ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Revision to permit b113646 to include alteration to garage, poolhouse and washroom. Demo existing covered outdoor patio area Date: July 24, 2012Client: Jospeh Stettinius Jr | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208419 | |||||
SCORE 56 15 ft x ft inground concrete swimming pool. 15,0 gallons. Date: March 30, 2012 Contractor: Joe Stettinius; Tanya HillClient: Joe Stettinius | Permit type: Swimming pool | Permit status: Permit issued | Permit id: Sp1200029 | |||||
SCORE 61 Electrical Date: April 11, 2012 Contractor: Tristate Communications Inc.; Michael F RaffaelClient: Jospeh Stettinius Jr | Permit status: Permit issued | Permit id: E1205005 | |||||
SCORE 93 Plumbing and gas Date: April 2, 2012 Contractor: Harold D Johnson IiiClient: Jospeh Stettinius Jr | Permit status: Permit issued | Permit id: P1204207 | |||||
Plumbing and gas Date: April 17, 2013Permit status: Permit issued | Permit id: P1304302 | |||||
SCORE 59 Electrical Date: April 11, 2012 Contractor: Tristate Communications Inc. Michael F RaffaelClient: Jospeh Stettinius Jr | Permit status: Permit issued | Permit id: E1205005 | |||||
SCORE 98 Electrical Date: May 13, 2013 Contractor: Constantin RodousakisPermit status: Completed | Permit id: E1305272 | |||||
SCORE 98 Electrical Date: August 28, 2013 Contractor: Constantin RodousakisPermit status: Permit issued | Permit id: E1308067 | |||||
SCORE 93 Mechanical Date: July 19, 2013 Contractor: John G KastanisPermit status: Completed | Permit id: M1302325 | |||||
Plumbing and gas Date: August 8, 2013Permit status: Completed | Permit id: P1307043 | |||||
SCORE 82 Construct foundation only for new single family detached dwelling on vacant lot. Date: April 24, 2015 Contractor: Stephanie Erwin Cas EngineeringClient: Felipe Paraud Fct Ventures, Llc | Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1500066 | |||||
SCORE 82 New single family home Date: July 23, 2015 Contractor: Cas EngineeringClient: Fct Ventures Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1505040 | |||||
Plumbing and gas Date: July 18, 2016Client: Phillips Park Llc | Permit status: Permit issued | Permit id: P1607909 | |||||
SCORE 56 Construct new 3-story detached single-family dwelling, retaining walls, patios and associated appurtenances. Date: March 15, 2013 Contractor: Robert Holman Karen Martino Cas EngineeringClient: Leslie Thornton | Permit type: New building | Permit status: Completed | Permit id: B1213861 | |||||
SCORE 98 Electrical Date: August 28, 2013 Contractor: Constantin RodousakisPermit status: Permit issued | Permit id: E1308067 | |||||
Revision to permit b113646 to include alteration to garage, poolhouse and washroom. Demo existing covered outdoor patio area Date: July 24, 2012Client: Jospeh Stettinius Jr | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208419 | |||||
SCORE 93 Mechanical Date: July 19, 2013 Contractor: John G KastanisPermit status: Completed | Permit id: M1302325 | |||||
SCORE 56 15 ft x ft inground concrete swimming pool. 15,0 gallons. Date: March 30, 2012 Contractor: Joe Stettinius Tanya HillClient: Joe Stettinius | Permit type: Swimming pool | Permit status: Permit issued | Permit id: Sp1200029 | |||||
Plumbing and gas Date: April 17, 2013Permit status: Permit issued | Permit id: P1304302 | |||||
SCORE 93 Plumbing and gas Date: April 2, 2012 Contractor: Harold D Johnson IiiClient: Jospeh Stettinius Jr | Permit status: Permit issued | Permit id: P1204207 | |||||
SCORE 96 Electrical Date: October 14, 2016 Contractor: Anthony P GivensClient: Forest Glen Investments Llc | Permit status: Permit issued | Permit id: E1700360 | |||||
Plumbing and gas Date: October 25, 2016Client: Forest Glen Investments Llc | Permit status: Permit issued | Permit id: P1700594 | |||||
Plumbing and gas Date: July 18, 2016Client: Phillips Park Llc | Permit status: Permit issued | Permit id: P1607909 | |||||
SCORE 56 Construct new three story single family detached dwelling, including basement, with retaining walls, terraces, steps, swimming pool, spa, driveway, utilities and associated appurtenances on a vacant lot. Date: June 13, 2016Client: Phillips Park Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1606547 | |||||
SCORE 100 Plumbing and gas Date: April 17, 2013 Contractor: Michael SydorkoPermit status: Permit issued | Permit id: P1304302 | |||||
SCORE 59 Construct new three story single family detached dwelling, including basement, with retaining walls, terraces, steps, swimming pool, spa, driveway, utilities and associated appurtenances on a vacant lot. Date: June 13, 2016Client: Phillips Park Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1606547 | |||||
SCORE 100 Plumbing and gas Date: July 18, 2016 Contractor: Michael SydorkoClient: Phillips Park Llc | Permit status: Permit issued | Permit id: P1607909 | |||||
SCORE 59 Construct new, residential swimming pool and spa, in-ground, with associated electrical, mechanical and plumbing systems. Date: November 4, 2016Client: Forest Glen Investments Llc | Permit type: Swimming pool | Permit status: Permit issued | Permit id: Sp1600045 | |||||
SCORE 93 Mechanical Date: November 10, 2016 Contractor: John G KastanisClient: Forest Glen Investments Llc | Permit status: Permit issued | Permit id: M1700377 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: eservices. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeilcd7pkrvsnvnkmuu7unrkc5 Date: November 12, 2016 Contractor: Michael Raffael; J Roger Shealy; Michael RaffaelClient: J Roger Shealy | Permit type: Electrical | Permit status: Permit issued | Permit id: E42665470 | |||||
SCORE 56 Construct new 3-story detached single-family dwelling, retaining walls, patios and associated appurtenances. Date: March 15, 2013 Contractor: Robert Holman; Karen Martino Cas EngineeringClient: Leslie Thornton | Permit type: New building | Permit status: Completed | Permit id: B1213861 | |||||
SCORE 80 Three geotechnical borings, b-15, b-16 and b-17, will be drilled depths ranging from to 45 feet or refusal with hollow stem augers. No monitoring well will be installed. Waste will be containerized in 55-gallon drums, tested and disposed of with cut soils and demolition debris during construction. Borehole will be tremie-grouted with 2 lbs bentonite: 1 gallon water slurry upon completion. The closest intersection is w street, nw and foxhall rd, nw. Date: December 22, 2014 Contractor: Marc TschibeluClient: Felipe Paraud | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500092 | |||||
SCORE 96 Type of elevator : one (1) geared chain/ steel,wood /residental Date: January 16, 2014 Contractor: Premier Lifts IncPermit type: Elevator - new | Permit status: Permit issued | Permit id: En1400782 |