Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Velez used mh Date: November 28, 2011 Permit status: Closed | Permit id: 11-06274 | |||||
SCORE 100 Velez used mh Client: Velez Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-06274 | Parcel: 21964 | |||||
SCORE 88 Velez used mh Client: Velez Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-06274 | Parcel: 21964 | |||||
November 2, 2011 12:22:13 pm kneel. Velez - used mh to park. Location: patton to new leceister hwy to valley king dr.; november 28, 2011 7:52:31 am kneel. Velez - used mh to park.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting Permit type: Permits - historical | Permit status: Closed | Permit id: 11-06274 | Parcel: 21964 | |||||
Velez used mh Date: November 28, 2011 Value: $8,000 Permit type: Historical | Permit status: Closed | Permit id: 11-06274 | |||||
November 2, 2011 12:22:13 pm kneel. Velez - used mh to park. Location: patton to new leceister hwy to valley king dr.; november 28, 2011 7:52:31 am kneel. Velez - used mh to park.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting Date: November 28, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-06274 | Parcel: 21964 |