Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 First floor: removal of load bearing wall between kitchen and dining room. Installation of steel beam to ensure structural stability of house. Upgrade of kitchen appliances and lighting, as well as finishes. Demo of damaged ceiling in living room and dining room - replaced with new drywall and new electrical and lighting. Back room - upgrade finishes, existing electrical to remain. Stabilization of this room. New powder room to be built with new plumbing and electrical as well as finishes. New front door and back door. Basement: update all finishes, new electrical in main room, bedroom and mechanical room. Mechanical to stay. Existing electric in bathroom to stay. Upgrade plumbing in bathroom and finishes. New back door. Upgrade windows in bedroom in same location of existing glass block windows. Add new window at exiting infill masonry opening. Remove existing drywall infill between mechanical and bedroom to create a door. Date: June 20, 2017 Contractor: Mike Jones Client: Kendra Chong | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709754 |