Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install 4 new ductless heat pumps with 1 indoor head each. Date: May 21, 2015 Contractor: Hartman Heating And Air Inc Permit type: Mechanical | Permit status: Accepted | Completion date: May 21, 2015 | Current use: Commercial | Permit id: Bld2015-03598 | |||||
SCORE 59 # s6 construct wood framed offices on mezzanine; e & n permits reqd Date: May 19, 2015 Contractor: C.W. Smith Construction Inc Permit type: Permit | Permit status: Pass | Completion date: May 19, 2015 | Current use: Commercial | Permit id: Bld2015-03490 | |||||
SCORE 77 Commercial electrical remodel Date: March 9, 2015 Contractor: Robert Duncan Electrical Contracting Inc Permit type: Electrical | Permit status: Closed | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2015-01511 | |||||
SCORE 64 Install storage racking Date: June 19, 2009 Contractor: Hartwood Constructionmagann Permit type: Permit | Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-03598 | |||||
SCORE 64 Plumbing for a tenant finish. Fixture grand total 3, grand total of fixture units 9, water heaters 1, distro piping1 waterlines 1 and floor drains 2. Date: September 23, 2008 Contractor: Big City Plumbing And Drain Llcwardle Permit type: Plumbing | Permit status: Closed | Completion date: July 19, 2012 | Current use: Commercial | Permit id: Bld2008-02084 | |||||
SCORE 61 Office remodel, mechanical, electrical and plumbing permits required. Date: April 16, 2015 Contractor: Zack Olsen Permit status: Closed | Current use: Commercial | Permit id: Bld2015-01415 | |||||
SCORE 61 # s6 construct wood framed offices on mezzanine; e & n permits reqd Date: September 17, 2015 Contractor: Shingle Pro Roofingjason Harenberg Permit status: Closed | Current use: Commercial | Permit id: Bld2015-03490 | |||||
SCORE 66 Print shop first floor, unit s1 issued 1-29-09 Date: January 15, 2009 Contractor: Strategem Groupimaginos Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-00264 | |||||
SCORE 61 Ti Date: August 26, 2015 Contractor: Selerity Technologiesjosh Lee Permit status: Closed | Current use: Commercial | Permit id: Bld2015-02578 | |||||
SCORE 56 Elec work to add work station outlets & lighting Date: June 10, 2009 Contractor: T S Electric Inc.Selerity Tech Inc Permit type: Electrical | Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-03391 | |||||
SCORE 56 Electrical work for tenant improvement Date: April 30, 2010 Contractor: Stapleton Electric Llcla Tech Cnc Commonwealth Permit type: Electrical | Permit status: Closed | Completion date: June 30, 2010 | Current use: Commercial | Permit id: Bld2010-02771 | |||||
SCORE 56 New restroom, mezzanine, electrical, stairs electrical and plumbing permits required. K. A. Zone: a. H. North building #8 Date: October 23, 2009 Contractor: Rls Construction Inczolling Machine Permit status: Closed | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06528 | |||||
SCORE 66 Install lav, water closet, & 1 floor drains for new restroom, mezzanine, north building #8 Date: October 26, 2009 Contractor: Ralph Broderick Plumbingzolling Machine Permit type: Plumbing | Permit status: Closed | Completion date: April 6, 2010 | Current use: Commercial | Permit id: Bld2009-06556 | |||||
SCORE 66 Minimum electrical to add recepticles and light. Date: December 7, 2009 Contractor: Zap Electric Llcallied Electrica Sign And Awning Permit type: Electrical | Permit status: Closed | Completion date: April 30, 2010 | Current use: Commercial | Permit id: Bld2009-07515 | |||||
SCORE 56 Install 2 fixtures, 1 water heater, 1 floor drain Date: December 17, 2009 Permit type: Plumbing | Permit status: Closed | Completion date: December 17, 2009 | Current use: Commercial | Permit id: Bld2009-07759 | |||||
SCORE 66 Minimum electrical for remodel, north building #8 Date: November 9, 2009 Contractor: P B Construction Inczolling Machine Permit type: Electrical | Permit status: Closed | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06903 | |||||
SCORE 66 Construct (1) single use ada restroom in existing warehouse, plumbing and electrical permits also required. T. B. Zone: a. H. Date: December 15, 2009 Permit status: Closed | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2009-07703 | |||||
SCORE 66 Tenant improvement #s-8 Date: January 22, 2010 Permit status: Closed | Completion date: July 1, 2010 | Current use: Commercial | Permit id: Bld2010-00319 | |||||
SCORE 66 Construct new restroom in existing storage unit, elec & plmbg permits reqd cg zone, interior work ka as Date: February 25, 2011 Contractor: Mickelsen Constructionskolnick Unit Permit status: Closed | Completion date: May 24, 2011 | Current use: Commercial | Permit id: Bld2011-01171 | |||||
SCORE 56 Install 3 plumbing fixturtes, 2 floor drains, 1 water heater for new restroom in existing storage unit Date: February 28, 2011 Contractor: Yeagle And Sons Construction Inc.Skolnick Unit Permit type: Plumbing | Permit status: Closed | Completion date: May 18, 2011 | Current use: Commercial | Permit id: Bld2011-01205 | |||||
SCORE 66 Elec work for tenant improvement. Date: March 10, 2011 Contractor: Able Electric Co Incskolnick Unit Permit type: Electrical | Permit status: Closed | Completion date: April 19, 2011 | Current use: Commercial | Permit id: Bld2011-01420 | |||||
SCORE 66 Tenant improvement, mech, elec & plmbg permits reqd, office/warehouse k. A. Cg zone a. M. D. W. Date: March 12, 2012 Permit status: Closed | Completion date: August 15, 2013 | Current use: Commercial | Permit id: Bld2012-01882 | |||||
SCORE 56 Int remodel of office & add mezzanine office space d. D. A. H. T. I. Date: June 12, 2012 Permit status: Closed | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2012-04299 | |||||
SCORE 56 Installing plumbing for bathroom and sink. Date: October 29, 2012 Contractor: Don Boothe Plumbing Inc.Good Time Building Permit type: Plumbing | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08017 | |||||
SCORE 66 Elec work for office and bathroom remodel. Date: October 29, 2012 Contractor: Good Time Building Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08014 | |||||
SCORE 66 Install furnace, ducting, and water heater. Date: October 29, 2012 Contractor: Exclusive Air Systems Incgood Time Build Permit type: Mechanical | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08016 | |||||
SCORE 56 Tenant remodel as per scope of bld2012-04299. Date: November 19, 2012 Contractor: Alder Electric Llcchariot Offices And Showroom Permit type: Electrical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2012-08552 | |||||
SCORE 66 Tenant improvement (this permit is not a change of use permit) l. L. New mezzanine level for storage a. H. Date: January 14, 2013 Contractor: Winn Construction Llcthomas Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00241 | |||||
SCORE 66 1 - sink, 1 - wash basin, 1 - water closet, 1 - waterheater. Date: January 22, 2013 Contractor: Clinton Thomas Plumbingthomas Permit type: Plumbing | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00394 | |||||
SCORE 56 Replace furnace Date: February 6, 2013 Contractor: Budget Heating And Air Inc.Thomas Permit type: Mechanical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00645 | |||||
SCORE 66 Elec work for tenant improvement Date: February 6, 2013 Contractor: Canyon Construction Incthomas Permit type: Electrical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Residential | Permit id: Bld2013-00652 | |||||
SCORE 80 Office remodel, mechanical, electrical and plumbing permits required. Date: March 4, 2015 Contractor: Havenwood Homes Llc Permit status: Closed | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2015-01415 | |||||
SCORE 66 Re-route hvac ductwork Date: March 23, 2015 Contractor: Thermal Engineering Llcack Holdings Permit type: Mechanical | Permit status: Closed | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01887 | |||||
SCORE 66 Addition of one water closet and one lavatory. Addition of water spigot for water cooler. All on second floor. Date: March 24, 2015 Contractor: Thermal Engineeringthermal Engineering New Shop Permit type: Plumbing | Permit status: Closed | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01911 | |||||
SCORE 69 Ti Date: April 16, 2015 Contractor: Epik Globalselerity Technologies Permit status: Closed | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-02578 | |||||
SCORE 59 # s6 construct wood framed offices on mezzanine; e & n permits reqd Date: May 19, 2015 Contractor: C.W. Smith Construction Inc.Shingle Pro Roofing Permit status: Closed | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03490 | |||||
SCORE 69 Install 4 new ductless heat pumps with 1 indoor head each. Date: May 21, 2015 Contractor: Hartman Heating And Air Inch150261 Harenberg Permit type: Mechanical | Permit status: Closed | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03598 | |||||
SCORE 69 Electrical remodel Date: May 29, 2015 Contractor: Granite Electric Incshingle Pro Roofing Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-03799 | |||||
SCORE 59 8 plumbing fixtures, 1 water heater for tenant improvement Date: July 10, 2015 Permit type: Plumbing | Permit status: Closed | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-05200 | |||||
SCORE 69 Install lighting and receptacles per plan. Date: July 21, 2015 Contractor: Big Rock Electricselerity Ti Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-05632 | |||||
SCORE 64 Install furnace and a/c Date: August 27, 2015 Contractor: H And M Heating Coolingselarity Permit type: Mechanical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-06902 | |||||
SCORE 64 Install furnace and a/c Date: August 27, 2015 Contractor: H And M Heating Coolingselarity Permit type: Mechanical | Permit status: Pass | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-06902 | |||||
SCORE 69 Install lighting and receptacles per plan. Date: July 21, 2015 Contractor: Big Rock Electricselerity Ti Permit type: Electrical | Permit status: Pass | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-05632 | |||||
8 plumbing fixtures, 1 water heater for tenant improvement Date: July 10, 2015 Permit type: Plumbing | Permit status: Pass | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-05200 | |||||
SCORE 69 Ti Date: April 16, 2015 Contractor: Epik Globalselerity Technologies Permit type: Permit | Permit status: Pass | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-02578 | |||||
Elec work to add work station outlets & lighting Date: June 10, 2009 Permit type: Electrical | Permit status: Pass | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-03391 | |||||
SCORE 69 Electrical remodel Date: May 29, 2015 Contractor: Granite Electric Incshingle Pro Roofing Permit type: Electrical | Permit status: Pass | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-03799 | |||||
SCORE 69 Install 4 new ductless heat pumps with 1 indoor head each. Date: May 21, 2015 Contractor: Hartman Heating And Air Inch150261 Harenberg Permit type: Mechanical | Permit status: Pass | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03598 | |||||
# s6 construct wood framed offices on mezzanine; e & n permits reqd Date: May 19, 2015 Permit type: Permit | Permit status: Pass | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03490 | |||||
SCORE 66 Addition of one water closet and one lavatory. Addition of water spigot for water cooler. All on second floor. Date: March 24, 2015 Contractor: Thermal Engineeringthermal Engineering New Shop Permit type: Plumbing | Permit status: Pass | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01911 | |||||
SCORE 66 Re-route hvac ductwork Date: March 23, 2015 Contractor: Thermal Engineering Llcack Holdings Permit type: Mechanical | Permit status: Pass | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01887 | |||||
SCORE 80 Office remodel, mechanical, electrical and plumbing permits required. Date: March 4, 2015 Contractor: Havenwood Homes Llc Permit type: Permit | Permit status: Pass | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2015-01415 | |||||
SCORE 66 Elec work for tenant improvement Date: February 6, 2013 Contractor: Canyon Construction Incthomas Permit type: Electrical | Permit status: No certificate req | Completion date: August 30, 2013 | Current use: Residential | Permit id: Bld2013-00652 | |||||
Replace furnace Date: February 6, 2013 Permit type: Mechanical | Permit status: Completed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00645 | |||||
SCORE 66 1 - sink, 1 - wash basin, 1 - water closet, 1 - waterheater. Date: January 22, 2013 Contractor: Clinton Thomas Plumbingthomas Permit type: Plumbing | Permit status: Completed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00394 | |||||
SCORE 66 Tenant improvement (this permit is not a change of use permit) l. L. New mezzanine level for storage a. H. Date: January 14, 2013 Contractor: Winn Construction Llcthomas Permit type: Permit | Permit status: Completed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00241 | |||||
Tenant remodel as per scope of bld2012-04299. Date: November 19, 2012 Permit type: Electrical | Permit status: No certificate req | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2012-08552 | |||||
Int remodel of office & add mezzanine office space d. D. A. H. T. I. Date: June 12, 2012 Permit type: Permit | Permit status: Pass | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2012-04299 | |||||
SCORE 66 Elec work for office and bathroom remodel. Date: October 29, 2012 Contractor: Good Time Building Permit type: Electrical | Permit status: Completed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08014 | |||||
SCORE 66 Install furnace, ducting, and water heater. Date: October 29, 2012 Contractor: Exclusive Air Systems Incgood Time Build Permit type: Mechanical | Permit status: Completed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08016 | |||||
Installing plumbing for bathroom and sink. Date: October 29, 2012 Permit type: Plumbing | Permit status: Completed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08017 | |||||
SCORE 66 Tenant improvement, mech, elec & plmbg permits reqd, office/warehouse k. A. Cg zone a. M. D. W. Date: March 12, 2012 Permit type: Permit | Permit status: Pass | Completion date: August 15, 2013 | Current use: Commercial | Permit id: Bld2012-01882 | |||||
SCORE 66 Elec work for tenant improvement. Date: March 10, 2011 Contractor: Able Electric Co Incskolnick Unit Permit type: Electrical | Permit status: Pass | Completion date: April 19, 2011 | Current use: Commercial | Permit id: Bld2011-01420 | |||||
Install 3 plumbing fixturtes, 2 floor drains, 1 water heater for new restroom in existing storage unit Date: February 28, 2011 Permit type: Plumbing | Permit status: Pass | Completion date: May 18, 2011 | Current use: Commercial | Permit id: Bld2011-01205 | |||||
SCORE 66 Construct new restroom in existing storage unit, elec & plmbg permits reqd cg zone, interior work ka as Date: February 25, 2011 Contractor: Mickelsen Constructionskolnick Unit Permit type: Permit | Permit status: Pass | Completion date: May 24, 2011 | Current use: Commercial | Permit id: Bld2011-01171 | |||||
Electrical work for tenant improvement Date: April 30, 2010 Permit type: Electrical | Permit status: Pass | Completion date: June 30, 2010 | Current use: Commercial | Permit id: Bld2010-02771 | |||||
SCORE 66 Tenant improvement #s-8 Date: January 22, 2010 Permit type: Permit | Permit status: Pass | Completion date: July 1, 2010 | Current use: Commercial | Permit id: Bld2010-00319 | |||||
Install 2 fixtures, 1 water heater, 1 floor drain Date: December 17, 2009 Permit type: Plumbing | Permit status: On-line ready | Completion date: December 17, 2009 | Current use: Commercial | Permit id: Bld2009-07759 | |||||
SCORE 66 Construct (1) single use ada restroom in existing warehouse, plumbing and electrical permits also required. T. B. Zone: a. H. Date: December 15, 2009 Permit type: Permit | Permit status: Pass | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2009-07703 | |||||
SCORE 66 Minimum electrical to add recepticles and light. Date: December 7, 2009 Contractor: Zap Electric Llcallied Electrica Sign And Awning Permit type: Electrical | Permit status: Pass | Completion date: April 30, 2010 | Current use: Commercial | Permit id: Bld2009-07515 | |||||
SCORE 66 Minimum electrical for remodel, north building #8 Date: November 9, 2009 Contractor: P B Construction Inczolling Machine Permit type: Electrical | Permit status: Pass | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06903 | |||||
SCORE 66 Install lav, water closet, & 1 floor drains for new restroom, mezzanine, north building #8 Date: October 26, 2009 Contractor: Ralph Broderick Plumbingzolling Machine Permit type: Plumbing | Permit status: Pass | Completion date: April 6, 2010 | Current use: Commercial | Permit id: Bld2009-06556 | |||||
New restroom, mezzanine, electrical, stairs electrical and plumbing permits required. K. A. Zone: a. H. North building #8 Date: October 23, 2009 Permit type: Permit | Permit status: Pass | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06528 | |||||
SCORE 66 Print shop first floor, unit s1 issued 1-29-09 Date: January 15, 2009 Contractor: Strategem Groupimaginos Permit type: Permit | Permit status: Pass | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-00264 | |||||
SCORE 64 Plumbing for a tenant finish. Fixture grand total 3, grand total of fixture units 9, water heaters 1, distro piping1 waterlines 1 and floor drains 2. Date: September 23, 2008 Contractor: Big City Plumbing And Drain Llcwardle Permit type: Plumbing | Permit status: Closed | Completion date: July 19, 2012 | Current use: Commercial | Permit id: Bld2008-02084 | |||||
SCORE 66 Print shop first floor, unit s1 issued 1-29-09 Date: January 15, 2009 Contractor: Strategem Groupimaginos Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-00264 | |||||
SCORE 59 Elec work to add work station outlets & lighting Date: June 10, 2009 Contractor: T S Electric, Inc.Selerity Tech Inc Permit type: Electrical | Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-03391 | |||||
SCORE 64 Install storage racking Date: June 19, 2009 Contractor: Hartwood Constructionmagann Permit status: Closed | Completion date: February 28, 2011 | Current use: Commercial | Permit id: Bld2009-03598 | |||||
SCORE 59 New restroom, mezzanine, electrical, stairs electrical and plumbing permits required. K. A. Zone: a. H. North building #8 Date: October 23, 2009 Contractor: Rls Construction, Inczolling Machine Permit status: Closed | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06528 | |||||
SCORE 66 Install lav, water closet, & 1 floor drains for new restroom, mezzanine, north building #8 Date: October 26, 2009 Contractor: Ralph Broderick Plumbingzolling Machine Permit type: Plumbing | Permit status: Closed | Completion date: April 6, 2010 | Current use: Commercial | Permit id: Bld2009-06556 | |||||
SCORE 66 Minimum electrical for remodel, north building #8 Date: November 9, 2009 Contractor: P B Construction Inczolling Machine Permit type: Electrical | Permit status: Closed | Completion date: November 2, 2011 | Current use: Commercial | Permit id: Bld2009-06903 | |||||
SCORE 66 Minimum electrical to add recepticles and light. Date: December 7, 2009 Contractor: Zap Electric Llcallied Electrica Sign And Awning Permit type: Electrical | Permit status: Closed | Completion date: April 30, 2010 | Current use: Commercial | Permit id: Bld2009-07515 | |||||
SCORE 66 Construct (1) single use ada restroom in existing warehouse, plumbing and electrical permits also required. T. B. Zone: a. H. Date: December 15, 2009 Permit status: Closed | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2009-07703 | |||||
SCORE 59 Install 2 fixtures, 1 water heater, 1 floor drain Date: December 17, 2009 Permit type: Plumbing | Permit status: Closed | Completion date: December 17, 2009 | Current use: Commercial | Permit id: Bld2009-07759 | |||||
SCORE 66 Tenant improvement #s-8 Date: January 22, 2010 Permit status: Closed | Completion date: July 1, 2010 | Current use: Commercial | Permit id: Bld2010-00319 | |||||
SCORE 59 Electrical work for tenant improvement Date: April 30, 2010 Contractor: Stapleton Electric, Llcla Tech Cnc Commonwealth Permit type: Electrical | Permit status: Closed | Completion date: June 30, 2010 | Current use: Commercial | Permit id: Bld2010-02771 | |||||
SCORE 66 Construct new restroom in existing storage unit, elec & plmbg permits reqd cg zone, interior work ka as Date: February 25, 2011 Contractor: Mickelsen Constructionskolnick Unit Permit status: Closed | Completion date: May 24, 2011 | Current use: Commercial | Permit id: Bld2011-01171 | |||||
SCORE 59 Install 3 plumbing fixturtes, 2 floor drains, 1 water heater for new restroom in existing storage unit Date: February 28, 2011 Contractor: Yeagle And Sons Construction, Inc.Skolnick Unit Permit type: Plumbing | Permit status: Closed | Completion date: May 18, 2011 | Current use: Commercial | Permit id: Bld2011-01205 | |||||
SCORE 66 Elec work for tenant improvement. Date: March 10, 2011 Contractor: Able Electric Co Incskolnick Unit Permit type: Electrical | Permit status: Closed | Completion date: April 19, 2011 | Current use: Commercial | Permit id: Bld2011-01420 | |||||
SCORE 66 Tenant improvement, mech, elec & plmbg permits reqd, office warehouse k. A. Cg zone a. M. D. W. Date: March 12, 2012 Permit status: Closed | Completion date: August 15, 2013 | Current use: Commercial | Permit id: Bld2012-01882 | |||||
SCORE 59 Int remodel of office & add mezzanine office space d. D. A. H. T. I. Date: June 12, 2012 Permit status: Closed | Completion date: July 12, 2013 | Current use: Commercial | Permit id: Bld2012-04299 | |||||
SCORE 59 Installing plumbing for bathroom and sink. Date: October 29, 2012 Contractor: Don Boothe Plumbing, Inc.Good Time Building Permit type: Plumbing | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08017 | |||||
SCORE 66 Elec work for office and bathroom remodel. Date: October 29, 2012 Contractor: Good Time Building Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08014 | |||||
SCORE 66 Install furnace, ducting, and water heater. Date: October 29, 2012 Contractor: Exclusive Air Systems Incgood Time Build Permit type: Mechanical | Permit status: Closed | Completion date: August 28, 2013 | Current use: Commercial | Permit id: Bld2012-08016 | |||||
SCORE 59 Tenant remodel as per scope of bld2012-04299. Date: November 19, 2012 Contractor: Alder Electric, Llcchariot Offices And Showroom Permit type: Electrical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2012-08552 | |||||
SCORE 66 Tenant improvement (this permit is not a change of use permit) l. L. New mezzanine level for storage a. H. Date: January 14, 2013 Contractor: Winn Construction Llcthomas Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00241 | |||||
SCORE 66 1 - sink, 1 - wash basin, 1 - water closet, 1 - waterheater. Date: January 22, 2013 Contractor: Clinton Thomas Plumbingthomas Permit type: Plumbing | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00394 | |||||
SCORE 59 Replace furnace Date: February 6, 2013 Contractor: Budget Heating And Air, Inc.Thomas Permit type: Mechanical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Commercial | Permit id: Bld2013-00645 | |||||
SCORE 66 Elec work for tenant improvement Date: February 6, 2013 Contractor: Canyon Construction Incthomas Permit type: Electrical | Permit status: Closed | Completion date: August 30, 2013 | Current use: Residential | Permit id: Bld2013-00652 | |||||
SCORE 80 Office remodel, mechanical, electrical and plumbing permits required. Date: March 4, 2015 Contractor: Havenwood Homes Llc Permit status: Closed | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2015-01415 | |||||
SCORE 77 Commercial electrical remodel Date: March 9, 2015 Contractor: Robert Duncan Electrical Contracting Inc Permit type: Electrical | Permit status: Closed | Completion date: April 16, 2015 | Current use: Commercial | Permit id: Bld2015-01511 | |||||
SCORE 66 Re-route hvac ductwork Date: March 23, 2015 Contractor: Thermal Engineering Llcack Holdings Permit type: Mechanical | Permit status: Closed | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01887 | |||||
SCORE 66 Addition of one water closet and one lavatory. Addition of water spigot for water cooler. All on second floor. Date: March 24, 2015 Contractor: Thermal Engineeringthermal Engineering New Shop Permit type: Plumbing | Permit status: Closed | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2015-01911 | |||||
SCORE 69 Ti Date: April 16, 2015 Contractor: Epik Globalselerity Technologies Permit status: Closed | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-02578 | |||||
SCORE 59 # s6 construct wood framed offices on mezzanine; e & n permits reqd Date: May 19, 2015 Contractor: C.W. Smith Construction, Inc.Shingle Pro Roofing Permit status: Closed | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03490 | |||||
SCORE 69 Install 4 new ductless heat pumps with 1 indoor head each. Date: May 21, 2015 Contractor: Hartman Heating And Air Inch150261 Harenberg Permit type: Mechanical | Permit status: Closed | Completion date: September 17, 2015 | Current use: Commercial | Permit id: Bld2015-03598 | |||||
SCORE 69 Electrical remodel Date: May 29, 2015 Contractor: Granite Electric Incshingle Pro Roofing Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-03799 | |||||
SCORE 59 8 plumbing fixtures, 1 water heater for tenant improvement Date: July 10, 2015 Permit type: Plumbing | Permit status: Closed | Completion date: August 26, 2015 | Current use: Commercial | Permit id: Bld2015-05200 | |||||
SCORE 69 Install lighting and receptacles per plan. Date: July 21, 2015 Contractor: Big Rock Electricselerity Ti Permit type: Electrical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-05632 | |||||
SCORE 64 Install furnace and a c Date: August 27, 2015 Contractor: H And M Heating Coolingselarity Permit type: Mechanical | Permit status: Closed | Completion date: August 28, 2015 | Current use: Commercial | Permit id: Bld2015-06902 |