ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 To install a new 113 monopole cell tower for t-mobile and install equipment cabinet and generator. Zoned cs-a. Using cs for setbacks: rear---based on 113 -30 1. 5+ = 75. North side zoned r10... 113-30 1. 5 = 55 south side zoned scc pud... Lowest engineered failure point. Poc: lou katzerman 901-239-3892. Its poc: amy neal 615-862-6665 amy. Neal@nashville. Gov need additional information:. 1... You need to contact the councilman for that district concerning a community meeting and tornado sirens 2. Need a stamped letter from an engineer describing the lowest engineered failure point of the tower. 3. Need a letter justifying why co-location is not feasible (see attached number of carriers required on a tower --17. 16. 080) 4. See attached zoning code... 17. 16. 0 c... You need to comply with the provisions of the code. Permit type: Building commercial - new | Permit id: 2017046309 | Parcel: 13500024700 |