Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Back deck removal and rebuild demo: demo & dispose of existing decking, and framing. Debris will be removed and disposed of at company dumpster (131 fawcett st. Cambridge). Footings: dig & pour new deepsonotube footings to comply with ma building code. Pour new concrete landing for new stairs. Framing: - installed by contractor. Frame new deck out of 2x pressure treated lumber with 6 x 6 posts. Electrical: all electrical work will be completed by licensed electricians. Install 1 exterior gfci per ma state code. Decking: installed new 5 4 composite decking by contractor. Railing: install new composite railings by contractor. Finish work: preformed by contractor as instructed. Permit type: Addition/alteration | Completion date: May 23, 2016 | Current use: One-family | Permit id: 0 | Parcel: 181201 | |||||
SCORE 100 Remove existing velux ggl 8 skylight on lower back roof. Install new velux gpl uk08 using the original rough opening (replacement skylight size is identical to original). Install new flashing. Replace shingles in immediate work area, as needed. Permit type: Addition/alteration | Completion date: November 9, 2017 | Current use: Townhouse | Permit id: 0 | Parcel: 181201 |