ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 9. 6 solar and 125 amp panel swap 5/14 /14 rlm permit includes new feeder to existing house panel. Date: April 3, 2014 Contractor: Artisan Electric IncPermit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2014 | Expiration date: April 3, 2015 | Current use: Multifamily | Permit id: 6411614 |