Advance 1 direct push soil boring to a depth of 25 feet in support of the dc water ltcp poplar point pumping station replacement. Date: April 30, 2012Client: Ddot | Applicant: Ddot; Urs | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200285 | |||||
SCORE 59 Advance 1 direct push soil boring to a depth of 25 feet in support of the dc water ltcp poplar point pumping station replacement. Date: April 30, 2012 Contractor: Ddot UrsClient: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200285 | |||||
SCORE 59 Advance 1 direct push soil boring to a depth of 25 feet in support of the dc water ltcp poplar point pumping station replacement. Date: April 30, 2012 Contractor: Ddot; UrsClient: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200285 | |||||
SCORE 59 District of columbia clean rivers -dccr- project proposes to drill 16 compaction grout borings located along the division z poplar point pumping station anacostia main interceptor -ami- diversion sewer. All direct casing insertion drilling generated waste will be drummed -solids and liquids-, tested and shipped off-site for disposal. In the event the well is not completed within 1 day, the well shall be covered and protected from surface water drainage, vertical migration of contaminants and other materials through the well casing and well annulus. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See attached schematic and 2015 work-plan for additional information. Date: December 7, 2016Client: National Park Services C O Christopher Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700057 | |||||
SCORE 59 Dccr proposes to drill 31 compaction grout borings located along the ami diversion sewer. All drilling generated waste will be drummed -solids and liquids-, tested and shipped off-site for disposal. In the event the well is not completed within 1 day, the well shall be covered and protected from surface water drainage, vertical migration of contaminants and other materials through the well casing and well annulus. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. See attached schematics and 2015 work-plan for additional information. Date: November 30, 2016Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700049 | |||||
SCORE 56 Dccr proposes to drill eight geotechnical borings located along the ami diversion sewer using hollow stem auger drilling methods. All drilling generated waste will be drummed -solids and liquids-, tested and shipped off-site for disposal. In the event the well is not completed within 1 day , the well shall be covered and protected from surface water drainage, vertical migration of contaminants and other materials through the well casing and well annulus. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. Date: November 16, 2016 Contractor: National Park Services; Homaira Sharif AecomClient: National Park Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700035 | |||||
SCORE 56 After hours permit for ddot occupancy permit 10376016, construction permit 200454. Soil boring work in the public right of way on behalf of dc water Date: February 10, 2017 Contractor: Dc Water Dc Clean RiversClient: Dc Water Dc Clean Rivers | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700470 |