Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit Date: May 20, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit status: Completed | Permit id: 693015 | |||||
Demolition permit Date: May 20, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit status: Completed | Permit id: 693015 | |||||
Zoning permit Date: November 23, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit status: Completed | Permit id: 725926 | |||||
Addition permit Date: November 23, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit status: Active | Permit id: 725930 | |||||
SCORE 100 Install two 60,0 btu 95% gas furnaces with two 2 ton coils,and two 2 ton condensers and related duct work Date: June 15, 2017 Contractor: Milmar Hvac Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Mechanical permit | Permit status: Active | Completion date: September 13, 2017 | Permit id: 792359 | |||||
Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 20, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Demolition permit | Permit status: Completed | Completion date: July 29, 2016 | Permit id: 693015 | |||||
For the partial rear demoltion of an existing two story attached structure with the erection of an addition in original footprint in the rear with a one story addition over the second story portion with a rear roof deck over the second story portion and a roof deck over the third story portion accessed by an exterior stair from the second floor rear roof deck. Structure for use as a single family household living. Size and location as shown per application plan. Date: November 23, 2016 Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Zoning permit | Permit status: Completed | Completion date: November 23, 2016 | Permit id: 725926 | |||||
SCORE 89 Kitchen sink,2 wc,2 lavs,2 bath showers and laundry box (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: July 28, 2017 Contractor: Anthony A Smith Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Plumbing permit | Permit status: Active | Completion date: August 8, 2017 | Permit id: 804091 | |||||
SCORE 82 Install new branch circuit, new smoke detector new grounding system new plug new lights 12, new switches 15 and new 1 amp service as per nec 2008 Date: July 26, 2017 Contractor: Reids Electrical Specialist Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Electrical permit | Permit status: Active | Completion date: July 26, 2017 | Permit id: 803025 | |||||
SCORE 86 For the partial rear demoltion of an existing two story attached structure with the erection of an addition in original footprint in the rear with a one story addition over the second story portion with a rear roof deck over the second story portion and a roof deck over the third story portion accessed by an exterior stair from the second floor rear roof deck. Structure for use as a single family household living. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: November 23, 2016 Contractor: Javier Garcia Hernandez Client: Specialized Ira Services Qnp 401k Td 100-856 | Client Company: Csc Ingeo | Permit type: Addition permit | Permit status: Expired | Completion date: November 6, 2017 | Permit id: 725930 |