ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] replacing exsiting utility meter with a meter main. Installing a 14 panel solar system on the roof. Connecting to the grid through one dedicated 30amp breaker in the new meter main. Connecting the house and adu breaker panels to the new meter main as well. Date: October 31, 2017 Contractor: West Seattle Electric And SolarPermit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: October 31, 2018 | Current use: Single family / duplex | Permit id: 6627456 |