Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install portable ada lift chair, core drill existing deck, set with anchoring cement. Install 3/8 inch bolt at back. Electrician will bond and get electrical permit. Date: May 20, 2013 Client: United States Of America | Applicant: Brown | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307009 | |||||
Demo to concrete surfaces,playground equipment and fencing Date: June 24, 2013 Client: Dgs | Applicant: Dgs; George Delgado | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300579 | |||||
SCORE 56 Demo to concrete surfaces,playground equipment and fencing Date: June 24, 2013 Contractor: Dgs George Delgado Client: Dgs | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300579 | |||||
SCORE 56 Demo to concrete surfaces,playground equipment and fencing Date: June 24, 2013 Contractor: Dgs; George Delgado Client: Dgs | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300579 | |||||
SCORE 100 Minor renovations to existing harry thomas sr recreation center to bring building into ada compliance Date: April 26, 2016 Contractor: Dixon Client: Dept Of General Services | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605129 | |||||
SCORE 99 Install portable ada lift chair, core drill existing deck, set with anchoring cement. Install 3/8 inch bolt at back. Electrician will bond and get electrical permit. Date: May 20, 2013 Contractor: Brown Client: United States Of America | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307009 |