Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing photovoltaic system on rooftop ![]() ![]() Permit type: Electrical | Permit status: Permit issued | Expiration date: December 15, 2018 | Current use: Single family / duplex | Permit id: 6635692 |