Building Permits at 1801 1st Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1801 1st Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
96
Pepco is installing two 138kv 8-way duct banks from buzzard point substation to their new waterfront substation along first street sw, t street sw, 2nd street sw and r street sw. During this construction any trees near the trenching area that are not labeled to be removed will be protected as noted on the plans. Two pepco manholes will be removed at the intersection of first and t street sw.
Date:  November 17, 2015

Permit type: Landscaping; tree removal, excavation; cathodic protection, excavation; electric ml conduit (trench), excavation; vault(s) lxw | Permit status: Cancel/withdrawn | Expiration date: November 16, 2016
2015/11/170961801 1st Street Nw Washington DcPotomac Electric Power Company
SCORE
96
Landscaping; tree removal, excavation; cathodic protection, excavation; electric ml conduit (trench), excavation; vault(s) lxw

Permit status: 3 | Expiration date: November 16, 2016 | Permit id: 0
0961801 1st Street Nw Washington DcPotomac Electric Power Company
SCORE
96
Pepco is installing two 138kv 8-way duct banks from buzzard point substation to their new waterfront substation along first street sw, t street sw, 2nd street sw and r street sw. During this construction any trees near the trenching area that are not labeled to be removed will be protected as noted on the plans. Two pepco manholes will be removed at the intersection of first and t street sw.

Permit status: Cancel/withdrawn | Expiration date: November 16, 2016 | Permit id: 0
0961801 1st Street Nw Washington DcPotomac Electric Power Company
SCORE
96
Landscaping; tree removal, excavation; cathodic protection, excavation; electric ml conduit (trench), excavation; vault(s) lxw

Permit status: 3 | Expiration date: November 16, 2016 | Permit id: 0
0961801 1st Street Nw Washington DcPotomac Electric Power Company
SCORE
96
Pepco is installing two 138kv 8-way duct banks from buzzard point substation to their new waterfront substation along first street sw, t street sw, 2nd street sw and r street sw. During this construction any trees near the trenching area that are not labeled to be removed will be protected as noted on the plans. Two pepco manholes will be removed at the intersection of first and t street sw.

Permit status: Cancel/withdrawn | Expiration date: November 16, 2016 | Permit id: 0
0961801 1st Street Nw Washington DcPotomac Electric Power Company
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.