general portion of asce 41 procedure with certain exception Permit type: Building permit | Expiration date: May 19, 2012 | Current use: Apartments | Permit id: #201105065532 | |||||
SCORE 95 Lobby reception area remodel. (75) lights; (12) switches; (70) receptacles; (42) circuits; 1 amp feeder; 100-amp panelboard at usf phelan hall. Date: May 11, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511981 | |||||
SCORE 95 Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 4th floor. Date: May 11, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511001 | |||||
SCORE 95 Remodel of restrooms and lounge. (15) lights; (8) switches; (8) receptacles at mclaren 5th floor. Date: May 11, 2012 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120511021 | |||||
SCORE 95 New exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. N/a maher ord. 155-13 Permit type: Building permit | Expiration date: May 20, 2017 | Current use: Apartments | Permit id: #201508043284 |