ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Welding/sodering;for ;replacement of existing roof plenum drain lines; &; existing water lines servicing tenant cellar space. Bfd paid detail required Date: May 12, 2015Client: Faneuil Hall Ma | Permit type: Bfd cutting-burning-welding | Permit id: Cbw470185 | Parcel: 0303670000 | |||||
Welding/burning; on type 1 grease exhaust duct for relocation of existing duct work bfd paid detail required Date: April 16, 2015Client: Faneuil Hall Ma | Permit type: Bfd cutting-burning-welding | Permit id: Cbw461173 | Parcel: 0303670000 | |||||
Furnish &; install automatic fire suppression system for the exhaust hood and grease producing appliances (condition - if fire alarm system in building then fire suppression system shall be connected - apply for separate fire alarm permit from bfd) Date: August 5, 2014Client: Faneuil Hall Ma | Permit type: Bfd sprinkler system | Permit id: Sprk386735 | Parcel: 0303670000 | |||||
Installation shall comply with the requirements of nfpa 17a and nfpa 96 Date: December 1, 2014Client: Faneuil Hall Ma | Permit type: Bfd sprinkler system | Permit id: Sprk429233 | Parcel: 0303670000 | |||||
Burning/welding to replace water piping for cooling system dpl7/12/15 bfd paid detail required Date: April 15, 2015Client: Faneuil Hall Ma | Permit type: Bfd cutting-burning-welding | Permit id: Cbw462289 | Parcel: 0303670000 | |||||
Bfd chemist certificate proces Date: September 2, 2014Client: Faneuil Hall Ma | Permit id: Chm397336 | Parcel: 0303670000 | |||||
Burning &; welding for the installation of structural steel framing new chase floor support new access point extension new floor openings new monument stairs &; new store front (glass canopy) bfd paid detail required Date: April 3, 2015Client: Faneuil Hall Ma | Permit type: Bfd cutting-burning-welding | Permit id: Cbw459179 | Parcel: 0303670000 | |||||
SCORE 86 Upgrade existing fire alarm system to new facp with voice fire alarm in conjunction with a tenant fit out.; exterior beacon to remain in current lcoation with onyx on interior side from exterior beacon.; Date: September 1, 2015 Contractor: Afa Protective Systems Afa Protective SystemsClient: Faneuil Hall Ma | Permit type: Bfd fire alarm installations | Permit id: Bfdf473001 | Parcel: 0303670000 | |||||
Bfd chemist certificate proces Date: September 18, 2014Client: Faneuil Hall Ma | Permit id: Chm408145 | Parcel: 0303670000 | |||||
Renovations to include wood floor finish Date: July 24, 2012Client: Faneuil Hall Ma | Permit type: Bfd construction demo reno | Permit id: Fdc163500 | Parcel: 0303670000 | |||||
Bfd chemist certificate proces Date: March 11, 2015Client: Faneuil Hall Ma | Permit id: Chm449048 | Parcel: 0303670000 | |||||
Welding only for the installation of new stair to existing platform @ market place west end bfd paid detail required Date: October 16, 2013Client: Faneuil Hall Ma | Permit type: Bfd cutting-burning-welding | Permit id: Cbw293890 | Parcel: 0303670000 | |||||
Temporary bagging of smoke detectors for dust control during maintenance work Date: March 27, 2013Client: Faneuil Hall Ma | Permit type: Bfd bag smoke detectors | Permit id: Bsd228740 | Parcel: 0303670000 | |||||
Permit is for the;heating;eight (8) tents off the ends of quincy market building in faneuil hall with two (2) 0 btu heaters using two (2) 1 pound cylinders of propane. Date: January 14, 2014Client: Faneuil Hall Ma | Permit type: Bfd general permit | Permit id: Gp318813 | Parcel: 0303670000 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: July 24, 2012Client: Faneuil Hall Ma | Permit type: Bfd bag smoke detectors | Permit id: Bsd163503 | Parcel: 0303670000 | |||||
Removal of asbestos Date: March 12, 2013Client: Faneuil Hall Ma | Permit type: Bfd asbestos removal | Permit id: Asb226327 | Parcel: 0303670000 | |||||
Permit is for the erection of eight (8) tents off the ends of quincy market building in faneuil hall. Date: January 14, 2014Client: Faneuil Hall Ma | Permit type: Bfd tent with assembly | Permit id: Ta318804 | Parcel: 0303670000 | |||||
Welding sodering;for ;replacement of existing roof plenum drain lines; &; existing water lines servicing tenant cellar space. Bfd paid detail required Date: May 12, 2015Client: Ashkenazy Acquisition Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw470185 | Parcel: 0303670000 | |||||
Welding burning; on type 1 grease exhaust duct for relocation of existing duct work bfd paid detail required Date: April 16, 2015Client: Ashkenazy Acquisition Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw461173 | Parcel: 0303670000 | |||||
Burning welding to replace water piping for cooling system dpl7 12 15 bfd paid detail required Date: April 15, 2015Client: Ashkenazy Acquisition Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw462289 | Parcel: 0303670000 | |||||
SCORE 86 Phase 2 of the upgrade of the existing fire alarm system to new facp with voice fire alarm exterior beacon to remain in current lcoation with onyx on interior side from exterior beacon plus new beacon with additional annunciator on west entrance per fd request. All remaining system to be upgraded. Date: July 26, 2016 Contractor: Afa Protective Systems Afa Protective SystemsClient: Ashkenazy Acquisition Corp | Permit type: Bfd fire alarm installations | Permit id: Bfdf584740 | Parcel: 0303670000 | |||||
SCORE 79 Weld leaking duct seams through out the duct work (dpl) bfd paid detail required Date: June 29, 2017 Contractor: Francisco LugoClient: Authorized Agent | Permit type: Bfd cutting-burning-welding | Permit id: Cbw724363 | Parcel: 0303670000 |