Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Coordinate impairment with building management so that only one zone shall be impaired at any given time; relocation of 16 pendent sprinklers on the second floor of mgh simches building Date: June 8, 2015 Contractor: Charles Pratt Permit type: Bfd other | Permit status: Na | Permit id: Sprk475901 | Parcel: 0300660000 | |||||
Add (1) strobe only to schepens lab Date: September 21, 2012 Permit status: Na | Permit id: Bfdf185266 | Parcel: 0300660000 | |||||
Cuttingburningwelding to reapir condensate return piping in water source room dpl73115 bfd paid detail required Date: June 29, 2015 Permit status: Na | Permit id: Cbw484932 | Parcel: 0300660000 | |||||
Add (1) audio visual to lab space at schepens eye research institute.; ~; doc# 20120537 Date: May 23, 2012 Permit status: Na | Permit id: Bfdf139531 | Parcel: 0300660000 | |||||
Installation of inte Date: April 26, 2012 Permit status: Na | Permit id: Chm136151 | Parcel: 0300660000 | |||||
Tenant fit-out work; ~; work being done on 4th floor ~ suite 4502 a&;b; ~; doc# 2011004 Date: October 18, 2011 Permit status: Na | Permit id: Bfdf96692 | Parcel: 0300660000 | |||||
Cutting burning welding to remove a section for inspection camera access within welded pipe for repairs to condensate pipe (dpl) bfd paid detail required Date: June 18, 2015 Permit status: Na | Permit id: Cbw484449 | Parcel: 0300660000 | |||||
SCORE 98 Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Contractor: David Finn Permit type: Bfd other | Permit status: Na | Permit id: Sprk466629 | Parcel: 0300660000 | |||||
Installation of upho Date: February 10, 2014 Permit status: Na | Permit id: Chm325527 | Parcel: 0300660000 | |||||
Installation of upho Date: August 25, 2015 Permit status: Na | Permit id: Chm506149 | Parcel: 0300660000 | |||||
SCORE 97 One room currently protected by 2 sprinkler heads is being divided into 2 rooms. During construction the sprinkler heads need to be removed. We will install 2 temporary heat detectors during construction. When construction is complete and the sprinkler heads are re-installed the heat detectors will be removed. Date: July 9, 2015 Contractor: Thomas Norton Permit type: Bfd other | Permit status: Na | Permit id: Bfdf469965 | Parcel: 0300660000 | |||||
Installation of inte Date: September 27, 2012 Permit status: Na | Permit id: Chm185737 | Parcel: 0300660000 | |||||
Installation of upho Date: June 22, 2015 Permit status: Na | Permit id: Chm486470 | Parcel: 0300660000 | |||||
Installation of upho Date: July 11, 2014 Permit status: Na | Permit id: Chm381470 | Parcel: 0300660000 | |||||
Miscellaneous cutting and welding associated with hvac units and system repairs and maintenance bfd paid detail required Date: April 16, 2013 Permit status: Na | Permit id: Cbw234792 | Parcel: 0300660000 | |||||
Cutting/burning/welding on condensate return pipe to remove a section for inspection camera access within pipe dpl8/11/15 bfd paid detail required Date: August 4, 2015 Permit status: Na | Permit id: Cbw501153 | Parcel: 0300660000 | |||||
Cutting / welding for installation of additional condensor pump on chilled water system (dpl) bfd paid detail required Date: February 9, 2012 Permit status: Na | Permit id: Cbw117234 | Parcel: 0300660000 | |||||
Removal of asbestos;for penthouse Date: June 9, 2012 Permit status: Na | Permit id: Asb149718 | Parcel: 0300660000 | |||||
To remove asbestos from 185 cambridge street boston Date: October 3, 2011 Permit status: Na | Permit id: Asb98768 | Parcel: 0300660000 | |||||
Welding / grinding for installation of "in device delay" hardware for upgrading of security devices (dpl) bfd paid detail required Date: March 2, 2015 Permit status: Na | Permit id: Cbw446025 | Parcel: 0300660000 | |||||
Cutting / welding for installation of (2) valves in chilled water piping system to accommodate installation of chilled water piping to new process equipment (dpl) bfd paid detail required Date: May 29, 2015 Permit status: Na | Permit id: Cbw477404 | Parcel: 0300660000 | |||||
Installation of upho Date: April 29, 2013 Permit status: Na | Permit id: Chm239502 | Parcel: 0300660000 | |||||
To remove asbestos Date: August 23, 2011 Permit status: Na | Permit id: Asb92221 | Parcel: 0300660000 | |||||
Cutting burning &; welding of (4) flanges on chiller in bldg-185 ;(dpl) bfd paid detail required Date: May 14, 2014 Permit status: Na | Permit id: Cbw360857 | Parcel: 0300660000 | |||||
Temporary bagging of smoke detectors for dust control during hot works Date: March 2, 2015 Permit status: Na | Permit id: Bsd446055 | Parcel: 0300660000 | |||||
Cutting &; welding for installation of pipe risers mechanical systems &; associated piping;(dpl) bfd paid detail required Date: June 20, 2011 Permit status: Na | Permit id: Cbw81797 | Parcel: 0300660000 | |||||
SCORE 100 Relocate the electrical service Client: Div Charles River Limited | Permit type: Electrical | Current use: Comm | Permit id: E17871 | Parcel: 300660000 | |||||
SCORE 86 Coordinate impairment with building management so that only one zone shall be impaired at any given time; relocation of 16 pendent sprinklers on the second floor of mgh simches building Date: June 8, 2015 Contractor: Charles Pratt Client: Charles River | Permit type: Bfd sprinkler system | Permit id: Sprk475901 | Parcel: 0300660000 | |||||
Add (1) strobe only to schepens lab Date: September 21, 2012 Client: Charles River | Permit type: Bfd fire alarm installations | Permit id: Bfdf185266 | Parcel: 0300660000 | |||||
Cutting/burning/welding to reapir condensate return piping in water source room dpl7/31/15 bfd paid detail required Date: June 29, 2015 Client: Div Charles River Limited | Permit type: Bfd cutting-burning-welding | Permit id: Cbw484932 | Parcel: 0300660000 | |||||
Add (1) audio / visual to lab space at schepens eye research institute.; ~; doc# 20120537 Date: May 23, 2012 Client: Div Charles River Limited | Permit type: Bfd fire alarm installations | Permit id: Bfdf139531 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: April 26, 2012 Client: Charles River | Permit id: Chm136151 | Parcel: 0300660000 | |||||
Tenant fit-out work; ~; work being done on 4th floor ~ suite 4502 a&;b; ~; doc# 2011004 Date: October 18, 2011 Client: Div Charles River Limited | Permit type: Bfd fire alarm installations | Permit id: Bfdf96692 | Parcel: 0300660000 | |||||
Cutting / burning / welding to remove a section for inspection camera access within welded pipe for repairs to condensate pipe (dpl) bfd paid detail required Date: June 18, 2015 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw484449 | Parcel: 0300660000 | |||||
SCORE 98 Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Contractor: David Finn Client: Div Charles River Limited | Permit type: Bfd sprinkler system | Permit id: Sprk466629 | Parcel: 0300660000 | |||||
Cutting/burning/welding of new economizer flanges onto chiller 3 bfd paid detail required Date: December 29, 2015 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw550692 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: January 4, 2016 Client: Div Charles River Limited | Permit id: Chm549151 | Parcel: 0300660000 | |||||
Temporary bagging of smoke detectors Date: January 11, 2016 Client: Div Charles River Limited | Permit type: Bfd bag smoke detectors | Permit id: Bsd553325 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: February 10, 2014 Client: Charles River | Permit id: Chm325527 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: August 25, 2015 Client: Div Charles River Limited | Permit id: Chm506149 | Parcel: 0300660000 | |||||
SCORE 97 One room currently protected by 2 sprinkler heads is being divided into 2 rooms. During construction the sprinkler heads need to be removed. We will install 2 temporary heat detectors during construction. When construction is complete and the sprinkler heads are re-installed the heat detectors will be removed. Date: July 9, 2015 Contractor: Thomas Norton Client: Div Charles River Limited | Permit type: Bfd fire alarm installations | Permit id: Bfdf469965 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: September 27, 2012 Client: Charles River | Permit id: Chm185737 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: June 22, 2015 Client: Div Charles River Limited | Permit id: Chm486470 | Parcel: 0300660000 | |||||
SCORE 100 Relocate the electrical service Client: Div Charles River Limited | Permit type: Electrical permit | Expiration date: September 16, 2010 | Current use: Comm | Permit id: E17871 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: July 11, 2014 Client: Div Charles River Limited | Permit id: Chm381470 | Parcel: 0300660000 | |||||
Miscellaneous cutting and welding associated with hvac units and system repairs and maintenance bfd paid detail required Date: April 16, 2013 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw234792 | Parcel: 0300660000 | |||||
Cutting/burning/welding on condensate return pipe to remove a section for inspection camera access within pipe dpl8/11/15 bfd paid detail required Date: August 4, 2015 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw501153 | Parcel: 0300660000 | |||||
Cutting / welding for installation of additional condensor pump on chilled water system (dpl) bfd paid detail required Date: February 9, 2012 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw117234 | Parcel: 0300660000 | |||||
Removal of asbestos;for penthouse Date: June 9, 2012 Client: Charles River | Permit type: Bfd asbestos removal | Permit id: Asb149718 | Parcel: 0300660000 | |||||
To remove asbestos from 185 cambridge street boston Date: October 3, 2011 Client: Charles River | Permit type: Bfd asbestos removal | Permit id: Asb98768 | Parcel: 0300660000 | |||||
Welding / grinding for installation of "in device delay" hardware for upgrading of security devices (dpl) bfd paid detail required Date: March 2, 2015 Client: Div Charles River Limited | Permit type: Bfd cutting-burning-welding | Permit id: Cbw446025 | Parcel: 0300660000 | |||||
Cutting / welding for installation of (2) valves in chilled water piping system to accommodate installation of chilled water piping to new process equipment (dpl) bfd paid detail required Date: May 29, 2015 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw477404 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: April 29, 2013 Client: Div Charles River Limited | Permit id: Chm239502 | Parcel: 0300660000 | |||||
To remove asbestos Date: August 23, 2011 Client: Div Charles River Limited | Permit type: Bfd asbestos removal | Permit id: Asb92221 | Parcel: 0300660000 | |||||
Cutting burning &; welding of (4) flanges on chiller in bldg-185 ;(dpl) bfd paid detail required Date: May 14, 2014 Client: Div Charles River Limited | Permit type: Bfd cutting-burning-welding | Permit id: Cbw360857 | Parcel: 0300660000 | |||||
Temporary bagging of smoke detectors for dust control during hot works Date: March 2, 2015 Client: Charles River | Permit type: Bfd bag smoke detectors | Permit id: Bsd446055 | Parcel: 0300660000 | |||||
Cutting &; welding for installation of pipe risers mechanical systems &; associated piping;(dpl) bfd paid detail required Date: June 20, 2011 Client: Charles River | Permit type: Bfd cutting-burning-welding | Permit id: Cbw81797 | Parcel: 0300660000 | |||||
SCORE 86 Modify existing animal holding rooms including new ductwork plumbing and electrical. Minimal architectural modifications. Date: September 28, 2016 Contractor: Mark Caulfield Client: Div Charles River Lps | Permit type: Bfd construction demo reno | Permit id: Fdc635610 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: October 5, 2016 Client: Div Charles River Lps | Permit id: Chm641097 | Parcel: 0300660000 | |||||
Cutting burning welding to remove a section for inspection camera access within welded pipe for repairs to condensate pipe (dpl) bfd paid detail required Date: June 18, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw484449 | Parcel: 0300660000 | |||||
Cutting &; welding;of 4" hot water line cross connect;(dpl); any impairment of the "fire protection system" will require bfd review bfd paid detail required Date: April 8, 2016 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw575864 | Parcel: 0300660000 | |||||
Welding grinding for installation of "in device delay" hardware for upgrading of security devices (dpl) bfd paid detail required Date: March 2, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw446025 | Parcel: 0300660000 | |||||
Add (1) audio visual to lab space at schepens eye research institute.; ~; doc# 20120537 Date: May 23, 2012 Client: Div Charles River Lps | Permit type: Bfd fire alarm installations | Permit id: Bfdf139531 | Parcel: 0300660000 | |||||
Temporary bagging of smoke detectors Date: August 26, 2016 Client: Div Charles River Lps | Permit type: Bfd bag smoke detectors | Permit id: Bsd630110 | Parcel: 0300660000 | |||||
Cutting burning welding of new economizer flanges onto chiller 3 bfd paid detail required Date: December 29, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw550692 | Parcel: 0300660000 | |||||
Cutting burning welding on condensate return pipe to remove a section for inspection camera access within pipe dpl8 11 15 bfd paid detail required Date: August 4, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw501153 | Parcel: 0300660000 | |||||
Temporary bagging of smoke detectors Date: April 1, 2016 Client: Div Charles River Lps | Permit type: Bfd bag smoke detectors | Permit id: Bsd576197 | Parcel: 0300660000 | |||||
SCORE 86 Covert existing cafe area into offices including new meps and architecturals. Date: March 31, 2016 Contractor: Mark Caulfield Client: Div Charles River Lps | Permit type: Bfd construction demo reno | Permit id: Fdc575563 | Parcel: 0300660000 | |||||
SCORE 98 Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Contractor: David Finn Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk466629 | Parcel: 0300660000 | |||||
Cutting burning welding to reapir condensate return piping in water source room dpl7 31 15 bfd paid detail required Date: June 29, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw484932 | Parcel: 0300660000 | |||||
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: February 8, 2016 Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk553705 | Parcel: 0300660000 | |||||
SCORE 100 Mgh-simches 3 cardiology office renovation partial third floor fire alarm renovation per nfpa stands 7 cmr. No occupancy in any impaired areas. Date: March 29, 2016 Contractor: Michael Mckinnon Client: Div Charles River Lps | Permit type: Bfd fire alarm installations | Permit id: Bfdf565159 | Parcel: 0300660000 | |||||
Temporary placement of (1) dumpster for debris removal from demolition work Date: April 22, 2016 Client: Div Charles River Lps | Permit type: Bfd temporary dumpster | Permit id: Td581385 | Parcel: 0300660000 | |||||
Bagging of smoke detectors Date: April 8, 2016 Client: Div Charles River Lps | Permit type: Bfd bag smoke detectors | Permit id: Bsd575870 | Parcel: 0300660000 | |||||
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. Date: March 4, 2016 Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk563006 | Parcel: 0300660000 | |||||
Cutting welding for installation of (2) valves in chilled water piping system to accommodate installation of chilled water piping to new process equipment (dpl) bfd paid detail required Date: May 29, 2015 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw477404 | Parcel: 0300660000 | |||||
SCORE 86 Existing multi purpose room to have folding partition demolished. New flooring act paint and millwork. Date: August 26, 2016 Contractor: Mark Caulfield Client: Div Charles River Lps | Permit type: Bfd construction demo reno | Permit id: Fdc629610 | Parcel: 0300660000 | |||||
Cutting welding for installation of additional condensor pump on chilled water system (dpl) bfd paid detail required Date: February 9, 2012 Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw117234 | Parcel: 0300660000 | |||||
Bfd chemist certificate proces Date: May 3, 2017 Client: Div Charles River Lps | Permit id: Chm699693 | Parcel: 0300660000 | |||||
SCORE 82 Relocate add 15 sprinkler heads on 6th floor of mgh simches bldg as per plans. Per nfpa 13 and 7 cmr. Date: March 3, 2017 Contractor: George Laws Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk676272 | Parcel: 0300660000 | |||||
SCORE 100 Temporary bagging of smoke detectors . Date: January 30, 2017 Contractor: Andrea Seward Client: Div Charles River Lps | Permit type: Bfd bag smoke detectors | Permit id: Bsd675890 | Parcel: 0300660000 | |||||
SCORE 86 Temporary bagging of smoke detectors Date: February 1, 2017 Contractor: Mark Caulfield Client: Div Charles River Lps | Permit type: Bfd bag smoke detectors | Permit id: Bsd677550 | Parcel: 0300660000 | |||||
SCORE 100 6th floor interior renovations to existing office and lab areas. There will be removal of a limited amount of gypsum partitions and new installed flooring is salvage and reinstall minor patching of existing acoustical ceilings. Millwork updates are included. Date: February 16, 2017 Contractor: Andrea Seward Client: Div Charles River Lps | Permit type: Bfd construction demo reno | Permit id: Fdc675889 | Parcel: 0300660000 | |||||
SCORE 98 Installation of notification devices per attached drawing on the 3rd level of mgh simches bldg. (simches 3 marketplace renovations) Date: March 27, 2017 Contractor: William Doherty Client: Div Charles River Lps | Permit type: Bfd fire alarm installations | Permit id: Bfdf685749 | Parcel: 0300660000 | |||||
SCORE 86 No other sprinkler zone in the building shall be impaired during this scheduled impairment..... Coordinator the impairment with the buildings nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr and nfpa standards. Date: February 13, 2017 Contractor: Charles Pratt Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk672956 | Parcel: 0300660000 | |||||
SCORE 81 Soldering for the installation of copper pipe fittings of heating piping to the new vav box heating equipment previously removed (dpl) Date: March 22, 2017 Contractor: Steve Bean Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw688473 | Parcel: 0300660000 | |||||
SCORE 86 The work taking place to renovate the market place includes new flooring gwb paint act millwork Date: February 1, 2017 Contractor: Mark Caulfield Client: Div Charles River Lps | Permit type: Bfd construction demo reno | Permit id: Fdc677549 | Parcel: 0300660000 | |||||
SCORE 81 Soft soldering of copper pipe fittings of the heating and chilled water piping and drain piping to a new fan coil unit Date: March 22, 2017 Contractor: Steve Bean Client: Div Charles River Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw688475 | Parcel: 0300660000 |