ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
The work will be performed generally north of the north curb and gutter, along sunnyside ave (8 south), between guardsman way (16 east) to and foothill drive (21 east) and alternate bid 1 (1581 east) and bid 2 (15 east to 16 east). Work of this construction contract generally comprises, but is not limited to, the following: the installation of the concrete trail (12 wide, with 2 shoulders, or 1 shoulder at wall locations); concrete curb walls and walls with reinforcement; sidewalk removal; landscape restoration; modifications to drive approaches, curb and gutter, and ada pedestrian ramps; and trail signage. Date: June 7, 2016Permit status: Inspections | Completion date: July 22, 2016 | Current use: Commercial | Permit id: Bld2016-05416 | |||||
SCORE 59 The work will be performed generally north of the north curb and gutter, along sunnyside ave (8 south), between guardsman way (16 east) to and foothill drive (21 east) and alternate bid 1 (1581 east) and bid 2 (15 east to 16 east). Work of this construction contract generally comprises, but is not limited to, the following: the installation of the concrete trail (12 wide, with 2 shoulders, or 1 shoulder at wall locations); concrete curb walls and walls with reinforcement; sidewalk removal; landscape restoration; modifications to drive approaches, curb and gutter, and ada pedestrian ramps; and trail signage. Date: June 7, 2016Permit status: Inspections | Completion date: July 22, 2016 | Current use: Commercial | Permit id: Bld2016-05416 |