ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Temporary placement of dumpster Date: November 4, 2010 Contractor: Turner ConstructionPermit type: Bfd temporary dumpster | Permit id: Td49180 | |||||
SCORE 79 Interior demolition of the former salvation army building.; no exterior work Permit type: Short form bldg permit | Expiration date: January 20, 2011 | Current use: Comm | Permit id: Sf34396 | |||||
SCORE 92 See building permit application sf50474 for demolition of existing vacant building located at 169 to 189 columbus avenue. Combine this lot with the following three additional lots for new building to be built and known as 157 berkeley street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue (aka 3 stuart street) 155 to 167 columbus avenue and 324 to 3 stuart street. Date: December 16, 2010 Contractor: Ted DurosPermit type: Long form/alteration permit | Expiration date: June 16, 2011 | Current use: Comm | Permit id: Alt50725 | |||||
Complete demolition of building Date: November 5, 2010Permit type: Bfd construction demo reno | Permit id: Fdc49633 | |||||
SCORE 99 Raze existing vacant building located at 169 to 189 columbus avenue and combine this lot with the following three additional lots for new building to be built and known as 157 berkely street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue 155 to 167 columbus avenue and 324 to 3 stuart street. Permit type: Short form bldg permit | Expiration date: May 8, 2011 | Current use: Comm | Permit id: Sf50474 | |||||
Interior renovations to include tile carpet ;complete gut &; takedown Date: July 26, 2010Permit type: Bfd construction demo reno | Permit id: Fdc35059 | |||||
Interior demolition of tile carpet partitions windows hvac etc. Date: July 28, 2010Permit type: Bfd temporary dumpster | Permit id: Td35456 | |||||
Temporary placement of (2) dumpsters for debris removal from construction work Date: January 26, 2012Permit type: Bfd temporary dumpster | Permit id: Td113596 | |||||
Cutting / welding for removal of steel stack piping and boiler components (dpl 12/31/10) bfd paid detail required Date: September 14, 2010Permit type: Bfd cutting-burning-welding | Permit id: Cbw41613 | |||||
Occupy manhole; renewal Date: September 14, 2012Client: The Salvation A | Permit type: Street occupancy permit | Expiration date: October 14, 2012 | Permit id: Occu-142568 | Parcel: 0501149000 | |||||
Interior demolition doc#20100608 Date: December 9, 2011Permit type: Bfd fire alarm installations | Permit id: Bfdf35113 | |||||
SCORE 79 Cutting concrete floor openings 5 x 5 for internal shoot last hole will be cut over exterior access ramp which cannot be seen from street.; (contract with sf34396) Client: The Salvation A | Permit type: Short form bldg permit | Expiration date: February 11, 2011 | Current use: Comm | Permit id: Sf37785 | Parcel: 0501149000 | |||||
SCORE 99 Raze existing vacant building located at 169 to 189 columbus avenue and combine this lot with the following three additional lots for new building to be built and known as 157 berkely street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue 155 to 167 columbus avenue and 324 to 3 stuart street. Permit type: Removal of structure | Permit status: Expired | Current use: Comm | Permit id: Sf50474 | |||||
SCORE 92 See building permit application sf50474 for demolition of existing vacant building located at 169 to 189 columbus avenue. Combine this lot with the following three additional lots for new building to be built and known as 157 berkeley street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue (aka 3 stuart street) 155 to 167 columbus avenue and 324 to 3 stuart street. Date: December 16, 2010 Contractor: Ted DurosPermit type: Other | Permit status: Expired | Current use: Comm | Permit id: Alt50725 | |||||
SCORE 79 Interior demolition of the former salvation army building.; no exterior work Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf34396 | |||||
SCORE 79 Cutting concrete floor openings 5 x 5 for internal shoot last hole will be cut over exterior access ramp which cannot be seen from street.; (contract with sf34396) Client: Berkeley Columbus Real | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf37785 | Parcel: 0501149000 | |||||
SCORE 100 Temporary placement of dumpster Date: November 4, 2010 Contractor: Turner ConstructionPermit type: Bfd temporary dumpster | Permit id: Td49180 | |||||
Interior demolition of tile carpet partitions windows hvac etc. Date: July 28, 2010Permit type: Bfd temporary dumpster | Permit id: Td35456 | |||||
Complete demolition of building Date: November 5, 2010Permit type: Bfd construction demo reno | Permit id: Fdc49633 | |||||
SCORE 79 Interior demolition of the former salvation army building.; no exterior work Permit type: Short form bldg permit | Expiration date: January 20, 2011 | Current use: Comm | Permit id: Sf34396 | |||||
SCORE 92 See building permit application sf50474 for demolition of existing vacant building located at 169 to 189 columbus avenue. Combine this lot with the following three additional lots for new building to be built and known as 157 berkeley street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue (aka 3 stuart street) 155 to 167 columbus avenue and 324 to 3 stuart street. Date: December 16, 2010 Contractor: Ted DurosPermit type: Long form/alteration permit | Expiration date: June 16, 2011 | Current use: Comm | Permit id: Alt50725 | |||||
SCORE 99 Raze existing vacant building located at 169 to 189 columbus avenue and combine this lot with the following three additional lots for new building to be built and known as 157 berkely street. The three other lots to be combined into one parcel are 147 to 153 columbus avenue 155 to 167 columbus avenue and 324 to 3 stuart street. Permit type: Short form bldg permit | Expiration date: May 8, 2011 | Current use: Comm | Permit id: Sf50474 | |||||
Interior renovations to include tile carpet ;complete gut &; takedown Date: July 26, 2010Permit type: Bfd construction demo reno | Permit id: Fdc35059 | |||||
Temporary placement of (2) dumpsters for debris removal from construction work Date: January 26, 2012Permit type: Bfd temporary dumpster | Permit id: Td113596 | |||||
Cutting welding for removal of steel stack piping and boiler components (dpl 12 31 10) bfd paid detail required Date: September 14, 2010Permit type: Bfd cutting-burning-welding | Permit id: Cbw41613 | |||||
Interior demolition doc#20100608 Date: December 9, 2011Permit type: Bfd fire alarm installations | Permit id: Bfdf35113 | |||||
SCORE 79 Cutting concrete floor openings 5 x 5 for internal shoot last hole will be cut over exterior access ramp which cannot be seen from street.; (contract with sf34396) Client: Berkeley Columbus Real | Permit type: Short form bldg permit | Expiration date: February 11, 2011 | Current use: Comm | Permit id: Sf37785 | Parcel: 0501149000 | |||||
Occupy manhole; renewal Date: September 14, 2012Client: Berkeley Columbus Real | Permit type: Street occupancy permit | Expiration date: October 14, 2012 | Permit id: Occu-142568 | Parcel: 0501149000 |