New construction permit Date: January 8, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 512361 | |||||
Plumbing permit Date: August 22, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 557641 | |||||
Mechanical permit Date: May 13, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 536347 | |||||
Suppression permit Date: August 18, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 545270 | |||||
Zoning/use permit Date: November 27, 2013Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 488150 | |||||
Administrative permit Date: August 21, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 557047 | |||||
Electrical permit Date: May 29, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 539502 | |||||
Permit for the erection of a new (3) story two family dwelling with second floor rear deck, and pilot house to access roof deck at third story. (size and location to be as shown in application) Date: September 17, 2013Client: Nineteenth Street Develop | Applicant: David G. Orphanides, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 25, 2013 | Permit id: 21320 | |||||
Suppression permit Date: August 18, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 545270 | |||||
Administrative permit Date: August 21, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 557047 | |||||
New construction permit Date: January 8, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 512361 | |||||
Zoning use permit Date: November 27, 2013Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 488150 | |||||
Plumbing permit Date: August 22, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 557641 | |||||
Mechanical permit Date: May 13, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 536347 | |||||
Electrical permit Date: May 29, 2014Client: Nineteenth Street Develop | Permit status: Completed | Permit id: 539502 | |||||
Permit for the erection of a new (3) story two family dwelling with second floor rear deck, and pilot house to access roof deck at third story. (size and location to be as shown in application) Date: September 17, 2013Client: Nineteenth Street Develop | Applicant: David G. Orphanides, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 25, 2013 | Permit id: 21320 | |||||
SCORE 100 For the ammendment of ap#5452 for the installation of a fire supression system for a two family dwelling serviced by two- one inch combined fire service lines with a water meter assembly. Fire supression system to be installed in accordance with nfpa 13d. All work to be done per approved plans. Separate permits required for plumbing work. Date: August 21, 2014 Contractor: Shannon Fire ProtectionClient: Nineteenth Street Develop | Permit type: Administrative permit | Permit status: Completed | Completion date: October 31, 2014 | Permit id: 557047 | |||||
SCORE 100 Wiring throughout and 200amp service per 2008 nec (two family) Date: May 29, 2014 Contractor: Sigma Electric Co IncClient: Nineteenth Street Develop | Permit type: Electrical permit | Permit status: Completed | Completion date: November 10, 2015 | Permit id: 539502 | |||||
SCORE 100 For the installation of a fire supression system for a single family dwelling serviced by a combined fire service line with a water meter assembly. Fire supression system to be installed in accordance with nfpa 13d. All work to be done per approved plans. Separate permits required for plumbing work. Date: August 18, 2014 Contractor: Shannon Fire ProtectionClient: Nineteenth Street Develop | Permit type: Suppression permit | Permit status: Completed | Completion date: October 31, 2014 | Permit id: 545270 | |||||
SCORE 100 Install 5" lateral, house drain, house trap, fai, 2-1" water service combo (2fd) pa20142320753 self-cerifications are no longer permitted - all excavations & plumbing trenches in excess of 5 in depth must have approved shoring in place at the time of inspection Date: August 22, 2014 Contractor: Ferko PlumbingClient: Nineteenth Street Develop | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 3, 2014 | Permit id: 557641 | |||||
For the erection of a new (3) story two family dwelling with second floor rear deck, and pilot house to access roof deck at third story. Date: November 27, 2013Client: Nineteenth Street Develop | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 27, 2013 | Permit id: 488150 | |||||
For the erection of a new three (3) story, two (2) family dwelling as per approved plans. Building to be fully sprinklered. Underpinning work to be monitored by a pa registered professional engineer at all times separate permits required for mep & fire suppression work Date: January 8, 2014Client: Nineteenth Street Develop | Permit type: New construction permit | Permit status: Completed | Completion date: October 29, 2014 | Permit id: 512361 | |||||
SCORE 86 Install new pvc waste & vents new pex water supply to 6 lav,6 wc,5 tub,1 stall shower,2 kitchen sinks,2 washer machine,2 water heater and 1 ejector pump (2 family) Date: March 7, 2014 Contractor: Easy Flow Plumbing LlcClient: Nineteenth Street Develop | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 6, 2014 | Permit id: 523030 | |||||
SCORE 100 Install 2 heatpumps 30,0 btu with ductwork(2 family) Date: May 13, 2014 Contractor: Fresh Air Services IncClient: Nineteenth Street Develop | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 31, 2014 | Permit id: 536347 |