ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 New construction: exterior plumbing; 4" domestic water service; 4" backflow pa20171510012 - the installation will comply with the philadephia plubming code 2004 Date: June 12, 2017 Contractor: Albert J Sgro Mechanical IncPermit type: Plumbing permit | Permit status: Active | Completion date: November 1, 2017 | Permit id: 787849 | |||||
1 residential dwelling units,retail commercial;public parking for vehicles & accessory facilities; Date: April 6, 2010Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 118360 | |||||
For the erection of a 23 story structure. Date: January 30, 2007Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 30, 2007 | Permit id: 22424 | |||||
Applicant excercise it right under pa act 46 to extend permit number #118360. Date: January 15, 2014Permit type: Zoning admin review | Permit status: Completed | Completion date: January 28, 2014 | Permit id: 442643 | |||||
Abandoned; zba refused amended zoning permit request on 02 02 2016 for adminstrative mendment of zoning use permit #118360, dated 4 6 per zba dicision on1 7 08 calenar #4315 please see attached cover letter and plans detailing changes to previously approved zoning plans Date: September 7, 2017Permit type: Zoning admin review | Permit status: Completed | Completion date: September 7, 2017 | Permit id: 650658 | |||||
SCORE 100 Closure via removal of one 2,0 gallon underground storage tank ust likely to store gasoline Date: August 16, 2016 Contractor: React Environmental Prof ServiPermit type: Demolition permit | Permit status: Completed | Completion date: April 11, 2017 | Permit id: 715095 | |||||
Multi family mixed use buildign with 116 dwelling units an d accessory parking spaces. Project previously approved by permit 1183 (zba calendar #4315). This application makes minor changes, as explained inthe enclosed cover letter. Date: June 23, 2016Permit type: Zoning admin review | Permit status: Completed | Completion date: June 23, 2016 | Permit id: 697319 | |||||
SCORE 100 For removing two (2) underground storage tanks (usts), - one (1) 2,000-ga ust. - one (1) 550-ga ust, as per approval from philadelphia historical commission, Date: August 10, 2016 Contractor: React Environmental Prof ServiPermit type: Demolition permit | Permit status: Completed | Completion date: October 13, 2016 | Permit id: 713780 | |||||
SCORE 100 New 13 2 service with gen set and complete electric fit out for 116 apartments. Parking, lounge area and gym. Temp service for construction communications all new voice data and cable tv connections. As per 2008 nec (mixed use) new voice fire alarm system per nfpa72 Date: August 1, 2017 Contractor: Dougherty Electric IncPermit type: Electrical permit | Permit status: Active | Completion date: August 1, 2017 | Permit id: 770732 | |||||
SCORE 82 To amend permit ap#717696 for the erection, operation, and dis-assembly of tower crane supported on pier installation, located within property line accessory to construction of high rise structure. (see ap#717696 for foundation dtls.) Date: May 23, 2017 Contractor: Maxim Crane Works LpPermit type: Administrative permit | Permit status: Active | Completion date: August 1, 2017 | Permit id: 776449 | |||||
SCORE 100 Automatic sprinkler & automatic standpipe system install w. Two (2) eight (8) inch fire service connections & backflow prevention (bfp) assemblies to serve listed diesel engine driven fire pump assembly for previously approved high-rise mixed-use multi-family dwelling structure. Automatic sprinkler & standpipe system install per nfpa 13 14&20 Date: October 30, 2017 Contractor: Oneida Fire ProtectionPermit type: Suppression permit | Permit status: Active | Completion date: November 20, 2017 | Permit id: 760989 | |||||
SCORE 100 New construction: exterior plumbing. Install (1) 12" sanitary sewer lateral & (1) 12" storm sewer lateral to the street mains pa1#20170830147."all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection". The installation shall comply with the philadelphia plumbing code, 2004. Date: April 20, 2017 Contractor: Albert J Sgro Mechanical IncPermit type: Plumbing permit | Permit status: Active | Completion date: June 9, 2017 | Permit id: 770001 | |||||
SCORE 100 New construction: interior plumbing of a 10-story mixed-use structure with vacant commercial space on the 1st floor and (116 dwelling units on floors 2 thru 10. The installation will comply with the philadephia plubming code, 2004. Additional permits are required for the 4" domestic water distribution service to the street main, as well as the 4" backflow prevention containment assembly on the main domestic water supply. Additional permits are required for the fit-out of the vacant commercial space on the 1st floor, except for the work shown on these approved plans, is included in this permit. Date: September 19, 2017 Contractor: John J MulhollandPermit type: Plumbing permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 770374 | |||||
For the erection of a non-combustible, steel-framed attached structure to include type a & b accessible dwelling units, lower level enclosed parking garage, roof terraces, and vegetated green roof installations per plans approved by historical commission. (see ap#668658 for documentation of special inspectors and foundation plans.) separate permits to be required for electrical, plumbing, mechanical, fire suppression, and standpipe system installations. Separate permit to be required for occupancy of grd flr commercial space. Separate permit from pa dept of labor & industry reqd for elevator installations. Date: September 22, 2016Permit type: New construction permit | Permit status: Active | Completion date: November 21, 2017 | Permit id: 717696 | |||||
For the erection of a foundation system to include new auger secant pile installations, pile cap installation, steel framing installations. Secant wall pile installation, shotcrete application, wale shoring installation, secant wall bracing system, and steel framing installation. Separate permits to be required for construction of new structure above grade. Owner takes responsibility for any alterations, modifications, or removal of the foundation systems approved under this plan that may result from the review of the building permit application. Date: June 24, 2016Permit type: New construction permit | Permit status: Active | Completion date: November 21, 2017 | Permit id: 668658 |