ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical upgrade from 1 to 2 amps service for existing sfd. Date: May 15, 2012Permit type: Electrical : 80 - ac | Permit status: Permit expired | Permit id: Pds2012-1007-20 | |||||
Misc plumbing to replace valve assembly and shower pan Date: February 29, 2012Permit type: Plumbing : 80 - acc | Permit status: Permit expired | Permit id: Pds2012-1011-20 | |||||
SCORE 89 Electrical upgrade from 1 to 2 amps service for existing sfd. Date: May 15, 2012 Contractor: V I P Plumbing Heating And Air Conditioning IncPermit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2012-1007-20 | |||||
SCORE 100 Misc plumbing to replace valve assembly and shower pan Date: February 29, 2012 Contractor: Us Remodelers, IncPermit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2012-1011-20 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 21, 2016 Contractor: Solarcity CorporationPermit type: Residential alteration-addn | Permit status: Completed | Completion date: December 2, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 16, 2017 Contractor: N B Baker Electric IncPermit type: Addn | Permit status: Completed | Completion date: December 4, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: November 29, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Rough electric Date: May 15, 2012Permit status: Pass | Permit id: Pds2012-1007-20 |