ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
We will perform eight soil borings and eight infiltration auger probes on the proposed site. The soil borings and auger probes will be advanced to depths of 15 feet and feet, respectively. The borings/auger probes will be located within the bounds of the property. The borings/auger probes will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings/auger probes will be performed utilizing an atv and/or truck-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings/auger probes will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Borehole/auger probe abandonment will be performed by tremie-grouting via a positive-displacement pump from the bottom of the borehole/auger probe. Date: July 18, 2014Applicant: Ecs Capitol Services, Pllc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400363 | |||||
SCORE 96 Electrical Date: April 14, 2016 Contractor: Eduardo L. LopezClient: United States Of America | Permit status: Permit issued | Permit id: E1605460 | |||||
SCORE 89 We will perform eight soil borings and eight infiltration auger probes on the proposed site. The soil borings and auger probes will be advanced to depths of 15 feet and feet, respectively. The borings/auger probes will be located within the bounds of the property. The borings/auger probes will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings/auger probes will be performed utilizing an atv and/or truck-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings/auger probes will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Borehole/auger probe abandonment will be performed by tremie-grouting via a positive-displacement pump from the bottom of the borehole/auger probe. Date: July 18, 2014 Contractor: Ecs Capitol Services PllcPermit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400363 | |||||
SCORE 89 We will perform eight soil borings and eight infiltration auger probes on the proposed site. The soil borings and auger probes will be advanced to depths of 15 feet and feet, respectively. The borings auger probes will be located within the bounds of the property. The borings auger probes will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings auger probes will be performed utilizing an atv and or truck-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings auger probes will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Borehole auger probe abandonment will be performed by tremie-grouting via a positive-displacement pump from the bottom of the borehole auger probe. Date: July 18, 2014 Contractor: Ecs Capitol Services, PllcClient: District Of Columbia C O Macris, Hendricks & Glascock, Pa | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400363 | |||||
SCORE 100 Phase 2 excavation and landscaping to existing kalorama park phase 1 done under ex1500019. Including concrete work. Date: December 23, 2015 Contractor: DixonClient: Dept Of General Services | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1500053 | |||||
SCORE 100 Phase i grading and storm water for existing kalorama park. Date: June 4, 2015 Contractor: DixonClient: Dept Of General Services | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1500019 | |||||
SCORE 100 Phase 2 demo to existing kalorama park, phase 1 done under ex1500019, phase 2 stormwater management number is s5091 under ex1500053 currently under doee review. Phase 2 demo is for concrete walkways, plaza and pads, all playground equipment and associated materials, fence and poles. Date: November 30, 2015 Contractor: DixonClient: Dept Of General Services | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600118 | |||||
SCORE 100 Removal of concrete walk in existing kalorama park, base to remain Date: March 13, 2015 Contractor: DixonClient: Dept Of General Services | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500373 | |||||
SCORE 96 Electrical Date: April 14, 2016 Contractor: Eduardo L. LopezClient: United States Of America | Permit status: Permit issued | Permit id: E1605460 |