ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Altamont mh lot 19 Date: July 5, 2011Permit status: Closed | Permit id: 11-03335 | |||||
Altamont mh lot 19 Value: $7,000Client: Altamont Mh Lot 19 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-03335 | Parcel: 20001 | |||||
SCORE 90 Altamont mh lot 19 Client: Altamont Mh Lot 19 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-03335 | Parcel: 20001 | |||||
June 14, 2011 10:31: am kneel. Altamont mhp, used mh lot 19 location: patton to n louisiana to r.; july 5, 2011 9:48: am rhurley. Owner decided to become contractor for moving himself; rlh; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 11-03335 | Parcel: 20001 | |||||
Altamont mh lot 19 Date: July 5, 2011 Value: $7,000Client: Altamont Mh Lot 19 | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 11-03335 | Parcel: 20001 | |||||
June 14, 2011 10:31: am kneel. Altamont mhp, used mh lot 19 location: patton to n louisiana to r.; july 5, 2011 9:48: am rhurley. Owner decided to become contractor for moving himself; rlh; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach Date: July 5, 2011Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 11-03335 | Parcel: 20001 |