ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Masonry brick pointing repair and restoration work to both sides and rear of the building. Install temporary scaffolding on the south elevation to access the area of repointing. Date: October 30, 2013Client: William Schachte Jr | Applicant: Tempest, Llc | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1400991 | |||||
SCORE 93 Masonry brick pointing repair and restoration work to both sides and rear of the building. Install temporary scaffolding on the south elevation to access the area of repointing. Date: October 30, 2013 Contractor: Tempest LlcClient: William Schachte Jr | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400991 | |||||
SCORE 93 Masonry brick pointing repair and restoration work to both sides and rear of the building. Install temporary scaffolding on the south elevation to access the area of repointing. Date: October 30, 2013 Contractor: Tempest, LlcClient: William Schachte Jr | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1400991 | |||||
SCORE 100 Set up scaffolding on pvt property Date: May 14, 2015 Contractor: LopezClient: Carr | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1500087 | |||||
SCORE 100 Brick repointing Date: May 14, 2015 Contractor: LopezClient: Carr | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1507653 | |||||
SCORE 100 Electrical Date: June 22, 2015 Contractor: Ralph ThreattClient: Scott E Palmer Trustee | Permit status: Completed | Permit id: E1506807 | |||||
Plumbing and gas Date: June 22, 2015Client: Scott E Palmer Trustee | Permit status: Completed | Permit id: P1506855 | |||||
SCORE 100 Plumbing and gas Date: June 22, 2015 Contractor: Jerone ScottClient: Scott E Palmer Trustee | Permit status: Completed | Permit id: P1506855 | |||||
SCORE 69 Small section of roof above alcove --about sq feet--needs to be removed and replaced with like in kind. Date: December 11, 2015 Contractor: Lee BrennerClient: Lee Brenner | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602715 | |||||
SCORE 56 We are converting a powder room in a full bathroom by using a closet to add a shower. We are also planning on changing to sink to install a vanity and replace the toilet. Tile will be changed as well. We are also remodeling a second bathroom by adding a tub in place of the shower and replacing sink and toilet, and tile. We are adding a pocket door to close off a bedroom. Date: April 24, 2015 Contractor: Pascaline ClercClient: Pascaline Clerc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1506836 | |||||
SCORE 100 Electrical Date: June 22, 2015 Contractor: Ralph ThreattClient: Scott E Palmer Trustee | Permit status: Completed | Permit id: E1506807 | |||||
SCORE 100 Plumbing and gas Date: June 22, 2015 Contractor: Jerone ScottClient: Scott E Palmer Trustee | Permit status: Completed | Permit id: P1506855 | |||||
SCORE 56 Complete bathroom remodel including removal and replacing of tiling, vanity, toilet, and lighting. Will also frame out new closet. Plaster, sand, and paint entire work areas. Trade permits to be obtained by licensed professionals. Date: July 13, 2017 Contractor: Sam KaradagClient: Lee J Brenner | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1710694 | |||||
SCORE 96 Electrical Date: July 14, 2017 Contractor: James A. WilliamsClient: Lee J Brenner | Permit status: Completed | Permit id: E1708335 | |||||
SCORE 93 Plumbing and gas Date: July 17, 2017 Contractor: Richard L NashwinterClient: William Schachte Jr | Permit status: Permit issued | Permit id: P1707569 |