Building Permits at 1919 Biltmore Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1919 Biltmore Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
74
Refurbish the walkway and stairs in front of the house, exactly as currently. Brick on leadwalk and steps to sidewalk as per permit b121196
Date:  September 13, 2012
Contractor: Dobromir Vassilev

Permit type: Paving; leadwalk w/steps | Permit status: Cancel/withdrawn
2012/09/130741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
96
Repermitting pa56186 batch permit: 8a00933, 1919 biltmore st nw; 8a00934, woodley pl nw; 8a00932, 1824 biltmore st nw; 8a00926, 1838 calvert st nw. Specifically, place oh fiber optic cable in sq: 2546 in nw bounded by calvert st, cliffbourne st and biltmore st as shown on job 8a00933. Total fiber cable for this portion 262. Place fiber optic cable in sq 2204, 2203 in n w bounded by 24th st, connecticut av, woodley rd and calvert st as shown on job 8a00934. Total fiber cable for this portion 480. Place oh fiber optic cable in sq: 2549 in nw bounded by biltmore st, columbia rd, mintwood pl and 19th st as shown on job 8a00932. Total fiber cable for this portion 617. Place oh fiber optic cable in sq 2548 in nw bounded by calvert st, adams mill rd, columbia rd and biltmore st as shown on job 8a00926. Total fiber cable for this portion 272. Use fios drawdown account.
Date:  February 12, 2013
Contractor: Verizon Fios

Permit type: Over head work; string telecom wire/fiber | Permit status: Permit expired | Expiration date: February 24, 2014 | Permit id: Pa79411
2013/02/120961919 Biltmore Street Nw Washington DcVerizon Fios
SCORE
84
Batch permit: 8a00933, 1919 biltmore st nw; 8a00934, woodley pl nw; 8a00932, 1824 biltmore st nw; 8a00926, 1838 calvert st nw. Specifically, place oh fiber optic cable in sq: 2546 in nw bounded by calvert st, cliffbourne st and biltmore st as shown on job 8a00933. Total fiber cable for this portion 262. Place fiber optic cable in sq 2204, 2203 in n w bounded by 24th st, connecticut av, woodley rd and calvert st as shown on job 8a00934. Total fiber cable for this portion 480. Place oh fiber optic cable in sq: 2549 in nw bounded by biltmore st, columbia rd, mintwood pl and 19th st as shown on job 8a00932. Total fiber cable for this portion 617. Place oh fiber optic cable in sq 2548 in nw bounded by calvert st, adams mill rd, columbia rd and biltmore st as shown on job 8a00926. Total fiber cable for this portion 272. Use fios drawdown account.
Date:  June 24, 2010

Permit type: Over head work; string telecom wire/fiber | Permit status: Permit expired | Expiration date: August 4, 2011 | Permit id: Pa56186
2010/06/240841919 Biltmore Street Nw Washington DcVerizon Washington Dc Inc
SCORE
74
Other work related occupancy
Date:  September 11, 2012
Contractor: Dobromir Vassilev

Permit status: Expired | Expiration date: October 8, 2012 | Permit id: Pa10072807
2012/09/110741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
84
Over head work; string telecom wire fiber
Date:  July 12, 2010

Permit status: 8 | Expiration date: August 4, 2011 | Permit id: Pa56186
2010/07/120841919 Biltmore Street Nw Washington DcVerizon Washington Dc Inc
SCORE
96
Moving truck

Permit status: Notpaid | Expiration date: August 2, 2013 | Permit id: 0
0961919 Biltmore Street Nw Washington DcRed House Staging And Interiors
SCORE
61
Contractor: C. Becker

Permit status: 3 | Expiration date: February 17, 2007 | Permit id: 0
0611919 Biltmore Street Nw Washington DcC. Becker
SCORE
74
Paving; leadwalk w steps
Contractor: Dobromir Vassilev

Permit status: 3 | Permit id: 0
0741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
61
To place a moving truck in the curb lane of the road way no parking meter to unload van in curb lane
Date:  February 15, 2007
Contractor: C. Becker

Permit status: Cancel/withdrawn | Expiration date: February 17, 2007 | Permit id: 0
2007/02/150611919 Biltmore Street Nw Washington DcC. Becker
SCORE
74
Refurbish the walkway and stairs in front of the house, exactly as currently. Brick on leadwalk and steps to sidewalk as per permit b121196
Contractor: Dobromir Vassilev

Permit status: Cancel/withdrawn | Permit id: 0
0741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
96
Moving truck

Permit status: Not paid | Expiration date: August 2, 2013 | Permit id: 0
0961919 Biltmore Street Nw Washington DcRed House Staging And Interiors
SCORE
59
Repair cracked concrete on leadwalk with steps. Repave top concrete layer with brick per dc standard and code.
Date:  July 31, 2012
Contractor: Shreena Patel

Permit type: Paving; leadwalk w/steps | Permit status: Permit expired | Expiration date: September 14, 2012 | Permit id: Pa74109
2012/07/310591919 Biltmore Street Nw Washington DcShreena Patel
SCORE
74
Paving; leadwalk w steps
Contractor: Dobromir Vassilev

Permit status: 3 | Permit id: 0
0741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
96
Repermitting pa56186 batch permit: 8a00933, 1919 biltmore st nw; 8a00934, woodley pl nw; 8a00932, 1824 biltmore st nw; 8a00926, 1838 calvert st nw. Specifically, place oh fiber optic cable in sq: 2546 in nw bounded by calvert st, cliffbourne st and biltmore st as shown on job 8a00933. Total fiber cable for this portion 262. Place fiber optic cable in sq 2204, 2203 in n w bounded by 24th st, connecticut av, woodley rd and calvert st as shown on job 8a00934. Total fiber cable for this portion 480. Place oh fiber optic cable in sq: 2549 in nw bounded by biltmore st, columbia rd, mintwood pl and 19th st as shown on job 8a00932. Total fiber cable for this portion 617. Place oh fiber optic cable in sq 2548 in nw bounded by calvert st, adams mill rd, columbia rd and biltmore st as shown on job 8a00926. Total fiber cable for this portion 272. Use fios drawdown account.
Date:  February 15, 2013
Contractor: Verizon Fios

Permit status: Permit expired | Expiration date: February 24, 2014 | Permit id: Pa79411
2013/02/150961919 Biltmore Street Nw Washington DcVerizon Fios
SCORE
61
Contractor: C. Becker

Permit status: 3 | Expiration date: February 17, 2007 | Permit id: 0
0611919 Biltmore Street Nw Washington DcC. Becker
SCORE
96
Moving truck

Permit status: Notpaid | Expiration date: August 2, 2013 | Permit id: 0
0961919 Biltmore Street Nw Washington DcRed House Staging And Interiors
SCORE
74
Refurbish the walkway and stairs in front of the house, exactly as currently. Brick on leadwalk and steps to sidewalk as per permit b121196
Date:  September 11, 2012
Contractor: Dobromir Vassilev

Permit type: Paving; leadwalk w/steps | Permit status: Permit expired | Expiration date: October 10, 2012 | Permit id: Pa75175
2012/09/110741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
74
Refurbish the walkway and stairs in front of the house, exactly as currently. Brick on leadwalk and steps to sidewalk as per permit b121196
Contractor: Dobromir Vassilev

Permit status: Cancel/withdrawn | Permit id: 0
0741919 Biltmore Street Nw Washington DcDobromir Vassilev
SCORE
59
Repair cracked concrete on leadwalk with steps. Repave top concrete layer with brick per dc standard and code.
Date:  July 31, 2012
Contractor: Shreena Patel

Permit type: Paving; leadwalk w/steps | Permit status: Permit expired | Expiration date: September 14, 2012 | Permit id: Pa74109
2012/07/310591919 Biltmore Street Nw Washington DcShreena Patel
SCORE
56
Moving truck
Date:  July 22, 2013
Contractor: David Najmi

Permit status: Permit expired | Expiration date: July 31, 2013 | Permit id: Pa10106747
2013/07/220561919 Biltmore Street Nw Washington DcDavid Najmi
SCORE
96
Moving truck

Permit status: Not paid | Expiration date: August 2, 2013 | Permit id: 0
0961919 Biltmore Street Nw Washington DcRed House Staging And Interiors
SCORE
72
Moving truck
Date:  June 11, 2014
Contractor: Christine Martin

Permit status: Permit expired | Expiration date: June 15, 2014 | Permit id: Pa10145169
2014/06/110721919 Biltmore Street Nw Washington DcChristine Martin
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.