ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Reed creek greenway Date: October 23, 2006Permit type: Other | Permit status: Closed | Permit id: 06-02872 | |||||
Pedestrian bridge across reed creek Date: October 3, 2005Permit type: Other | Permit status: Closed | Permit id: 05-04040 | |||||
Pedestrian bridge across reed creek Value: $43,500Client: Pedestrian Bridge | Permit type: Com: other new | Permit status: Closed | Current use: Commercial | Permit id: 05-04040 | Parcel: 10669 | |||||
Pedestrain bridge Client: Sr Bp#05-4040 | Permit type: Planning level i | Permit status: Under review | Current use: Development | Permit id: 05-11000116pz | |||||
Reed creek greenway Client: Bp #06-2872 | Permit type: Scv level i | Permit status: Approved | Current use: Site compliance verification | Permit id: 06-10000067pz | |||||
Park and rec project - new pedestrian bridge across reed creek at catawba & broadway:; p&z#05-110116; property located in rs-8 residential single-family high density district. Lot is considered a corner lot. Corner lot means a lot abutting on and at the intersection of two or more streets. Property fronts on broadway street. Front setback shall be a minimum setback requiring at least fifteen feet (15?). The second street side of the corner lot (right), catawba st, shall have a setback requirement of percent of the front setback requirement. Therefore, catawba st will be required to have a minimum street side setback requiring at least seven and half feet (7 1/2 ). Swr august 31, 2005 4:45:27 pm stuartr ; september 7, 2005 9:29:25 am ccox ammendment submitted to ammend building plans.; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property b Permit type: Com: other new | Permit status: Closed | Permit id: 05-04040 | Parcel: 10669 | |||||
Pedestrian bridge across reed creek Date: October 3, 2005 Value: $43,500Client: Pedestrian Bridge | Permit type: Com: other new | Permit status: Closed | Current use: Commercial | Permit id: 05-04040 | Parcel: 10669 | |||||
Pedestrain bridge Date: August 23, 2005Client: Sr Bp#05-4040 | Permit type: Planning level i | Permit status: Under review | Current use: Development | Permit id: 05-11000116pz | |||||
SCORE 100 June 18, 2006 2:33:37 pm scarver reed creek greenway project;scc no building review per ron evans and barry vess;sc; address at the end of greenway is 33 cauble street.; applications and plans received.; fire marshal? S office plan review comments read attached fire prevention comment sheet the approved plans with the attached plan review comments are required to be on the job site at all times. Call for all fire inspections at 828-redacted phone number between the hours of 8: and 9: for a same day inspection. All calls received past 9: am will be scheduled for the next business day. Fire prevention plan review questions may also be directed to this phone number.: the contractor and any affected subcontractor(s) are expected to read and comply with the fire code, all the plan review comments, and are subject to any needed correction orders per ncgs 160a-417 thru 425. Your permit must be posted at the job site at all times or a 100. Stop order fine will be assessed. There may be other Date: October 23, 2006 Contractor: City Of AshevilleClient: Reed Creek Greenway | Permit type: Com: other new | Permit status: Closed | Current use: Commercial | Permit id: 06-02872 | Parcel: 10669 | |||||
Park and rec project - new pedestrian bridge across reed creek at catawba & broadway:; p&z#05-110116; property located in rs-8 residential single-family high density district. Lot is considered a corner lot. Corner lot means a lot abutting on and at the intersection of two or more streets. Property fronts on broadway street. Front setback shall be a minimum setback requiring at least fifteen feet (15?). The second street side of the corner lot (right), catawba st, shall have a setback requirement of percent of the front setback requirement. Therefore, catawba st will be required to have a minimum street side setback requiring at least seven and half feet (7 1 2 ). Swr august 31, 2005 4:45:27 pm stuartr ; september 7, 2005 9:29:25 am ccox ammendment submitted to ammend building plans.; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property b Date: October 3, 2005Permit type: Com: other new | Permit status: Closed | Permit id: 05-04040 | Parcel: 10669 |