Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington new mh ![]() Permit status: Closed | Permit id: 10-04991 | |||||
SCORE 100 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
SCORE 95 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
SCORE 75 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
September 1, 20 1:16: pm kneel. Wellington mhp - new mh location: hendersonville rd to airport rd to wellington mhp.; september 16, 20 6:09:07 pm kneel. Mh soil bearing report scanned into documents.; october 13, 20 10:09:33 am jfortner. Premise # redacted phone number6; september 21, 20 10:05:38 am kneel. Wellington mhp - new mh; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed Permit type: Permits - historical | Permit status: Closed | Permit id: 10-04991 | Parcel: 6002 | |||||
Wellington new mh ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 10-04991 | |||||
Lot 19a ![]() Permit status: Closed | Permit id: 10-05460 | |||||
SCORE 100 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
SCORE 100 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
SCORE 96 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
September 27, 20 11:55:25 am scarver. Wellington mobile home park-lot 19a, moving 20 14x76 mobile home;scc; october 5, 20 10:51:56 am scarver. Rec. Updated application to replace set up contractor, attacehd in documents;scc; october 8, 20 9:43:45 am heatherr. Premise #redacted phone number2 called in by karen @ oakwood homes; har; october 14, 20 10:53: am kneel. Wellington mobile home park-lot 19a, moving 20 14x76 mobile home; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are r Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05460 | Parcel: 4268 | |||||
Lot 19a ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 10-05460 | |||||
SCORE 100 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
SCORE 100 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
SCORE 96 Lot 19a Client: Lot 19a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05460 | Parcel: 4268 | |||||
September 27, 20 11:55:25 am scarver. Wellington mobile home park-lot 19a, moving 20 14x76 mobile home;scc; october 5, 20 10:51:56 am scarver. Rec. Updated application to replace set up contractor, attacehd in documents;scc; october 8, 20 9:43:45 am heatherr. Premise #redacted phone number2 called in by karen @ oakwood homes; har; october 14, 20 10:53: am kneel. Wellington mobile home park-lot 19a, moving 20 14x76 mobile home; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are r ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05460 | Parcel: 4268 | |||||
Lot 19a ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 10-05460 | |||||
SCORE 75 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
SCORE 100 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
SCORE 95 Wellington new mh Client: Wellington New Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-04991 | Parcel: 6002 | |||||
September 1, 20 1:16: pm kneel. Wellington mhp - new mh location: hendersonville rd to airport rd to wellington mhp.; september 16, 20 6:09:07 pm kneel. Mh soil bearing report scanned into documents.; october 13, 20 10:09:33 am jfortner. Premise # redacted phone number6; september 21, 20 10:05:38 am kneel. Wellington mhp - new mh; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 10-04991 | Parcel: 6002 | |||||
Wellington new mh ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 10-04991 |