ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 27 micro inverters total system size in kilowatts: 5. 41 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 28, 2011Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: April 13, 2011 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 27 micro inverters total system size in kilowatts 5. 41 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 28, 2011Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 13, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 15, 2015 Contractor: A S I Hastings IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: November 18, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 59 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 27 micro inverters total system size in kilowatts 5. 41 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 28, 2011 Contractor: Bri Electric IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: April 13, 2011 | Permit id: Pds2011-1031-20 | |||||
Final Date: November 12, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: April 11, 2011Permit status: Pass | Permit id: Pds2011-1031-20 | |||||
Final Date: January 19, 2010Permit status: Pass | Permit id: Pds2009-1005-20 | |||||
Shower(s)/hot mop/liner/lath Date: November 10, 2009Permit status: Pass | Permit id: Pds2009-1005-20 |