Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Bfd chemist certificate proces Date: September 19, 2016 Permit id: Chm638290 | |||||
Rooms 508 &; 509 Date: September 27, 2016 Permit type: Bfd asbestos removal | Permit id: Asb641055 | |||||
SCORE 86 Demo of existing act flooring and millwork to be replaced with new. Date: October 20, 2016 Contractor: Mark Caulfield Permit type: Bfd construction demo reno | Permit id: Fdc648686 | |||||
SCORE 86 Demo existing act flooring and millwork and replace with new. Also add hepa filter above ceiling. Change light fixtures Date: October 20, 2016 Contractor: Mark Caulfield Permit type: Bfd bag smoke detectors | Permit id: Bsd648692 | |||||
Bfd chemist certificate proces Date: October 24, 2016 Permit id: Chm640926 | |||||
Cutting &; welding for the installation of light &; roof supports (dpl) bfd paid detail required Date: May 26, 2016 Permit type: Bfd cutting-burning-welding | Permit id: Cbw587820 | |||||
Stand crane in street; four spaces; ped staging required; 7am-5pm; boston police detail area a; 343-4239 Date: July 26, 2016 Permit type: Street occupancy permit | Expiration date: July 31, 2016 | Permit id: Occu-616974 | |||||
Bfd asbestos removal Date: May 31, 2016 Permit id: Asb597201 | |||||
Stand;2;trucks at manholes (6) ;for rod &; rope 7pm-6am level 3 Date: April 20, 2017 Permit type: Street occupancy permit | Expiration date: April 29, 2017 | Permit id: Occu-693708 | |||||
SCORE 72 Relocate six sprinkler to upright sprinkler for construction project relocate six sprinklers back to new ceilings. Date: June 22, 2017 Contractor: Dwayne Buck Permit type: Bfd sprinkler system | Permit id: Sprk716725 | |||||
Soldering of (3) water branch valves associated with public restroom (dpl) Date: June 26, 2017 Permit type: Bfd cutting-burning-welding | Permit id: Cbw723777 | |||||
SCORE 86 Temporary bagging of smoke detectors Date: June 30, 2017 Contractor: Mark Caulfield Permit type: Bfd bag smoke detectors | Permit id: Bsd725914 | |||||
SCORE 86 Work consists of (1) new mens restroom and (1) new womens restroom. Space will be taken over with demo complete. New work includes gwb act tiling light fixtures Date: June 30, 2017 Contractor: Mark Caulfield Permit type: Bfd construction demo reno | Permit id: Fdc725913 | |||||
SCORE 98 Temporary bagging of smoke detectors Date: June 30, 2017 Contractor: William Shea Permit type: Bfd bag smoke detectors | Permit id: Bsd719565 | |||||
SCORE 99 Soft soldering of copper lines for water service (dpl) bfd paid detail required Date: July 6, 2017 Contractor: John Cannistraro Permit type: Bfd cutting-burning-welding | Permit id: Cbw727261 | |||||
SCORE 82 Cutting welding burning and grinding of 1 foot section of 2 1 2" hot water heating pipe and tee fitting that will accept a temperature sensor. (dpl) bfd paid detail required Date: December 29, 2016 Contractor: John Keeley Permit type: Bfd cutting-burning-welding | Permit id: Cbw653361 | |||||
SCORE 82 Cut a 2 1 2" pipe with a sawsall and weld in a tee for installation of a temperature sensor. Date: November 16, 2016 Contractor: John Keeley Permit type: Bfd bag smoke detectors | Permit id: Bsd653360 | |||||
Bfd chemist certificate proces Date: November 9, 2016 Permit id: Chm653149 | |||||
Bfd chemist certificate proces Date: November 9, 2016 Permit id: Chm653153 |