ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 80 Plumbing Date: June 21, 2000 Contractor: M And J Plg And Htg Mechanical CorpPermit status: Permit issued | Permit id: 20062529801 | |||||
Con ed provide gas to boiler/hot water heater. Date: May 8, 2015Permit type: Util | Permit id: Ef20442 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater. Date: May 7, 2015Permit type: Util | Permit id: Ef20416 | |||||
At basement : gas fired water heater is up and running generating hot water but at apartment temp is degree . Raise the temperature setting of h Date: December 18, 2014Permit type: Heat | Permit id: Ef12007 | |||||
SCORE 95 Date: June 21, 2000 Contractor: Morris AvruchClient: Dewan Rupram | Client Address: 2138 Quimby Ave Bronx Ny 10473 | Client Phone: (914) 837-5969 | Client Company: Niobeck Ma | Permit status: Initial | Permit id: 200625298 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater. Date: May 7, 2015Permit type: Util | Permit id: Ef20416 | |||||
Con ed provide gas to boiler hot water heater. Date: May 8, 2015Permit type: Util | Permit id: Ef20442 | |||||
Apt# 2fl; bathroom make all necessary repairs to the single lever shower body in the bathroom so as to stop constant leak and leave it in proper Date: February 6, 2015Permit type: Plumb | Permit id: Ef14669 | |||||
Boileroom : replace with new the defective gallon hot water tank. Existing tank is cracked. Restore hot water to proper working condition. All debris Date: September 19, 2014Permit type: Heat | Permit id: Ef07021 | |||||
Hot water related: remove the exisitng rotted subflooring and replace with new and provide / install new vct , approx. Sq. Ft. In order to receive Date: September 26, 2014Permit type: Gc | Permit id: Ef07464 | |||||
Gas fired boiler : make any necessary repairs to the gas fired boiler and restore to propper working order. Remove all work related debris. Date: October 20, 2014Permit type: Heat | Permit id: Ef08804 | |||||
1st floor. Demo and replace complete boiler room floor including sleepers, provide and install new concrete ,approximately sq ft. Resecure door to Date: October 23, 2014Permit type: Gc | Permit id: Ef08800 | |||||
Hot water related: remove the exisitng rotted subflooring and replace with new and provide install new vct , approx. Sq. Ft. In order to receive Date: September 26, 2014Permit type: Gc | Permit id: Ef07464 |