ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition of extension portitions ,new interior portitions eletric plus hvac Date: January 9, 2012Client: Manufacturers Life Insurance | Applicant: John Nucci | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1203667 | |||||
Interior and exterior renovations including but not limited to replacement of storefronts-curtainwall on 1st and 2nd floors of bldg., repair/replace entrance sidewalk pavers, misc. Repairs-alterations to facade, renovations to1st and 2nd floor elevator lobbies, corridors and restrooms, renovations to retail tenant spaces on 1st floor, and renovations to existing core restrooms and elevator lobbies on floors 3 thru10, elevator cab upgrades, and renovations/landscaping to existing interior courtyard, all as per the attached dwgs. Date: April 20, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1204205 | |||||
Interior renovation for 2nd floor medical office space. Partitions, mep and life safety. No x-rays. Internal medicine Date: July 31, 2012Client: Manufacturers Life Insurance | Applicant: Manufacturers Life Insurance Co.; Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1212099 | |||||
Interior renovation to 11th floor elevator lobby. New ceiling, finishes, mechanical, electrical and life safety. Date: November 15, 2012Client: Manufacturers Life Insurance | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1301497 | |||||
Interior demolition to 11th floor office space. No structural demo Date: September 5, 2012Client: Manufacturers Life Insurance | Applicant: Manufacturers Life Insurance; Sam Hollen Ramco Of Dc, Inc. | Permit type: Demolition | Permit status: Permit issued | Permit id: D1201062 | |||||
Interior demolition for floors 2, 3, and 5. Date: July 31, 2012Client: Prisa Acquisition Llc | Applicant: Prudential Real Estate Investors; Janet Richardson | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200860 | |||||
Pour concrete on sunday 8/12/12 only Date: August 10, 2012Client: Prisa Acquisition Llc | Applicant: Cassidy ? Penkard; Rand Construction Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200742 | |||||
An after hours permit is needed in conjuntion with p. S. Permit number pa10069953 from 8/19/12 to 8/19/12 from 7am to 7pm Date: August 16, 2012Client: Prisa Acquisition Llc | Applicant: Roger Mitchy Jr; Carl Wilson / T.E.S. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200745 | |||||
Work m-sat from 9pm to 5am removing 2 tons of pre cast Date: June 7, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; Krissy Ger Lisa Lj Permitting | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200551 | |||||
Setting structural steel and forming concrete. Date: August 24, 2012Client: Prisa Acquisition Llc | Applicant: Cassidy ? Penkard; Rand Construction Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200779 | |||||
After hours permit in conjunction with bldg permit b1204205 for work between the hours of 7pm and 7am, monday thru saturday beginning 8-31-12 ending 9-31-12. Contact at site ron giles 703-399-4303 Date: August 30, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; John Giuseppe-Ramco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200789 | |||||
After hours permit for working between 7pm and 5am monday thru saturday, beginning 5-7-12 ending 6-7-12. In conjunction with bldg. Permit b1204205. Ron giles at 703-399-4303 is contact at site. Date: May 4, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; Giuseppe-Ramco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200469 | |||||
After hours permit in conjunction with bldg. Permit b1204205 for work between the hours of 7pm and 7am, monday thru saturday beginning 7-31-12 ending 8-31-12. Contact on site, ron giles at 703-399-4303 Date: July 31, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acqujisitions Llc; Giuseppe-Ramco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200698 | |||||
Phase 2 demolition to interior core lobby and restroom areas as shown on the attached architectural demolition dwgs. Non-structural demolition only. Interior work only Date: April 2, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; Giuseppe-Ramco | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200489 | |||||
Renewal of after hours permit no. Ah1200880 Date: December 18, 2012Client: Prisa Acquisition | Applicant: Rand Construction | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300223 | |||||
In conjunction with bldg. Permit b1204205, after hours work staring 6-17-12 ending 7-17-12 monday thur saturday 7pm to 5am, contact at site ron giles 703-399-4303 earlier after hours permit ah1200469 attached as reference. Date: May 22, 2012Client: Prisa Acquistion Llc | Applicant: Prisa Acquistion Llc; Giuseppe-Ramco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200506 | |||||
After hours permit in conjunction iwth bldg. Permit b1204205 for working between the hours of 7pm and 7am, monday thru saturday beginning 9-30-12 and ending 10-30-12. Contact at site ron giles 703-399-4303. Date: September 26, 2012Client: Prisa Acquisition Llc | Applicant: Prisa Acquisition Llc; Giuseppe-Ramco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200880 | |||||
Upgrade of existing fire alarm system which includes the following: replacement of the head-end fire alarm control panel. Re-use existing initiating devices and wiring. Provide additional strobes where necessary to meet space requirements. Replace existing bells with new speakers. Date: August 9, 2012Client: Cassidy Turley | Applicant: Quinten Washington | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1210540 | |||||
Remove one free standing fire department connection , 4-inch check valve and piping. Modify two existing fire department connection feed pipes to include 4-inch check valves and automatic ball drip. Work on p1 and 1st floor. Date: August 20, 2012Client: Manufacturers Life Insurance | Applicant: Manufacturers Life Insurance; Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1213178 | |||||
Electrical Date: September 28, 2012Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209975 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilexodd7rm2eabp3kjqt2095 Date: May 3, 2012Client: Manufactures Life Insurance | Applicant: John Nucci; Manufactures Life Insurance; Ronald Ott | Permit type: Electrical | Permit status: Completed | Permit id: E63141285 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilclen3ghjfmopkprvtssv5x Date: April 28, 2012Applicant: Dennis Stubbs Ii; Cassidy & Penka Cassidy & Penkard; Dennis Stubbs | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P73418097 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfzm0zdhp8sna%2fibr58qtbr Date: April 6, 2012Client: Preis 18 M Street | Applicant: Linda Born; Preis 18 M Street; David Weinstein | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P64918505 | |||||
Revise electrical permit e1209975 to associate with building permit b12105 to correct the incorrect building permit number as entered on the electrical permit dated 9/28/2012. The correct building permit number is b1210540 Date: November 7, 2012Client: Prisa Acquisition Llc | Applicant: John T Denny | Permit type: Electrical | Permit status: Permit issued | Permit id: E1300941 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildkg9qmt49%2f%2bvqv7idsfblu Date: August 24, 2012Client: Sam Hollen | Applicant: Sam Hollen; Sam Hollen; Phil Hauhn | Permit type: Electrical | Permit status: Permit issued | Permit id: E71107159 | |||||
Plumbing and gas Date: February 4, 2013Client: Manufacturers Life Insurance | Permit status: Permit issued | Permit id: P1302608 | |||||
Interior renovation to 3rd floor office space. Partitions, mep and life safety. Emilys list Date: January 17, 2013Client: Prisa Acquisition, Llc Cassidy Turley | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302755 | |||||
Interior only alterations to 4942 sf on the 8th floor, suite 8 for new tenant, perseus realty. Includes associated mechanical, plumbing and electrical work. Date: June 25, 2013Client: Perseus Realty | Applicant: David Fontana / Mckeever Services Corp. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1306648 | |||||
Interior renovation to 5th floor office space. Partitions, mep and life safety work. Igia suite 560 Date: July 17, 2013Client: Manufacturers Life Insurance | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1308731 | |||||
Interior renovation to 3rd floor north office space. Partitions, mep and life safety. Spitfire strategies Date: August 9, 2013Client: Prisa Acquisition Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1309776 | |||||
Renovations to street level bank for capital one bank as per the attached mechanical, plumbing, electrical, fire protection and arch. Dwgs. Interior work only. No change in use. Date: December 3, 2013Client: Prisa Acquisition Llc | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1400409 | |||||
Replacement in kind of up to 8 square feet (74. 3 square meters) of gypsum board. Replacement in kind, when applied to architectural features, means replacement with a feature of like material that replicates the existing feature in proportion, appearance, texture, design, detail and dimensions. Date: January 10, 2013Applicant: Terry Brooks | Permit type: Building | Permit status: Completed | Permit id: Pc67152649 | |||||
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: April 2, 2013Client: Raushan Murshid | Applicant: Raushan Murshid | Permit type: Building | Permit status: Permit issued | Permit id: Pc42155186 | |||||
Interior renovation to 6th floor office space. Partitions, mep and life safety. Macpac Date: January 18, 2013Client: Prisa Acquisition, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1302162 | |||||
Interior renovation to 4th floor lobby and corridors. New doors, finishes, ceiling, mechanical, electrical and life safety. Date: April 25, 2013Client: Manufacturers Life Insurance | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306090 | |||||
1st extension to building permit b12105 to expire 2/9/2014 Date: December 9, 2013Client: Turley | Applicant: Turley | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1402494 | |||||
Interior only non-load bearing demo to suite 8 on the 8th floor. Date: May 22, 2013Client: Perseus Realty | Applicant: David Fontana / Mckeever Services Corp. | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300488 | |||||
Remodeling of interior lobby, restrooms, and courtyard space Date: March 27, 2013Client: Cassidy Turley | Applicant: Rand Construction | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300444 | |||||
Remodeling of interior lobby and courtyard space Date: April 24, 2013Client: Cassidy Turley | Applicant: Rand Construction | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300531 | |||||
Remodeling of interior and courtyard space Date: May 24, 2013Client: Cassidy Turley | Applicant: Rand Construction | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300604 | |||||
One set of illuminated channel letters reading capital one back. Led face lit. Date: June 20, 2013Client: Prisa Acquisition Llc | Applicant: Emergency Sercurity; Bob Biroonak Art Display Co. | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300310 | |||||
Install storefront sign Date: October 9, 2013Client: Prisa Acquisition Llc | Applicant: ; Triangle | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400009 | |||||
1 united states post office 2 x 11 2 vapiano 2 x 11 4 1 caribou coffee 2 x 11 6 2 pnc bank 2 x 11 7 Date: March 8, 2013Client: Prisa Acqisition Llc | Applicant: Bob Biroonak Art Display Co.; Emergency Electric | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300189 | |||||
Replacing existing one double face parking sign Date: May 15, 2013Client: Cigna Investment Inc | Applicant: Cigna Investment Inc; Bob Biroonak Art Display Co. | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1300279 | |||||
4th & 5th floors Date: March 8, 2013Client: Manufacturers Life Insurance | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P1303341 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile1ctasp%2bup69blrmgcip60 Date: January 24, 2013Applicant: Dennis Stubbs Ii; Cassidy & Penka Cassidy & Penkard; Dennis Stubbs | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P82357293 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc5szjogaxc12f7vlg6%2foec Date: June 28, 2013Client: Cresa Partners | Applicant: Anthony Harris; Cresa Partners; Anthony Harris | Permit type: Electrical | Permit status: Permit issued | Permit id: E69264217 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile5q5rh9jibbbgjqmtfevfb Date: May 10, 2013Client: Manufactures Life Insurance Comapny | Applicant: Gary Mcvey; Manufactures Li Insurance Comapny; Gary Mcvey | Permit type: Electrical | Permit status: Permit issued | Permit id: E26901691 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildgk1hkvt0wxnfhuf6lyi7j Date: November 13, 2013Client: Prisa Acquisitions, Llc | Applicant: Ollie Read; Prisa Acquisitions, Llc; Christopher Schulze | Permit type: Mechanical | Permit status: Completed | Permit id: Ar27350666 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilflkscjx5vdnqfdloff6a0d Date: June 22, 2013Client: Manufacturers Life Insurance | Applicant: Heather Hollyman; Manufacturers Life Insurance; Eugene Ahns | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: Fs24257002 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild852rgsabtdu%2btevzxk7h3 Date: April 18, 2013Client: Prisa Acquisition Llc | Applicant: Andrew Arntson; Prisa Acquisition Llc; Andrew Arntson | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P86517609 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfjzcuypcnbwkrnh7eiok0k Date: December 6, 2013Applicant: Reuben Ford; Cassidy & Penkard; Francis Russell | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P43025187 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild5wexgypvas8znjl0qjbeo Date: November 13, 2013Client: Prisa Acquisition Lic | Applicant: Fred Griffith; Prisa Acquisition Lic; Jay Livesay | Permit type: Electrical | Permit status: Completed | Permit id: E79711842 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc5szjogaxc137ot9mzcwdc Date: August 2, 2013Client: Perseus Realty | Applicant: Spencer Nielsen; Perseus Realty; Scott Broadbent | Permit type: Electrical | Permit status: Completed | Permit id: E77330437 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcgz3awbzu7%2f39lahw%2fft6w Date: April 18, 2013Client: Mac Pac | Applicant: Nicholas Dodd; Mac Pac; Nicholas Dodd | Permit type: Electrical | Permit status: Completed | Permit id: E95825010 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildlblfgaa9%2bxd3bevdlzaxa Date: August 13, 2013Client: Chris Wing | Applicant: Matt Dawson; Chris Wing; Francis Diguiseppe | Permit type: Electrical | Permit status: Completed | Permit id: E30326677 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfld79r05akw%2b5s2cg3o%2fxn Date: September 4, 2013Client: Manufactures Life Insurance | Applicant: Chris Heard; Manufactures Li Insurance; Aschalew Asaminew | Permit type: Electrical | Permit status: Completed | Permit id: E46157416 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildkg9qmt49%2f%2bqmngn92tpwa Date: February 21, 2013Client: Sam Hollen | Applicant: Sam Hollen; Sam Hollen; Philip Hauhn | Permit type: Electrical | Permit status: Completed | Permit id: E78977402 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilenzmquvwbgv6%2bbqcjroeek Date: April 26, 2013Client: Sam Hollen | Applicant: George Hockadey Bay; Sam Hollen; George Hockaday-Bey | Permit type: Electrical | Permit status: Completed | Permit id: E43892081 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeile%2bz6q%2bgami9wwucf91okw6 Date: June 13, 2013Client: Emilys List | Applicant: Christopher Heard; Emilys List; Aschalew Asaminew | Permit type: Electrical | Permit status: Completed | Permit id: E68041590 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcdnpnxngkqkkmtje3cjyuu Date: March 20, 2013Client: Sam Hollen | Applicant: George Hockaday-Bey; Sam Hollen; George Hockaday-Bey | Permit type: Electrical | Permit status: Permit issued | Permit id: E29200343 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildaphl5rzwni9ommjcl7g7c Date: July 24, 2013Applicant: Bernard Kalb; Cassidy & Penkard; Bernard Kalb | Permit type: Electrical | Permit status: Permit issued | Permit id: E52793754 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilflnrby4k0aadnrmn344nj7 Date: October 12, 2013Client: Prisa Acquisition Llc | Applicant: Chris Heard; Prisa Acquisiti Llc; Aschalew Asaminew | Permit type: Electrical | Permit status: Permit issued | Permit id: E28761530 | |||||
Interior renovation to 4th and 5th floor office space. Partitions, mep, life safety and new structural convenience stair. Krooth and altman Date: February 8, 2013Client: Manufacturers Life Insurance | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302667 | |||||
Revise permit b1302162 to show correct fire alarm devices. Macpac Date: January 31, 2013Client: Prisa Acquisition, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1303542 | |||||
Revision to bldg. Permit b1204205 to shown changes to the exterior canopy all on private property, canopy has been made smaller as shown on the attached revised dwgs. No mechanical, plumbing, electrical work involved. Date: April 17, 2013Client: Prisa Acquisition Llc | Applicant: Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1305501 | |||||
Stair infill from 4th to 5th floors as per plan. Date: April 29, 2014Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1406822 | |||||
Extension of roof exhaust 6 vertically. Date: June 18, 2014Client: Capitol Q Llc | Applicant: Carlos R Iglesias | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1408761 | |||||
Common corridor renovations to the 4th floor Date: September 5, 2014Client: Prudential Real Estate Investors | Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1409205 | |||||
Add demising partition on the 4th floor Date: July 14, 2014Client: Prudential Real Estate Investors | Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1409228 | |||||
Interior renovation for structural support of 3rd floor operable partition as shown on b1410718. American land title association Date: October 14, 2014Client: Prisa Acquisition, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1500218 | |||||
Revision to previously approved building permit b1405979. Addition of a horizontal steel beam to support a new telescoping glass partition. Date: September 19, 2014Client: Prisa Acquisition Llc | Applicant: Quinten Washington | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1411711 | |||||
Interior alteration to partial first floor. Work to include mechanical electrical and plumbing Date: December 31, 2014Client: Prudential Real Estate Investors | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1502852 | |||||
New corridor renovations on 4th floor Date: November 21, 2014Client: Prisa Acquisition Llc | Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1501793 | |||||
Interior renovation to 2nd floor office space. Partitions, mep and life safety. Berkeley research group, llc Date: January 3, 2014Client: Prisa Acquisition, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1401503 | |||||
Interior renovation to 3rd floor office space. Partitions, furniture, mep and life safety. American land title association Date: October 1, 2014Client: Prisa Acquisition , Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1410718 | |||||
Interior renovation to concourse level office space. Erect new sound partition in file room. No mep work. Zuckerman spaeder, llp Date: November 20, 2014Client: Prisa Acquisition, Llc | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1501785 | |||||
First floor -shell Date: March 6, 2014Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1404193 | |||||
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: January 23, 2014Applicant: Richard Novotny | Permit type: Building | Permit status: Permit issued | Permit id: Pc23421406 | |||||
Interior demo on first floor Date: April 15, 2014Client: Prudential Real Estate Investors | Applicant: Janice Marut Permit Pushers | Permit type: Demolition | Permit status: Permit issued | Permit id: D1400426 | |||||
Demolition Date: April 8, 2014Client: Prudential Real Estate Investors | Applicant: Janice Marut Permit Pushers | Permit type: Demolition | Permit status: Permit issued | Permit id: D1400403 | |||||
Place crane in roadway to hoist materials and equipment between the hours of 2am to 7am and 7pm to 11pm saturday and sunday Date: March 20, 2014Client: Manufacturers Life Insurance | Applicant: John Pfeiffer | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400340 | |||||
Replace existing worn hoist robes with new est. Cost of work : 2,000. 00 Date: May 7, 2014Client: Manufacturers Life Insurance | Applicant: Fujitec America Inc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1401748 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild73ov0wej6opotrgjzbwmd Date: September 4, 2014Client: Prisa Acquisitions Llc | Applicant: Matt Dawson; Prisa Acquisitions Llc; L Randy Granger | Permit type: Electrical | Permit status: Completed | Permit id: E27467545 | |||||
Electrical Date: February 28, 2014Client: Prisa Acquisition Llc | Applicant: John V Narron | Permit status: Completed | Permit id: E1403639 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild3h4d%2bxhrrerrekbj%2bahge Date: December 3, 2014Client: Jasper Group | Applicant: Jasper Group; Jasper Group; Nicholas Dodd | Permit type: Electrical | Permit status: Completed | Permit id: E74802129 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildv0fczbfryif09g2xhfq6h Date: August 15, 2014Applicant: Bernard Kalb; Cassidy & Penkard; Bernard Kalb | Permit type: Electrical | Permit status: Completed | Permit id: E50804007 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildx5elsztnn2am%2b6b9rdthe Date: October 17, 2014Client: Prudential Real Estate Investors | Applicant: Thad Gerardi; Prudential Real Investors; Albert Winfield | Permit type: Electrical | Permit status: Completed | Permit id: E66843535 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfm%2f2shkre7idplcpd7sguy Date: June 23, 2014Client: John Giuseppe-Ramco | Applicant: Ronald Ferguson; John Giuseppe-Ramco; Darin Pasqualle | Permit type: Electrical | Permit status: Completed | Permit id: E67264610 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileebtthumfucybxaivfsyay Date: August 15, 2014Client: Prisa Acquisition Llc | Applicant: Chris Heard; Prisa Acquisiti Llc; Aschalew Asaminew | Permit type: Electrical | Permit status: Completed | Permit id: E96327448 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfn1cc27tjufkriqb3rqtpz Date: May 22, 2014Client: Sam Hollen | Applicant: Daniel Rucci; Sam Hollen; Bernard Kalb | Permit type: Electrical | Permit status: Completed | Permit id: E46849606 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild%2bltdp9lic2e1abjkbvhgh Date: June 12, 2014Client: Hill Stern Morley Llp Hill Stern Morley Llp | Applicant: Donald Steinman; Hill Stern Morl Hill Stern Morley Llp; Donald Steinman | Permit type: Electrical | Permit status: Completed | Permit id: E43846806 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilco44dpbfyfhxq2jjhg1iw%2f Date: December 3, 2014Client: Quinten Washington | Applicant: George Hockaday-Bey; Quinten Washington; George Hockaday-Bey | Permit type: Electrical | Permit status: Completed | Permit id: E48823188 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfi9mrcuh%2fppk1zkf0qirme Date: April 11, 2014Client: Manufacturers Life Insurance Manufacturers Life Insurance | Applicant: Donald Steinman; Manufacturers L Manufacturers Life Insurance; Donald Steinman | Permit type: Electrical | Permit status: Permit issued | Permit id: E14767115 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilez4nmv%2b8uhiltislk3i%2b6o Date: October 17, 2014Client: Manufacturers Life Insurance | Applicant: Corporate Electric; Manufacturers L Insurance; Michael Lewis | Permit type: Electrical | Permit status: Permit issued | Permit id: E31198766 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc4dn3sn%2fcahcvo%2bvxchlt%2b Date: September 10, 2014Client: Janice Marut | Applicant: Gregory Gibson; Janice Marut; Gregory Gibson | Permit type: Electrical | Permit status: Permit issued | Permit id: E56735268 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfm%2f2shkre7ic0uofs2lmx5 Date: March 22, 2014Applicant: Thad Gerardi; 18 M Street N 18 M Street Nw; Albert Winfield | Permit type: Electrical | Permit status: Permit issued | Permit id: E56824448 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildzzklv18dqcyj8tl6nnleq Date: October 4, 2014Applicant: Patrick Barron; Cassidy & Penkard; Robin Malley | Permit type: Electrical | Permit status: Permit issued | Permit id: E39169152 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildei0dowcxdlmfzrmk9pk0f Date: May 15, 2014Client: Manufacturers Life | Applicant: Kleinfield Kaplan & Becker; Manufacturers Life; Nicholas Dodd | Permit type: Electrical | Permit status: Permit issued | Permit id: E48237802 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemm8dzco2u%2fpefzr00dmf%2f Date: August 28, 2014Client: Albert Winfield | Applicant: Michael Fones; Albert Winfield; Albert Winfield | Permit type: Electrical | Permit status: Permit issued | Permit id: E84509961 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileoho4t6mhfhl9l5zf1qkec Date: October 8, 2014Client: Prisa Aqusition Llc | Applicant: Stanley Hubbard; Prisa Aqusition Llc; Stanley Hubbard | Permit type: Electrical | Permit status: Permit issued | Permit id: E82441384 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileki9hrnwr6d1grcng8p76i Date: March 13, 2014Applicant: Eleanor Farid; Prisa Acquisiti Cassidy & Penkard; Rodney Cannon | Permit type: Electrical | Permit status: Permit issued | Permit id: E99930846 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild3h4d%2bxhrree2wdc0j%2f0a%2b Date: August 6, 2014Client: Prudential Real Estate Investors | Applicant: Jeremy Clancy; Prudential Real Estate Investors; Nevin Camp | Permit type: Mechanical | Permit status: Permit issued | Permit id: Ar60601510 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileim5soytfhvlh6eigkrj1q Date: August 15, 2014Applicant: Dennis Stubbs Ii; Cassidy & Penka Cassidy & Penkard; Dennis Stubbs | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P10242824 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfm%2f2shkre7icjsgb9s8il5 Date: March 22, 2014Client: Jsi Jsi | Applicant: Nevin Camp; Jsi Jsi; Nevin Camp | Permit type: Mechanical | Permit status: Permit issued | Permit id: Ar93810320 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileki9hrnwr6d2kv%2bgng1gnz Date: June 23, 2014Client: Paul Augustine | Applicant: William Bennett; Paul Augustine; Charles Cockey | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P40832418 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilco44dpbfyfh%2b7quqhhex28 Date: December 3, 2014Client: Prisa Acquisitions | Applicant: Prisa Acquisition; Prisa Acquisitions; Carlos Montes | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P64809381 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileoho4t6mhfhkl64cffoany Date: October 7, 2014Client: Prudential Real Estate Investors | Applicant: Andrew Arntson; Prudential Real Estate Investors; Andrew Arntson | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P86296342 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildesthkgawal9k8sb7glwdg Date: July 10, 2014Client: Prudential Real Estate Investors | Applicant: Jay Kittelberger; Prudential Real Investors; John Kittelberger | Permit type: Plumbing and gas | Permit status: Permit issued | Permit id: P75591067 | |||||
Interior build out of the 1st floor of the building, inclusive of construction of new partitions, ceilings, finishes, electrical, mechanical and plumbing. Date: August 5, 2014Client: Prisa Acquisition Llc | Applicant: Quinten Washington | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1405979 | |||||
Interior alteration to suite 1100. Work to include electrical mechanical and plumbing. Date: August 21, 2014Client: Manufacturers Life Insurance | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1408513 | |||||
Interior alteration for first floor management office Date: April 29, 2014Client: Prudential Real Estate Investors | Applicant: Janice Marut Permit Pushers | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1404883 | |||||
Interior alterations and repair to suit tenant on the 4th floor. Date: September 19, 2014Client: Meridian Institute | Applicant: Jason Bentley | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1410175 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilda4tj42cw8l2zup8qhaxsr Date: October 16, 2015Client: David Metzer | Applicant: Jason Miller; David Metzer; Jason Miller | Permit type: Electrical | Permit status: Permit issued | Permit id: E29992790 | |||||
Interior alteration mechanical and electrical to replace chilled water coil units on floor3. Date: October 24, 2012Client: Prisa Acquisition Llc | Applicant: Chris Wing | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1300639 | |||||
Interior alteration to replace existing induction type units with new chilled beam type units. Install new vav boxes. Mechanical ? Electrical work on the 3rd. Floor. Date: May 14, 2013Client: Prisa Acquisition Llc | Applicant: Chris Wing | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306807 | |||||
Interior renovation of existing tenant space on the 9th floor 21981sq ft Date: June 28, 2012Client: Institute Of Museum And Library Services (imls) | Applicant: Imls; Damon Ellis | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1210307 | |||||
Electrical Date: September 4, 2012Client: Prisa Acquisition Llc | Applicant: Robert A Hunsberger | Permit status: Completed | Permit id: E1209226 | |||||
Electrical Date: September 7, 2012Client: Prisa Acquisition Llc | Applicant: John W. Hyre | Permit status: Completed | Permit id: E1209364 | |||||
Duct work and piping Date: May 1, 2012Client: Prisa Acquisition Llc | Applicant: Robert L Hunter | Permit type: Mechanical | Permit status: Completed | Permit id: M1201689 | |||||
Interior non-demising, non-bearing partitions. Mechanical, electrical, and plumbing modifications. Modifications to the exterior store front. Date: November 1, 2013Client: Prisa Acquisition Llc | Applicant: Tony Newman Del Studio Architects | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1310565 | |||||
Demolition of interior non-bearing non-demising walls as well as electrical and plubming fixtures, drop ceiling, and all finishes. Date: August 6, 2013Client: Prisa Acquisition Llc Cassidy ? Penkard | Applicant: Tony Newman Del Studio Architects | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300699 | |||||
Plumbing and gas Date: November 4, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400906 | |||||
In conjunction with plans on file, b1400409, preliminary permit for renovations to existing capital one bank branch atm room as shown on the attached arch. And elect. Dwgs. No structural, mech., plumb. Work involved. Interior work only. No change in use Date: October 29, 2013Client: Capital One Bank | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1401067 | |||||
Tenant layout for first tenant on part of the 3rd floor. 4,483 sf of work with associated mechanical, electrical, plumbing and fire protection. Date: June 18, 2013Client: Cresa Partners | Applicant: Cresa Partners; David Fontana/e Mckeever Services Corp. | Permit type: Tenant layout | Permit status: Completed | Permit id: Tl1300095 | |||||
Plumbing and gas Date: February 27, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1303156 | |||||
Plumbing and gas Date: November 4, 2013Client: Prisa Acquisition Llc | Applicant: Donald E. Decarr | Permit status: Completed | Permit id: P1400904 | |||||
Electrical Date: January 29, 2013Client: Prisa Acquisition Llc | Applicant: Mark A. Peluso | Permit status: Completed | Permit id: E1302668 | |||||
Electrical Date: September 24, 2013Client: Prisa Acquisition Llc | Applicant: Michael H Walker | Permit status: Completed | Permit id: E1308787 | |||||
Electrical Date: December 11, 2013Client: Medical Faculty Associates Inc | Applicant: Anthony G Samburg | Permit status: Completed | Permit id: E1401903 | |||||
Electrical Date: March 27, 2013Client: Prisa Acquisition Llc | Applicant: Ralph E. Jackson | Permit status: Permit issued | Permit id: E1304077 | |||||
Electrical Date: October 17, 2014Client: Prisa Acquisition Llc | Applicant: Robert C. Jayne | Permit status: Permit issued | Permit id: E1500432 | |||||
Interior alteration to mechanical system on the 3rd & 4th floor of existing office building. Date: August 21, 2014Client: Prisa Acquisition Llc | Applicant: Chris Wing | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1411113 | |||||
Interior alteration to 10th floor. Work to include electrical mechanical Date: December 31, 2014Client: Prudential Real Estate Investors | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1502851 | |||||
Interior demolition to first floor to non load bearing walls Date: November 21, 2014Client: Ascend One | Applicant: George Delgado | Permit type: Demolition | Permit status: Completed | Permit id: D1500112 | |||||
Interior build out of previously demolished space. Build out includes a reception, offices, pantry, conference rooms, open office, and privacy rooms. Date: December 1, 2014Client: Cassidy Turley | Applicant: George Delgado | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1501956 | |||||
Mechanical Date: September 30, 2014Client: Prisa Acquisition Llc | Applicant: George S Owen | Permit status: Permit issued | Permit id: M1403400 | |||||
Interior demolition to 8th floor to non load bearing walls Date: December 30, 2014Client: Prudential Real Estate Investors | Applicant: George Delgado | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500193 | |||||
Electrical Date: March 12, 2014Client: Manufacturers Life Insurance | Applicant: Bryan M. Williams | Permit status: Completed | Permit id: E1403947 | |||||
Electrical Date: April 18, 2014Client: Prisa Acquisition Llc | Applicant: Anthony G Samburg | Permit status: Permit issued | Permit id: E1404903 | |||||
Electrical Date: October 9, 2014Client: Prisa Acquisition Llc | Applicant: Anthony G Samburg | Permit status: Permit issued | Permit id: E1500241 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405485 | |||||
Plumbing and gas Date: February 7, 2013Client: Prisa Acquisition Llc | Applicant: Mark West | Permit status: Permit issued | Permit id: P1302723 | |||||
Renovations to existing 6th floor office space for hill stern, morley llp as shown on the attached mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use, no struct. Work involved. Date: May 1, 2014Client: Hill Stern Morley Llp | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1406000 | |||||
Renovations to existing 5th floor office space, american continental group as shown on the third party reviewed and approved mechanical, plumbing, electrical, fire protection, and architectural dwgs. By kta group, inc. Via projectdox. Interior work only. No change in use. No stuctural work involved. Date: September 24, 2015Client: Prisa Acquisition Llc | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1512043 | |||||
SCORE 100 Interior alteration to replace existing induction type units with new chilled beam type units. Install new vav boxes. Mechanical ? Electrical work on the 3rd. Floor. Date: May 14, 2013 Contractor: Chris WingClient: Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306807 | |||||
SCORE 100 Interior alteration mechanical and electrical to replace chilled water coil units on floor3. Date: October 24, 2012 Contractor: Chris WingClient: Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1300639 | |||||
SCORE 96 Electrical Date: September 7, 2012 Contractor: John W. HyreClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209364 | |||||
Plumbing and gas Date: May 11, 2016Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606134 | |||||
SCORE 96 Electrical Date: September 7, 2012 Contractor: John W. HyreClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209364 | |||||
Plumbing and gas Date: May 11, 2016Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606134 | |||||
SCORE 96 Electrical Date: September 7, 2012 Contractor: John W. HyreClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209364 | |||||
SCORE 96 Interior demo to 9th floor Date: February 23, 2016 Contractor: Kristina DelgadoClient: Prudential Real Estate Investors | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600325 | |||||
SCORE 56 Interior alteration to the 9th floor mechanical system. Date: September 9, 2016Client: Prisa Acquisition Llc Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609619 | |||||
Plumbing and gas Date: May 11, 2016Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606134 | |||||
SCORE 96 Electrical Date: September 4, 2012 Contractor: Robert A HunsbergerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209226 | |||||
SCORE 94 Plumbing and gas Date: August 21, 2012 Contractor: Jose BermudezClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1207468 | |||||
SCORE 96 Electrical Date: September 4, 2012 Contractor: Robert A HunsbergerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209226 | |||||
SCORE 94 Plumbing and gas Date: August 21, 2012 Contractor: Jose BermudezClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1207468 | |||||
SCORE 96 Electrical Date: September 4, 2012 Contractor: Robert A HunsbergerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1209226 | |||||
SCORE 94 Plumbing and gas Date: August 21, 2012 Contractor: Jose BermudezClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1207468 | |||||
SCORE 96 Duct work and piping Date: May 1, 2012 Contractor: Robert L HunterClient: Prisa Acquisition Llc | Permit type: Mechanical | Permit status: Completed | Permit id: M1201689 | |||||
Plumbing and gas Date: May 7, 2013Client: Manufacturers Life Insurance | Permit status: Permit issued | Permit id: P1304808 | |||||
Plumbing and gas Date: May 7, 2013Client: Manufacturers Life Insurance | Permit status: Permit issued | Permit id: P1304808 | |||||
SCORE 56 Interior renovation of existing tenant space on the 9th floor 21981sq ft Date: June 28, 2012 Contractor: Imls Damon EllisClient: Institute Of Museum And Library Services (imls) | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210307 | |||||
SCORE 56 Interior renovation of existing tenant space on the 9th floor 21981sq ft Date: June 28, 2012 Contractor: Imls; Damon EllisClient: Institute Of Museum And Library Services (imls) | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210307 | |||||
Plumbing and gas Date: May 7, 2013Client: Manufacturers Life Insurance | Permit status: Permit issued | Permit id: P1304808 | |||||
Plumbing and gas Date: November 4, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400906 | |||||
Plumbing and gas Date: November 4, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400906 | |||||
SCORE 72 Interior non-demising, non-bearing partitions. Mechanical, electrical, and plumbing modifications. Modifications to the exterior store front. Date: November 1, 2013 Contractor: Tony Newman Del Studio ArchitectsClient: Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1310565 | |||||
SCORE 72 Demolition of interior non-bearing non-demising walls as well as electrical and plubming fixtures, drop ceiling, and all finishes. Date: August 6, 2013 Contractor: Tony Newman Del Studio ArchitectsClient: Prisa Acquisition Llc Cassidy ? Penkard | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300699 | |||||
Plumbing and gas Date: November 4, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400906 | |||||
SCORE 93 In conjunction with plans on file, b1400409, preliminary permit for renovations to existing capital one bank branch atm room as shown on the attached arch. And elect. Dwgs. No structural, mech., plumb. Work involved. Interior work only. No change in use Date: October 29, 2013 Contractor: John GiusepperamcoClient: Capital One Bank | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1401067 | |||||
SCORE 56 Tenant layout for first tenant on part of the 3rd floor. 4,483 sf of work with associated mechanical, electrical, plumbing and fire protection. Date: June 18, 2013Client: Cresa Partners | Permit type: Tenant layout | Permit status: Completed | Permit id: Tl1300095 | |||||
SCORE 56 Tenant layout for first tenant on part of the 3rd floor. 4,483 sf of work with associated mechanical, electrical, plumbing and fire protection. Date: June 18, 2013Client: Cresa Partners | Permit type: Tenant layout | Permit status: Completed | Permit id: Tl1300095 | |||||
SCORE 96 Electrical Date: January 29, 2013 Contractor: Mark A. PelusoClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1302668 | |||||
SCORE 96 Mechanical Date: January 22, 2013 Contractor: Michael F. DidionClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300764 | |||||
SCORE 96 Electrical Date: January 29, 2013 Contractor: Mark A. PelusoClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1302668 | |||||
SCORE 96 Mechanical Date: January 22, 2013 Contractor: Michael F. DidionClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300764 | |||||
SCORE 96 Electrical Date: January 29, 2013 Contractor: Mark A. PelusoClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1302668 | |||||
SCORE 96 Mechanical Date: January 22, 2013 Contractor: Michael F. DidionClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300764 | |||||
SCORE 96 Electrical Date: December 11, 2013 Contractor: Anthony G SamburgClient: Medical Faculty Associates Inc | Permit status: Completed | Permit id: E1401903 | |||||
SCORE 96 Electrical Date: December 11, 2013 Contractor: Anthony G SamburgClient: Medical Faculty Associates Inc | Permit status: Completed | Permit id: E1401903 | |||||
SCORE 96 Electrical Date: December 11, 2013 Contractor: Anthony G SamburgClient: Medical Faculty Associates Inc | Permit status: Completed | Permit id: E1401903 | |||||
SCORE 96 Electrical Date: June 26, 2013 Contractor: James W LasherClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1306353 | |||||
SCORE 96 Mechanical Date: February 19, 2013 Contractor: Robert L HunterClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300964 | |||||
Plumbing and gas Date: February 27, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1303156 | |||||
SCORE 89 Plumbing and gas Date: July 16, 2013 Contractor: Shaw HergenratherClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306407 | |||||
Plumbing and gas Date: October 15, 2013Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1400350 | |||||
Plumbing and gas Date: August 5, 2013Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306932 | |||||
SCORE 96 Plumbing and gas Date: July 24, 2013 Contractor: Mark F SchweberClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306626 | |||||
SCORE 96 Electrical Date: June 26, 2013 Contractor: James W LasherClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1306353 | |||||
SCORE 96 Mechanical Date: February 19, 2013 Contractor: Robert L HunterClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300964 | |||||
Plumbing and gas Date: August 5, 2013Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306932 | |||||
SCORE 96 Plumbing and gas Date: July 24, 2013 Contractor: Mark F SchweberClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306626 | |||||
SCORE 89 Plumbing and gas Date: July 16, 2013 Contractor: Shaw HergenratherClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306407 | |||||
SCORE 96 Electrical Date: June 26, 2013 Contractor: James W LasherClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1306353 | |||||
SCORE 89 Plumbing and gas Date: July 16, 2013 Contractor: Shaw HergenratherClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306407 | |||||
Plumbing and gas Date: October 15, 2013Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1400350 | |||||
SCORE 96 Plumbing and gas Date: July 24, 2013 Contractor: Mark F SchweberClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306626 | |||||
Plumbing and gas Date: August 5, 2013Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1306932 | |||||
SCORE 96 Mechanical Date: February 19, 2013 Contractor: Robert L HunterClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1300964 | |||||
Plumbing and gas Date: February 27, 2013Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1303156 | |||||
SCORE 82 Electrical Date: September 24, 2013 Contractor: Michael H WalkerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1308787 | |||||
SCORE 82 Electrical Date: September 24, 2013 Contractor: Michael H WalkerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1308787 | |||||
SCORE 82 Electrical Date: September 24, 2013 Contractor: Michael H WalkerClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1308787 | |||||
SCORE 96 Electrical Date: March 27, 2013 Contractor: Ralph E. JacksonClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1304077 | |||||
SCORE 98 Plumbing and gas Date: October 24, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1500675 | |||||
SCORE 93 Electrical Date: October 17, 2014 Contractor: Robert C. JayneClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500432 | |||||
SCORE 96 Electrical Date: March 27, 2013 Contractor: Ralph E. JacksonClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1304077 | |||||
SCORE 93 Electrical Date: October 17, 2014 Contractor: Robert C. JayneClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500432 | |||||
SCORE 98 Plumbing and gas Date: October 24, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1500675 | |||||
SCORE 98 Plumbing and gas Date: October 24, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1500675 | |||||
SCORE 96 Electrical Date: March 27, 2013 Contractor: Ralph E. JacksonClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1304077 | |||||
SCORE 93 Electrical Date: October 17, 2014 Contractor: Robert C. JayneClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500432 | |||||
SCORE 98 Plumbing and gas Date: October 24, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1500675 | |||||
SCORE 93 Plumbing and gas Date: November 4, 2013 Contractor: Donald E. DecarrClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400904 | |||||
SCORE 93 Plumbing and gas Date: November 4, 2013 Contractor: Donald E. DecarrClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400904 | |||||
SCORE 93 Plumbing and gas Date: November 4, 2013 Contractor: Donald E. DecarrClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1400904 | |||||
SCORE 84 Plumbing and gas Date: February 7, 2013 Contractor: Mark WestClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1302723 | |||||
SCORE 84 Plumbing and gas Date: February 7, 2013 Contractor: Mark WestClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1302723 | |||||
SCORE 93 Renovations to existing 6th floor office space for hill stern, morley llp as shown on the attached mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use, no struct. Work involved. Date: May 1, 2014 Contractor: John GiusepperamcoClient: Hill Stern Morley Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406000 | |||||
SCORE 84 Plumbing and gas Date: February 7, 2013 Contractor: Mark WestClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1302723 | |||||
SCORE 96 Mechanical Date: September 30, 2014 Contractor: George S OwenClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: M1403400 | |||||
SCORE 98 Plumbing and gas Date: October 9, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1500242 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405486 | |||||
SCORE 96 Mechanical Date: September 30, 2014 Contractor: George S OwenClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: M1403400 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405486 | |||||
SCORE 98 Plumbing and gas Date: October 9, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1500242 | |||||
SCORE 96 Mechanical Date: September 30, 2014 Contractor: George S OwenClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: M1403400 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405486 | |||||
SCORE 98 Plumbing and gas Date: October 9, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1500242 | |||||
SCORE 100 Interior build out of previously demolished space. Build out includes a reception, offices, pantry, conference rooms, open office, and privacy rooms. Date: December 1, 2014 Contractor: George DelgadoClient: Cassidy Turley | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1501956 | |||||
SCORE 98 Plumbing and gas Date: October 9, 2014 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1500242 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405486 | |||||
SCORE 96 Mechanical Date: September 30, 2014 Contractor: George S OwenClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: M1403400 | |||||
SCORE 100 Interior alteration to mechanical system on the 3rd & 4th floor of existing office building. Date: August 21, 2014 Contractor: Chris WingClient: Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411113 | |||||
SCORE 96 Plumbing and gas Date: May 17, 2016 Contractor: Jay H SchwabClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606307 | |||||
SCORE 96 Plumbing and gas Date: May 17, 2016 Contractor: Jay H SchwabClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606307 | |||||
SCORE 100 Interior alteration to 10th floor. Work to include electrical mechanical Date: December 31, 2014 Contractor: George DelgadoClient: Prudential Real Estate Investors | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1502851 | |||||
SCORE 96 Plumbing and gas Date: May 17, 2016 Contractor: Jay H SchwabClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1606307 | |||||
Plumbing and gas Date: March 19, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1504356 | |||||
SCORE 100 Interior demolition to first floor to non load bearing walls Date: November 21, 2014 Contractor: George DelgadoClient: Ascend One | Permit type: Demolition | Permit status: Completed | Permit id: D1500112 | |||||
Plumbing and gas Date: March 11, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1504106 | |||||
Plumbing and gas Date: March 19, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1504356 | |||||
SCORE 89 Electrical Date: March 12, 2014 Contractor: Bryan M. WilliamsClient: Manufacturers Life Insurance | Permit status: Completed | Permit id: E1403947 | |||||
SCORE 89 Electrical Date: March 12, 2014 Contractor: Bryan M. WilliamsClient: Manufacturers Life Insurance | Permit status: Completed | Permit id: E1403947 | |||||
Plumbing and gas Date: December 21, 2016Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1702305 | |||||
SCORE 100 Interior demolition to 8th floor to non load bearing walls Date: December 30, 2014 Contractor: George DelgadoClient: Prudential Real Estate Investors | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500193 | |||||
SCORE 89 Electrical Date: March 12, 2014 Contractor: Bryan M. WilliamsClient: Manufacturers Life Insurance | Permit status: Completed | Permit id: E1403947 | |||||
Plumbing and gas Date: December 21, 2016Client: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1702305 | |||||
SCORE 96 Electrical Date: April 18, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1404903 | |||||
SCORE 96 Electrical Date: April 18, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1404903 | |||||
SCORE 96 Electrical Date: April 18, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1404903 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500241 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500241 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1500241 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405485 | |||||
SCORE 96 Plumbing and gas Date: January 29, 2015 Contractor: Jay W LippClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1503057 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405485 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405485 | |||||
Plumbing and gas Date: May 13, 2014Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1405485 | |||||
SCORE 96 Plumbing and gas Date: January 29, 2015 Contractor: Jay W LippClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1503057 | |||||
SCORE 96 Plumbing and gas Date: January 12, 2015 Contractor: Mark F SchweberClient: Ring Associates Llc | Permit status: Completed | Permit id: P1502577 | |||||
SCORE 96 Plumbing and gas Date: February 18, 2015 Contractor: Christos T. SakkosClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1503544 | |||||
SCORE 96 Plumbing and gas Date: May 1, 2015 Contractor: Christos T. SakkosClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1505502 | |||||
SCORE 96 Plumbing and gas Date: January 12, 2015 Contractor: Mark F SchweberClient: Ring Associates Llc | Permit status: Completed | Permit id: P1502577 | |||||
SCORE 96 Plumbing and gas Date: February 18, 2015 Contractor: Christos T. SakkosClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1503544 | |||||
Plumbing and gas Date: June 14, 2017Client: Manufacturers Life Insurance | Permit status: Permit issued | Permit id: P1706647 | |||||
SCORE 89 Plumbing and gas Date: January 29, 2015 Contractor: Shaw HergenratherClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1503080 | |||||
SCORE 89 Plumbing and gas Date: January 29, 2015 Contractor: Shaw HergenratherClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: P1503080 | |||||
SCORE 98 Plumbing and gas Date: February 22, 2017 Contractor: David FlemingClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1703865 | |||||
SCORE 100 Interior alteration to existing tenant space. Work to include electrical mechanical and plumbing Date: February 20, 2015 Contractor: George DelgadoClient: Ascend One | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502607 | |||||
SCORE 96 Electrical Date: February 4, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1503050 | |||||
SCORE 96 Electrical Date: February 4, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1503050 | |||||
SCORE 92 Electrical Date: April 2, 2015 Contractor: Harold Clinton FeltsClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1504589 | |||||
SCORE 96 Mechanical Date: February 12, 2015 Contractor: Christos T SakkosClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1501108 | |||||
Plumbing and gas Date: June 3, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1506296 | |||||
SCORE 92 Electrical Date: April 2, 2015 Contractor: Harold Clinton FeltsClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1504589 | |||||
Plumbing and gas Date: February 5, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1503253 | |||||
Plumbing and gas Date: June 3, 2015Client: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: P1506296 | |||||
SCORE 96 Mechanical Date: February 12, 2015 Contractor: Christos T SakkosClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: M1501108 | |||||
SCORE 96 Electrical Date: April 6, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1504689 | |||||
SCORE 96 Electrical Date: April 6, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1504689 | |||||
SCORE 56 Interior alteration to mechanical system on the 7th floor of existing office building Date: November 18, 2015 Contractor: Prisa Acquisiti Prisa Acquisition LlcClient: Prisa Acquisition Llc Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1600812 | |||||
SCORE 100 Interior alteration to suite 400s of existing office space. Date: December 10, 2015 Contractor: George DelgadoClient: Cushman And Wakefield,Inc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601464 | |||||
SCORE 96 Electrical Date: December 29, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1602431 | |||||
SCORE 100 Interior alteration to common area corridor and suite demising wall - 7th floor Date: October 19, 2015 Contractor: George DelgadoClient: Prudential Real Estate Investors | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1600363 | |||||
SCORE 96 Electrical Date: December 29, 2015 Contractor: Dennis R. WoodeClient: Prisa Acquisition Llc | Permit status: Completed | Permit id: E1602431 | |||||
SCORE 93 Renovations to existing 5th floor office space, american continental group as shown on the third party reviewed and approved mechanical, plumbing, electrical, fire protection, and architectural dwgs. By kta group, inc. Via projectdox. Interior work only. No change in use. No stuctural work involved. Date: September 24, 2015 Contractor: John GiusepperamcoClient: Prisa Acquisition Llc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1512043 | |||||
SCORE 96 Electrical Date: March 8, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1604399 | |||||
SCORE 96 Electrical Date: March 8, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1604399 | |||||
SCORE 96 Electrical Date: March 8, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1604399 | |||||
SCORE 56 Create conference room and workstations on 4th floor. Date: April 12, 2016 Contractor: Meridian Institute; Tanya HillClient: Meridian Institute | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1606892 | |||||
SCORE 96 Mechanical Date: February 21, 2017 Contractor: George S OwenClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: M1701347 | |||||
SCORE 96 Electrical Date: February 22, 2017 Contractor: James A. WilliamsClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1704010 | |||||
SCORE 79 Electrical Date: February 17, 2017 Contractor: James F. ColeyClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1703908 | |||||
SCORE 96 Electrical Date: August 4, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608833 | |||||
SCORE 96 Electrical Date: July 15, 2016 Contractor: John V NarronClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608158 | |||||
SCORE 96 Electrical Date: August 4, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608833 | |||||
SCORE 96 Electrical Date: September 7, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1609880 | |||||
SCORE 96 Electrical Date: July 15, 2016 Contractor: John V NarronClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608158 | |||||
SCORE 96 Electrical Date: July 15, 2016 Contractor: John V NarronClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608158 | |||||
SCORE 96 Electrical Date: September 7, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1609880 | |||||
SCORE 96 Electrical Date: August 4, 2016 Contractor: Anthony G SamburgClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1608833 | |||||
SCORE 96 Electrical Date: July 11, 2016 Contractor: Keith A MyersClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1607982 | |||||
SCORE 96 Electrical Date: July 11, 2016 Contractor: Keith A MyersClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1607982 | |||||
SCORE 96 Electrical Date: July 11, 2016 Contractor: Keith A MyersClient: Prisa Acquisition Llc | Permit status: Permit issued | Permit id: E1607982 |