ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Construction staging area Date: December 2, 2013 Contractor: Washington GasPermit status: Expired | Expiration date: December 30, 2013 | Permit id: Pa10122563 | |||||
SCORE 100 Construction staging area Date: April 8, 2014 Contractor: Washington GasPermit status: Expired | Expiration date: April 29, 2014 | Permit id: Pa10132578 | |||||
SCORE 100 Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; valves (excavation), excavation; water ml (trench) Contractor: Dcwater CipPermit status: 10 | Expiration date: December 9, 2017 | Permit id: 0 | |||||
SCORE 100 Dc water will be performing replacement of existing water mains and fire hydrants in the colonial village neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on north portal drive nw from east beach drive to birch drive nw, redwood terrace nw from east beach drive nw to birch drive nw, east beach drive nw from portal drive nw to redwood terrace nw, birch drive nw from redwood terrace nw to north portal drive nw, poplar lane nw from portal drive nw to orchid street nw and orchid street nw from primrose road nw to kalmia road nw. Date: February 9, 2017 Contractor: Dcwater CipPermit type: Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; valves (excavation), excavation; water ml (trench) | Permit status: Revise and resubmit | Expiration date: December 9, 2017 | Permit id: 0 | |||||
SCORE 100 Dc water will be performing replacement of existing water mains and fire hydrants in the colonial village neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on north portal drive nw from east beach drive to birch drive nw, redwood terrace nw from east beach drive nw to birch drive nw, east beach drive nw from portal drive nw to redwood terrace nw, birch drive nw from redwood terrace nw to north portal drive nw, poplar lane nw from portal drive nw to orchid street nw and orchid street nw from primrose road nw to kalmia road nw. Contractor: Dcwater CipPermit status: Revise and resubmit | Expiration date: December 9, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: February 18, 2014 Contractor: Washington GasPermit status: Permit expired | Expiration date: March 30, 2014 | Permit id: Pa10129332 | |||||
SCORE 100 Dc water will be performing replacement of existing water mains and fire hydrants in the colonial village neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on north portal drive nw from east beach drive to birch drive nw, redwood terrace nw from east beach drive nw to birch drive nw, east beach drive nw from portal drive nw to redwood terrace nw, birch drive nw from redwood terrace nw to north portal drive nw, poplar lane nw from portal drive nw to orchid street nw and orchid street nw from primrose road nw to kalmia road nw. Contractor: Dcwater CipPermit type: Excavation; fire hydrant(s), excavation; multiple house connections (utility co. Only), excavation; valves (excavation), excavation; water ml (trench) | Permit status: Issued | Expiration date: January 2, 2018 | Permit id: Pa200702-R1 | |||||
SCORE 100 Dc water will be performing replacement of existing water mains and fire hydrants in the colonial village neighborhood of the district. These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system. Work will occur on north portal drive nw from east beach drive to birch drive nw, redwood terrace nw from east beach drive nw to birch drive nw, east beach drive nw from portal drive nw to redwood terrace nw, birch drive nw from redwood terrace nw to north portal drive nw, poplar lane nw from portal drive nw to orchid street nw and orchid street nw from primrose road nw to kalmia road nw. Date: August 22, 2017 Contractor: Dcwater CipPermit status: Issued | Expiration date: November 3, 2017 | Permit id: Pa200702 | |||||
SCORE 100 Construction staging area Date: October 1, 2013 Contractor: Washington GasPermit status: Permit expired | Expiration date: October 31, 2013 | Permit id: Pa10116362 |