Building Permits at 2 Congress St Boston MA 02110


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2 Congress St Boston MA 02110 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Installation inaccordance with nfpa 13 and 7 cmr..... Only one floor shall be impaired at any given time
Date:  July 23, 2014

Permit status: Na | Permit id: Sprk382016
2014/07/230952 Congress St Boston Ma 02110
Turn up sprinkler heads to code for demo work. Work to be done per nfpa stands 7 cmr. One floor zone at a time.
Date:  June 2, 2015

Permit status: Na | Permit id: Sprk467617
2015/06/020952 Congress St Boston Ma 02110
Street occupancy
Date:  May 1, 2014

Permit status: Expired | Permit id: Occu-357978
2014/05/010952 Congress St Boston Ma 02110
Street occupancy
Date:  July 30, 2012

Permit status: Expired | Permit id: Occu-167509
2012/07/300952 Congress St Boston Ma 02110
Cutting burning welding for installation of new air handling unit to accommodate demo replacement and upgrades to air handling unit to gain a more efficient system (dpl) bfd paid detail required
Date:  June 18, 2015

Permit status: Na | Permit id: Cbw484409
2015/06/180952 Congress St Boston Ma 02110
Stand boom truck at curb erect pedestrian staging on sidewalk all work 7am-11am police detaill area a 343-4239
Date:  June 3, 2015

Permit type: Cranes | Permit status: Expired | Permit id: Occu-479669
2015/06/030952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control from general construction work
Date:  November 12, 2014

Permit status: Na | Permit id: Bsd425084
2014/11/120952 Congress St Boston Ma 02110
Remove existing fm2 fire suppression system in 8th floor communications room that is being renovated to general office space. Not valid without permit to install new sprinklers.
Date:  October 8, 2013

Permit status: Na | Permit id: Sprk287682
2013/10/080952 Congress St Boston Ma 02110
Occupy manhole
Date:  June 23, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-376715
2014/06/230952 Congress St Boston Ma 02110
Stand lift at curb erect and maintain pedestrian protective staging on sidewalk 7am to 4pm
Date:  May 29, 2014

Permit type: Cranes | Permit status: Expired | Permit id: Occu-367809
2014/05/290952 Congress St Boston Ma 02110
Street occupancy
Date:  May 17, 2012

Permit status: Expired | Permit id: Occu-142760
2012/05/170952 Congress St Boston Ma 02110
Relocate 12 sprinklers
Date:  January 9, 2013

Permit status: Na | Permit id: Sprk212486
2013/01/090952 Congress St Boston Ma 02110
Street occupancy
Date:  May 14, 2012

Permit status: Expired | Permit id: Occu-141325
2012/05/140952 Congress St Boston Ma 02110
Relocate existing sprinklers floor 6
Date:  June 6, 2011

Permit status: Na | Permit id: Sprk76388
2011/06/060952 Congress St Boston Ma 02110
SCORE
82
New fire alarm devices for tenant space.
Date:  February 27, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf442395
2015/02/270822 Congress St Boston Ma 02110Erica Burgos J And M Brown Company
Temporary bagging of smoke detectors for dust control
Date:  September 4, 2014

Permit status: Na | Permit id: Bsd404216
2014/09/040952 Congress St Boston Ma 02110
Date:  January 30, 2014

Permit status: Na | Permit id: Asb323160
2014/01/300952 Congress St Boston Ma 02110
Installation shall comply with the requirements of 7 cmr and nfpa 13...... Impairment shall be limited to one zone at time
Date:  March 10, 2015

Permit status: Na | Permit id: Sprk452230
2015/03/100952 Congress St Boston Ma 02110
Installation shall be inaccordance with the requirements of 7 cmr and nfpa 13... Only one zone shall be impaired at any given time
Date:  March 10, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk450008
2015/03/100952 Congress St Boston Ma 02110
Cutting burning welding for repairs to leak in coil and txv units in hvac units bfd paid detail required
Date:  September 13, 2012

Permit status: Na | Permit id: Cbw182322
2012/09/130952 Congress St Boston Ma 02110
Install smoke detectors speaker strobes &; strobes; ~; doc# 20140307
Date:  March 28, 2014

Permit status: Na | Permit id: Bfdf342270
2014/03/280952 Congress St Boston Ma 02110
Only one zone shall be impaired at any given time...... Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  December 8, 2014

Permit status: Na | Permit id: Sprk422344 | Parcel: 0302952010
2014/12/080952 Congress St Boston Ma 02110
Stand truck at curb; renewal
Date:  May 18, 2015

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-379457
2015/05/180952 Congress St Boston Ma 02110
Installation of inte
Date:  January 8, 2015

Permit status: Na | Permit id: Chm439959 | Parcel: 0302952010
2015/01/080952 Congress St Boston Ma 02110
Renovation of existing office space; ~; doc#; 20150399
Date:  July 15, 2015

Permit status: Na | Permit id: Bfdf491174
2015/07/150952 Congress St Boston Ma 02110
To install new fire alarm devices in tenant space. Doc#20141410
Date:  November 13, 2014

Permit status: Na | Permit id: Bfdf414971
2014/11/130952 Congress St Boston Ma 02110
Street occupancy
Date:  April 30, 2012

Permit status: Expired | Permit id: Occu-136808
2012/04/300952 Congress St Boston Ma 02110
Occupy manhole vactoring and maintenance 7pm to 6am
Date:  February 6, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-324807
2014/02/060952 Congress St Boston Ma 02110
Renovation of existing office space; ~; doc# 20150379 ; initiation of new pull stations and smoke detectors to activate smoke control system
Date:  July 15, 2015

Permit status: Na | Permit id: Bfdf488176
2015/07/150952 Congress St Boston Ma 02110
Coordinate impairment with building management so that only one zone shall be impaired at any given time
Date:  June 8, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk474906
2015/06/080952 Congress St Boston Ma 02110
Re roof ;m. H; 4x4; rdwy
Date:  February 25, 2015

Permit status: Na | Permit id: Emer-429882 | Parcel: 0302952010
2015/02/250952 Congress St Boston Ma 02110
Relocate (45) existing sprinklers on 9th floor
Date:  April 27, 2011

Permit status: Na | Permit id: Sprk72718
2011/04/270952 Congress St Boston Ma 02110
Only one floor shall be impaired at any given time
Date:  January 6, 2015

Permit status: Na | Permit id: Sprk433644
2015/01/060952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction
Date:  September 4, 2012

Permit status: Na | Permit id: Bsd177597
2012/09/040952 Congress St Boston Ma 02110
Only one floor shall be impaired at any given time... Coordinate impairment with building management
Date:  January 27, 2014

Permit status: Na | Permit id: Sprk318287
2014/01/270952 Congress St Boston Ma 02110
Minor demo of existing architectural finishes painting minor millwork
Date:  January 30, 2015

Permit status: Na | Permit id: Fdc444189
2015/01/300952 Congress St Boston Ma 02110
Relocate 4 existing sprinkler heads in new office area on 6th floor. Work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  September 25, 2014

Permit status: Na | Permit id: Sprk407101
2014/09/250952 Congress St Boston Ma 02110
Cutting; burning welding openings in existing beams to allow new hvac ductwork to pass through (dpl 42215) 1; bfd paid detail required
Date:  October 29, 2014

Permit status: Na | Permit id: Cbw419922 | Parcel: 0302952010
2014/10/290952 Congress St Boston Ma 02110
Change evac from 2 floors to current code - 3-floors - temp 3 evac; ~; doc# 20140815
Date:  August 5, 2014

Permit status: Na | Permit id: Bfdf379668
2014/08/050952 Congress St Boston Ma 02110
SCORE
82
Note only one zone shall be impaired at any given time within the building.... All impairments shall be;coordinate with the buildings impairment coordinated which is required by 527 cmr 1. 00;section 16. 3
Date:  July 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk491975
2015/07/210822 Congress St Boston Ma 02110Boston Fire Sprinkler Co. Inc
Bagging of smoke detectors
Date:  May 1, 2013

Permit status: Na | Permit id: Bsd177503
2013/05/010952 Congress St Boston Ma 02110
Installation of drap
Date:  December 31, 2014

Permit status: Na | Permit id: Chm437342 | Parcel: 0302952010
2014/12/310952 Congress St Boston Ma 02110
Stand truck at curb / 8:00am to 4:00pm
Date:  September 17, 2015

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-517985 | Parcel: 0302952010
2015/09/170952 Congress St Boston Ma 02110
Installation of pane
Date:  November 5, 2014

Permit status: Na | Permit id: Chm424148 | Parcel: 0302952010
2014/11/050952 Congress St Boston Ma 02110
SCORE
82
Installing new fire alarm devices in tenant space.
Date:  July 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf490993
2015/07/280822 Congress St Boston Ma 02110Erica Burgos J And M Brown Company
Occupy manhole vactoring and maintenance / 7pm to 6am
Date:  May 13, 2013

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-243381
2013/05/130952 Congress St Boston Ma 02110
Dupe - do not issue bagging of smoke detectors ; ; ; ; ; ; ;
Date:  June 30, 2014

Permit status: Na | Permit id: Bsd379190
2014/06/300952 Congress St Boston Ma 02110
Demo of existing architectural finishes
Date:  May 4, 2015

Permit status: Na | Permit id: Fdc467877
2015/05/040952 Congress St Boston Ma 02110
Demolition for removal of supplemental cooling steel platform &; renovations to drywalls
Date:  September 16, 2013

Permit status: Na | Permit id: Fdc285021
2013/09/160952 Congress St Boston Ma 02110
SCORE
100
Renovate reception and conf. Room upgrades to floors 11 12-incl new carpet/paint. Minor mep work
Date:  June 16, 2015
Contractor: Paul Mcdonald

Permit type: Bfd other | Permit status: Na | Permit id: Fdc482374
2015/06/1601002 Congress St Boston Ma 02110Paul Mcdonald
Installation of pane
Date:  May 22, 2015

Permit status: Na | Permit id: Chm471845 | Parcel: 0302952010
2015/05/220952 Congress St Boston Ma 02110
Burning &; welding for the installation of glass support posts (dpl); bfd paid detail required
Date:  May 2, 2014

Permit status: Na | Permit id: Cbw353429
2014/05/020952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during renovation work
Date:  February 11, 2014

Permit status: Na | Permit id: Bsd325244
2014/02/110952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during misc. Construction work
Date:  June 18, 2015

Permit status: Na | Permit id: Bsd484502
2015/06/180952 Congress St Boston Ma 02110
;work to include demo of existing architectural finishes i. E.;gwb walls act ceilings flooring drywall patching
Date:  November 12, 2014

Permit status: Na | Permit id: Fdc425092
2014/11/120952 Congress St Boston Ma 02110
Demolition/ renovations to office space to include drywall ceiling flooring painting mep upgrades
Date:  April 11, 2011

Permit status: Na | Permit id: Fdc71479
2011/04/110952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction
Date:  September 18, 2013

Permit status: Na | Permit id: Bsd286329
2013/09/180952 Congress St Boston Ma 02110
Renovations to include drywall paint door &; frame
Date:  September 4, 2012

Permit status: Na | Permit id: Fdc177595
2012/09/040952 Congress St Boston Ma 02110
Bagging of smoke detectors ; ; ; ; ; ; ;
Date:  June 27, 2014

Permit status: Na | Permit id: Bsd377313
2014/06/270952 Congress St Boston Ma 02110
No construction required.
Date:  September 30, 2014

Permit type: Special event | Permit status: Expired | Permit id: Pub390660 | Parcel: 0302952010
2014/09/300952 Congress St Boston Ma 02110
Install conduit; 138 x 1 rdwy; depth 2; guar 2010; ; mandatory hot box to be used for paving; extension
Date:  April 14, 2015

Permit type: Service | Permit status: Expired | Permit id: Exca-425155 | Parcel: 0302952010
2015/04/140952 Congress St Boston Ma 02110
Renovations to existing elevator lobby to include paint carpet &; millwork
Date:  June 27, 2014

Permit status: Na | Permit id: Fdc377305
2014/06/270952 Congress St Boston Ma 02110
Installation of upho
Date:  November 7, 2013

Permit status: Na | Permit id: Chm303084 | Parcel: 0302952010
2013/11/070952 Congress St Boston Ma 02110
Street occupancy
Date:  July 24, 2012

Permit status: Expired | Permit id: Occu-165777
2012/07/240952 Congress St Boston Ma 02110
Stand truck at manhole; / boston police detail area a; 343-4240; 7 pm to 6 am; maintain pedestrian safety
Date:  July 12, 2012

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-162024
2012/07/120952 Congress St Boston Ma 02110
Renovation of existing pantry and modifications of open office to conference to include walls and finishes
Date:  January 16, 2014

Permit status: Na | Permit id: Fdc319235
2014/01/160952 Congress St Boston Ma 02110
New speaker; / strobes relocate existing devices new smoke detectors &; control module for security.; doc - 20110481 on 6th floor
Date:  May 20, 2011

Permit status: Na | Permit id: Bfdf74645
2011/05/200952 Congress St Boston Ma 02110
Install smoke detector &; speaker strobes; per nfpa 72 7 cmr 8th ed.- doc 20110424
Date:  May 10, 2011

Permit status: Na | Permit id: Bfdf72608
2011/05/100952 Congress St Boston Ma 02110
To bag smoke detectors due to ongoing construction
Date:  April 11, 2011

Permit status: Na | Permit id: Bsd71401
2011/04/110952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during construction / demolition work
Date:  November 19, 2013

Permit status: Na | Permit id: Bsd303514 | Parcel: 0302952010
2013/11/190952 Congress St Boston Ma 02110
Renovation / demolition work to include drywall partition and finish work
Date:  November 14, 2013

Permit status: Na | Permit id: Fdc303501 | Parcel: 0302952010
2013/11/140952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors
Date:  May 4, 2015

Permit status: Na | Permit id: Bsd467884
2015/05/040952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors for dust control during renovation work
Date:  January 16, 2014

Permit status: Na | Permit id: Bsd319243
2014/01/160952 Congress St Boston Ma 02110
Soldering only for; installation of air handeling unit valve dpl 7/3/15 bfd paid detail required
Date:  June 15, 2015

Permit status: Na | Permit id: Cbw483633
2015/06/150952 Congress St Boston Ma 02110
Renovations to occupied office space; ~; doc# 20141659 ; inititiation of smoke detectors at entrances to stairwells to;activate smoke contorl system.
Date:  January 21, 2015

Permit status: Na | Permit id: Bfdf432378 | Parcel: 0302952010
2015/01/210952 Congress St Boston Ma 02110
Cutting / burning / welding for installation of glass support postson new canopy for site improvement and upgrades (dpl) bfd paid detail required
Date:  June 12, 2014

Permit status: Na | Permit id: Cbw371094
2014/06/120952 Congress St Boston Ma 02110
Permit is for high street only
Date:  November 21, 2012

Permit type: Cranes | Permit status: Expired | Permit id: Occu-198312
2012/11/210952 Congress St Boston Ma 02110
Temporary bagging of smoke detectors
Date:  January 29, 2015

Permit status: Na | Permit id: Bsd444196
2015/01/290952 Congress St Boston Ma 02110
SCORE
80
Stand truck at manhole; 7 pm to 6 am
Date:  August 21, 2012
Contractor: Nstar Nstar

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-175748
2012/08/210802 Congress St Boston Ma 02110Nstar Nstar
Scaffolding
Date:  May 1, 2014

Permit status: Expired | Permit id: Occu-357976
2014/05/010952 Congress St Boston Ma 02110
Stand 2 trucks at curb date change only
Date:  May 2, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-357655
2014/05/020952 Congress St Boston Ma 02110
Renovations to existing office space to incoude paint carpet &; ceilings
Date:  February 11, 2014

Permit status: Na | Permit id: Fdc325243
2014/02/110952 Congress St Boston Ma 02110
Demo of carpet and office
Date:  September 4, 2014

Permit status: Na | Permit id: Fdc404212
2014/09/040952 Congress St Boston Ma 02110
Cutting / burning / welding for decommissioning and cutting up of raised steel deck and beams for demolition (dpl) bfd paid detail required
Date:  October 18, 2013

Permit status: Na | Permit id: Cbw296119
2013/10/180952 Congress St Boston Ma 02110
Stand truck at manhole to install / splice cable; boston police detail area a; 343-4239
Date:  January 14, 2013

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-133884
2013/01/140952 Congress St Boston Ma 02110
SCORE
88
To bag smoke detectors due to ongoing construction
Date:  April 11, 2011

Permit status: Na | Permit id: Bsd71400
2011/04/110882 Congress St Boston Ma 02110C O Christina Guarnotta Garland Buiding Co
Excavation permit
Date:  April 14, 2015

Client: Bp-Russia Wharf | Permit type: Service | Permit id: Exca-425155
2015/04/140952 Congress St Boston Ma 02110
SCORE
100
Erect 8x 16x 24" high stage on 3/14/14. Removal on 3/15/14.
Date:  March 3, 2014
Value:   $1,000
Contractor: Mark Traina

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf339750 | Parcel: 0302952010
2014/03/0310001002 Congress St Boston Ma 02110Mark Traina
SCORE
100
Erect (17) 10x and 10x tents on 9 30 16. Removal on 10 1 16.
Date:  September 26, 2016
Value:   $5,000
Contractor: Mark Traina

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf640397 | Parcel: 0302952010
2016/09/2650001002 Congress St Boston Ma 02110Mark Traina
SCORE
100
Erect 20x115 tent on 10 24 16. Removal on 11 16 16.
Date:  October 18, 2016
Value:   $2,500
Contractor: Mark Traina

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf647958 | Parcel: 0302952010
2016/10/1825001002 Congress St Boston Ma 02110Mark Traina
SCORE
100
Install of security system 8th floor devices
Date:  June 19, 2012
Value:   $4,395
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv147720
2012/06/1943951002 Congress St Boston Ma 02110Mark Brophy
SCORE
100
Erect 8x8x24" high platform on 12/15/15. Removal on 12/17/15
Date:  December 9, 2015
Value:   $1,000
Contractor: Mark Traina

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf543946 | Parcel: 0302952010
2015/12/0910001002 Congress St Boston Ma 02110Mark Traina
SCORE
100
Add 5 data outlets at communispace 2 congress st 6th floor in conjunction with structuretone renovation being performed
Date:  December 4, 2013
Value:   $1,500
Contractor: John Mclaughlin

Client: Atlantic Wharf Primary Condo | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv310369 | Parcel: 0302952010
2013/12/0415001002 Congress St Boston Ma 02110John Mclaughlin
SCORE
98
Elge plumbing proposes to install (1) grease trap.
Date:  June 13, 2014
Value:   $5,000
Contractor: David Iannuzzi

Client: Atlantic Wharf Primary Condo | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl372854 | Parcel: 0302952010
2014/06/135000982 Congress St Boston Ma 02110David Iannuzzi
SCORE
100
Install of security system 8th floor 13 devices
Date:  June 19, 2012
Value:   $3,434
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv147728
2012/06/1934341002 Congress St Boston Ma 02110Mark Brophy
SCORE
100
Install of security system 2nd floor 12 devices
Date:  June 19, 2012
Value:   $4,882
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv147724
2012/06/1948821002 Congress St Boston Ma 02110Mark Brophy
SCORE
100
Install new kitchen sink and water heater
Date:  March 13, 2014
Value:   $3,500
Contractor: P J Oshaughnessy

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl343396
2014/03/1335001002 Congress St Boston Ma 02110P J Oshaughnessy
SCORE
100
Install of security system 2nd floor 15 devices
Date:  June 19, 2012
Value:   $4,871
Contractor: Mark Brophy

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv147734
2012/06/1948711002 Congress St Boston Ma 02110Mark Brophy
SCORE
95
Install (1) x temporary tent on tuesday june 2014 and remove by wednesday june 11 2014
Date:  June 10, 2014
Value:   $1,995
Contractor: James Quigley

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf371602 | Parcel: 0302952010
2014/06/101995952 Congress St Boston Ma 02110James Quigley
SCORE
100
Erect 8x8x24" high platform on 12/15/14. Removal on 12/17/14.
Date:  December 10, 2014
Value:   $1,000
Contractor: Mark Traina

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf433392 | Parcel: 0302952010
2014/12/1010001002 Congress St Boston Ma 02110Mark Traina
SCORE
100
Erect temporary pre-fabricated stage 16x32x36"high with appropriate railings and 2ea staircases: event is fife & drum concert; client is boston tea party ships & museum; location is park between 2 congress condos and fort point channel. Erect fri 28 nov 2014 and remove 1 dec 2014. Show is saturday 29 nov 2014
Date:  November 13, 2014
Value:   $2,300
Contractor: Edward Jacobs

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Sf425041 | Parcel: 0302952010
2014/11/1323001002 Congress St Boston Ma 02110Edward Jacobs
SCORE
89
One day intall and remove scaffolding for private property event at 2 congress st. Hubweek.
Date:  October 7, 2015
Value:   $3,000
Contractor: Ahmed Nur

Client: Atlantic Wharf Primary Condo | Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf527292 | Parcel: 0302952010
2015/10/073000892 Congress St Boston Ma 02110Ahmed Nur
SCORE
100
Atlantic wharf wellington 15th flr. Low voltage hvac control wiring- pag/jas 152927 filed under 2 congress st didnt have 2 congress on file
Date:  December 7, 2015
Value:   $25,000
Contractor: Paul Guarracino

Client: Atlantic Wharf Primary Condo | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv544350 | Parcel: 0302952010
2015/12/07250001002 Congress St Boston Ma 02110Paul Guarracino
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.