ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Fire safety foster care inspection report Date: August 8, 2012Permit status: Closed | Permit id: 12-04571 | |||||
Wellington new mh Date: September 16, 2010Permit status: Closed | Permit id: 10-04988 | |||||
SCORE 100 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04988 | Parcel: 7339 | |||||
SCORE 96 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04988 | Parcel: 7339 | |||||
SCORE 100 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04988 | Parcel: 7339 | |||||
Fire safety foster care inspection report Client: Judy Hedrick | Permit type: Foster care | Permit status: Closed | Current use: Over the counter | Permit id: 12-04571 | Parcel: 7339 | |||||
September 1, 20 1:16: pm kneel. Wellington mhp - new mh location: hendersonville rd to airport rd to wellington mhp.; september 16, 20 12:32:03 pm jfortner. Premise # redacted phone number4; september 16, 20 5:26:46 pm kneel. Wellington mhp - new mh; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Buildi Permit type: Permits - historical | Permit status: Closed | Permit id: 10-04988 | Parcel: 7339 | |||||
August 2, 2012 8:32:06 am willt. Fire safety foster care inspection report. Judy hedrick 25 fee due. Call will thibodeau for inspection redacted phone number. Permit type: Foster care | Permit status: Closed | Permit id: 12-04571 | Parcel: 7339 | |||||
Wellington new mh Date: September 16, 2010 Value: $6,000Permit type: Historical | Permit status: Closed | Permit id: 10-04988 | |||||
September 1, 20 1:16: pm kneel. Wellington mhp - new mh location: hendersonville rd to airport rd to wellington mhp.; september 16, 20 12:32:03 pm jfortner. Premise # redacted phone number4; september 16, 20 5:26:46 pm kneel. Wellington mhp - new mh; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Buildi Date: September 16, 2010Permit type: Permits - historical | Permit status: Closed | Permit id: 10-04988 | Parcel: 7339 | |||||
August 2, 2012 8:32:06 am willt. Fire safety foster care inspection report. Judy hedrick 25 fee due. Call will thibodeau for inspection redacted phone number. Date: August 8, 2012Permit type: Foster care | Permit status: Closed | Permit id: 12-04571 | Parcel: 7339 |