ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 63 To oversee temporary festival power of (2) 45 kva generator sets. Shall be on site during event. The chomp n stomp festival is scheduled for november 2,2013. Shall have temporory gen set delivered and tested the afternoon of november 1,2013 Date: September 24, 2013 Contractor: Fredrik ElectricPermit type: Electrical | Permit status: Issued | Permit id: Be-201307873 | |||||
Shall oversee the electrial connectioin fof (2) 45kva generator sets. This is for a period of one day, chomp n stomp festival on 11 3 12. Shall test all of the temporary equipment the day before, 11 2 12. Gen set should be dropped off by 11am Date: October 10, 2012Permit type: Electrical | Permit status: Issued | Permit id: Be-201208227 | |||||
Repair siding and paint exterior. 5" exposure- smooth cement siding Date: July 10, 2012Permit type: Repair | Permit status: Routed for review | Permit id: Bb-201203337 | |||||
SCORE 63 Over see electrical connection for 45kva generator-chomp@stomp festival inside the park on 11 05 2011 Date: November 3, 2011 Contractor: Fredrik ElectricPermit type: Electrical | Permit status: Issued | Permit id: Be-201107876 |