Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb notifi Date: September 24, 2002 Permit type: Util | Permit id: E305922 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: March 16, 2005 Permit type: Delead | Permit id: E524686 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: November 1, 2005 Permit type: Util | Permit id: E612562 | |||||
Apt 1d) in the first room from east------ provide and install a complete new double hung thermo window including all capping and caulking. Date: March 15, 2007 Permit type: Gc | Permit id: E724294 | |||||
As per rc #20070012325 (enviro-probe, inc.), perform total lead analysis of 2 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: November 27, 2006 Permit type: Delead | Permit id: E714367 | |||||
As per rc #20070012325 (enviro-probe, inc.), perform total lead analysis of 5 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: November 21, 2006 Permit type: Delead | Permit id: E713943 | |||||
Apt 2l) trace and repair leaks coming from rear of apt of above apt (3l) and plaster and paint 2sq. Ft of bathroom ceiling in apt 2l and plaster an Date: October 3, 2006 Permit type: Gc | Permit id: E709455 | |||||
As per rc #2007001232501 (enviro-probe, inc.), perform total lead analysis of 2 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: January 19, 2007 Permit type: Delead | Permit id: E719243 | |||||
As per rc #2007001232501 (enviro-probe, inc.), perform total lead analysis of 5 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: December 22, 2006 Permit type: Delead | Permit id: E716386 | |||||
Makeall necessary repair to individual gas boiler. Include all necessary parts as needed, restore boiler and heat to properly working order to enti Date: February 27, 2015 Permit type: Heat | Permit id: Ef16085 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: November 9, 2006 Permit type: Delead | Permit id: E712725 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: July 19, 2005 Permit type: Delead | Permit id: E602269 | |||||
Apt 1c) at the rear yard install new metal buck and door, replace the defective door. Approx 34 x 80. Door should include all the necessary hard Date: December 29, 2006 Permit type: Gc | Permit id: E717130 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: November 13, 2006 Permit type: Delead | Permit id: E712732 | |||||
As per rc #20070012325 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: December 5, 2006 Permit type: Delead | Permit id: E715171 | |||||
(apt. #4l) make all necessary repairs to oil fired boiler, clean and vacuum chimney. Start and adjust boiler; and restore hot water to boiler. Remo Date: July 11, 2005 Permit type: Heat | Permit id: E534506 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: November 4, 2005 Permit type: Delead | Permit id: E613164 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: July 22, 2005 Permit type: Util | Permit id: E602258 | |||||
Provide and install metal 11 ft. Scuttle hatch ladder to the roof at the top floor. Remove all work related debris. Note: contractor must contac Date: June 14, 2005 Permit type: Gc | Permit id: E534205 | |||||
Public hall: remove unkeyed plaster ceiling at vestibule. Provide new g. W. B tape, compound, prime and paint ceiling. S. W. P public area. Date: September 15, 2006 Permit type: Gc | Permit id: E707630 | |||||
SCORE 96 Equipment work Date: November 8, 2002 Contractor: Richards Const Permit status: Permit issued | Permit id: 30142302901 | |||||
SCORE 96 Fence Date: November 8, 2002 Contractor: Richards Const Permit type: Equipment | Permit status: Permit issued | Permit id: 30142302901 | |||||
At cellar install new gwb at boiler room ceiling complete with tin ceiling approx sq. Ft. Remove debris. Note: contractor must contact cordell Date: November 21, 2005 Permit type: Gc | Permit id: E613834 | |||||
Public area: at the building front located at 3rd and 4th stories repair with similar material the broken and defective brown stone at the window sil Date: January 16, 2007 Permit type: Gc | Permit id: E718040 | |||||
At roof code replace with new the missing scuttle cover of the hathch door. Remove all work related debris. . Note : contractor must contact h Date: August 17, 2010 Permit type: Gc | Permit id: Eb07069 | |||||
Public area) resecure window and wood frame and caulk around window exterior. Remove all work related debris. Note: contractor must contact hp Date: January 9, 2007 Permit type: Gc | Permit id: E717664 | |||||
Con edison provide electric to building public areas and heating plant/hot water heater. Date: June 8, 2006 Permit type: Util | Permit id: E636346 | |||||
Apartment #2r install complete window guard, two (2) livingroom and one (1) in bedroom. Date: October 30, 2006 Value: $134 Permit type: Gc | Permit id: E712269 | |||||
Apt. 1c) at bathroom remove obstruction bath-tub. At kitchen replace leaky tail piece at the kitchen sink Date: October 10, 2006 Value: $295 Permit type: Plumb | Permit id: E710485 | |||||
Apt. #2l) install (2) window guards & stop at # 1&2 bedroom. Date: September 27, 2006 Value: $115 Permit type: Gc | Permit id: E709360 | |||||
Local law #1 violation : as per rc #. And attached scope of work thoroughly remove all lead violations as per new york city administrative code 2 Date: September 6, 2005 Value: $611 Permit type: Delead | Permit id: E607109 | |||||
Local law #1 violation : as per rc #. And attached scope of work thoroughly remove all lead violations as per new york city administrative code 2 Date: June 27, 2005 Value: $645 Permit type: Delead | Permit id: E535557 | |||||
Local law #1 violation : as per rc #. And attached scope of work thoroughly remove all lead violations as per new york city administrative code 2 Date: February 8, 2005 Value: $333 Permit type: Delead | Permit id: E521101 | |||||
SCORE 89 Date: November 8, 2002 Contractor: Steven Richard Client: Jay Weider | Client Address: 399 Chauncey St Bklyn Ny 10125 | Client Phone: (718) 564-9888 | Client Company: N | Permit status: Initial | Permit id: 301423029 | |||||
Con edison provide electric to building public areas and heating plant hot water heater. Date: July 1, 2006 Permit type: Util | Permit id: E702670 | |||||
Trace ,locate and repair water leak from bathroom above in bathroom in apt. 1a. Make gc restoration as needed after plumbing repairs. Remove al Date: September 26, 2013 Permit type: Gc | Permit id: Ee06948 | |||||
As per rc #2006001254204 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: September 15, 2006 Permit type: Delead | Permit id: E708034 | |||||
Apartment # 1a trace and repair all leaks at rear bedroom ceiling from above. Install new g. W. B. At bedroom ceiling. Prime and paint bedroom ceilin Date: August 15, 2006 Permit type: Gc | Permit id: E704190 | |||||
Apt 1a: sheetrock compound and plaster bedroom ceiling. Prime and paint entire bedroom ceiling. Note: contractor must contact hpd at 718/636-301 Date: August 21, 2006 Permit type: Gc | Permit id: E704686 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: June 26, 2006 Permit type: Util | Permit id: E637481 | |||||
Apt 1a: sheetrock compound and plaster bedroom ceiling. Prime and paint entire bedroom ceiling. Note: contractor must contact hpd at 718 636-301 Date: August 21, 2006 Permit type: Gc | Permit id: E704686 | |||||
As per rc #2006001254204 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: October 2, 2006 Permit type: Delead | Permit id: E709470 | |||||
Provide automatic fuel delivery to the above building until further notice. No prime and start necessary. Please call if there is a problem. 212-863-8 Date: May 8, 2007 Permit type: Util | Permit id: E729853 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: November 14, 2005 Permit type: Delead | Permit id: E613871 | |||||
As per rc #20070012325 (enviro-probe, inc.), perform total lead analysis of 5 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: November 21, 2006 Permit type: Delead | Permit id: E713942 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: August 9, 2006 Permit type: Delead | Permit id: E704203 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: October 20, 2005 Permit type: Delead | Permit id: E611763 | |||||
As per rc #2006001254204 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: September 8, 2006 Permit type: Delead | Permit id: E706943 | |||||
Restore # 2 oil boiler to proper working order to ensure hot water to apt #2r and entire building. Note: contractor must contact h. P. D. @(718) 636 Date: October 10, 2006 Permit type: Heat | Permit id: E710264 | |||||
Provide automatic fuel delivery to the above building until further notice. No prime and start necessary. Please call if there is a problem. 212-863-8 Date: October 16, 2006 Permit type: Util | Permit id: E710133 | |||||
R/c 20141419802 apt 2r: as per the requirement contract with hpd, provide and install 1 window guard and repair 1 throughout apartment. Remove a Date: August 11, 2016 Permit type: Gc | Permit id: Eh00729 | |||||
R c 20141419802 apt 2r: as per the requirement contract with hpd, provide and install 1 window guard and repair 1 throughout apartment. Remove a Date: August 11, 2016 Permit type: Gc | Permit id: Eh00729 | |||||
At apt. # 2r, bathroom------ trace, locate and repair the water leak from above the bathroom ceiling. Repair the defective plastered surfaces at ce Date: December 30, 2016 Permit type: Gc | Permit id: Eh08552 |