ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: March 26, 2015Permit type: Building : 3309 - re | Permit status: Permit finaled | Completion date: May 19, 2015 | Permit id: Pds2015-Resalt- | |||||
Windows and/or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: March 26, 2015Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 19, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: March 26, 2015 Contractor: Huntamer IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: May 19, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 9/17/15-plan change to add a/c disconnects. Kp. Date: August 5, 2015 Contractor: Solarcity CorporationPermit type: Residential alteration-addn | Permit status: Completed | Completion date: September 29, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 97 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 31, 2017 Contractor: Walter Anderson Plumbing IncPermit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: September 28, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Sewer/septic connect Date: July 20, 2005Permit status: Pass | Permit id: Pds2005-1033-20 |