Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Work was done on a sewer service line in the roadway(asphalt 8x12) at this location. Date: December 23, 2011 Contractor: Dcwater Ops Permit type: Excavation; repair sewer main line | Permit status: Permit expired | Expiration date: June 22, 2012 | Permit id: Pa68132 | |||||
Dccr proposes to drill one geotechnical boring (rcagi-12) located in the parking lane of 2nd pl nw, east of the listed property (234 madison st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics fo Date: October 2, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117029 | |||||
SCORE 100 Work was done on a sewer service line in the roadway(asphalt 8x12) at this location. Date: December 23, 2011 Contractor: Dcwater Permit type: Excavation; repair sewer main line | Permit status: Permit expired | Expiration date: June 22, 2012 | Permit id: Pa68132 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (rcagi-12) located in the parking lane of 2nd pl nw, east of the listed property (234 madison st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics fo Date: October 2, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117029 | |||||
SCORE 99 Construction staging area Date: October 30, 2015 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: December 5, 2015 | Permit id: Pa10215823 |