Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: May 13, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 691826 | |||||
Demolition permit Date: September 10, 2015 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Completed | Permit id: 637804 | |||||
Administrative permit Date: September 27, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 717220 | |||||
Zoning/use permit Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Completed | Permit id: 638146 | |||||
Addition permit Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 648845 | |||||
Administrative permit Date: September 27, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 717220 | |||||
Addition permit Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 648845 | |||||
Plumbing permit Date: May 13, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 691826 | |||||
Zoning use permit Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Completed | Permit id: 638146 | |||||
Electrical permit Date: November 9, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 723476 | |||||
Demolition permit Date: September 10, 2015 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Completed | Permit id: 637804 | |||||
Suppression permit Date: October 26, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit status: Active | Permit id: 721310 | |||||
SCORE 89 For the installation of a two (2) inch fire service line with backflow preventor and for the installation of a fire suppression system as per nfpa 13. All work shall be in accordance with approved plans and hydraulic calculations. Date: October 26, 2016 Contractor: Aqueduct Fire Protection Client: Tran Anh T Halpin Thomas J Jr | Permit type: Suppression permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 721310 | |||||
For the erection of a new addition on an existing attached structure with new moment frame connections and proposed private carport, new interior stair framing installation, roof deck and access pilot house, new interior partition walls, rated wall and floor ceiling assemblies, and with exterior wall coverings as per plans approved by the city planning commission. Separate permits required for all electrical, plumbing, mechanical, and fire suppression system (per nfpa 13) installation work. Separate amended permit required for documentation of special inspectors retained to perform required special inspection items. Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit type: Addition permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 648845 | |||||
Renovation and addition to an existing townhouse containing 3 single rental units into a primary residence containing 1 rental unit. Creating a new curb cut along fulton street & a new overhead gate & new door along fulton within existing brick facade. New story atop existing 2 story structure 9" make from fulton property line. New deck with 42" parapet walls mic=dblock atop existing 2 story building Date: February 29, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 29, 2016 | Permit id: 638146 | |||||
SCORE 100 Wire two family dwelling as per 2008 nec. Install a 300amp service complete rewire including circuits, outlets, switches 1 lights 12 120v smokes 8 phone cables. Date: November 9, 2016 Contractor: Sean Kearns Client: Tran Anh T Halpin Thomas J Jr | Permit type: Electrical permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 723476 | |||||
SCORE 98 Interior demo of non load partitions only (sfd) Date: September 10, 2015 Contractor: Sinni Removal Services Llc Client: Tran Anh T Halpin Thomas J Jr | Permit type: Demolition permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 637804 | |||||
SCORE 70 All new fixtures & pvc piping & water piping pex thru out & install 3-rainleaders & 3-area drains the installation will comply with the philadelphia plumbing code 2004 Date: May 13, 2016 Contractor: William Bogsch Plumbing And Htg Client: Tran Anh T Halpin Thomas J Jr | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 12, 2017 | Permit id: 691826 | |||||
For the amendment of permit ap#648845 to document reconfiguration of interior partition wall layout per approved plans. Date: September 27, 2016 Client: Tran Anh T Halpin Thomas J Jr | Permit type: Administrative permit | Permit status: Completed | Completion date: November 8, 2017 | Permit id: 717220 | |||||
SCORE 100 1" water distribution installation and or replacement - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection." Date: November 22, 2016 Contractor: Bartholomew Emanuel Client: Tran Anh T Halpin Thomas J Jr | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 15, 2016 | Permit id: 738607 |