Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install two-phase primary cable/secondary cable across right-of-way of ne 116th street in existing conduit. Install one-phase primary cable across right-of-way of 159th avenue ne in existing conduit. Date: August 15, 2013 Applicant: Mark Mauldin | Permit type: Right of way | Permit id: Row-2013-07162 | Parcel: 2626059037 | |||||
One at a time - occupying north and southbound lanes of 159th avenue ne and the east and westbound lanes of ne 116th street to tie into existing two-inch pe main located in 159th avenue ne and existing four-inch pe main located in ne 116th street and extend into plat of greystone Date: September 3, 2013 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2013-07310 | Parcel: 2626059037 | |||||
Install two-phase primary cable secondary cable across right-of-way of ne 116th street in existing conduit. Install one-phase primary cable across right-of-way of 159th avenue ne in existing conduit. Date: August 15, 2013 Applicant: Mark Mauldin | Permit type: Right of way | Permit id: Row-2013-07162 | Parcel: 2626059037 | |||||
SCORE 70 New round-a-bout at ne 116th/162nd needs to have an existing 25ta vault removed on the se corner. It is going to be half in the sidewalk and half in the landscape. It will be replaced with a 36x42 non-skid lid/ moved back into the proposed sidewalk. On the sw corner/ need to remove an existing pedestal and replace four feet back int landscape with a 30x vault non skid pull in new coax from approximately feet west of new round-a-bout location into new 30x vault/ then out of vault down 162nd avenue ne approximately 4 feet to existing pedestal location/ then approximately 1 feet out of 30x vault to new 36x42 vault. Date: August 22, 2013 Contractor: Jason Archey Applicant: Jill Look | Permit type: Right of way | Permit id: Row-2013-07363 | Parcel: 2626059037 | |||||
SCORE 99 New round-a-bout at ne 116th 162nd needs to have an existing 25ta vault removed on the se corner. It is going to be half in the sidewalk and half in the landscape. It will be replaced with a 36x42 non-skid lid moved back into the proposed sidewalk. On the sw corner need to remove an existing pedestal and replace four feet back int landscape with a 30x vault non skid pull in new coax from approximately feet west of new round-a-bout location into new 30x vault then out of vault down 162nd avenue ne approximately 4 feet to existing pedestal location then approximately 1 feet out of 30x vault to new 36x42 vault. Date: August 22, 2013 Contractor: Sefnco Applicant: Jill Look | Permit type: Right of way | Permit id: Row-2013-07363 | Parcel: 2626059037 | |||||
SCORE 99 New round-a-bout at ne 116th 162nd needs to have an existing 25ta vault removed on the se corner. It is going to be half in the sidewalk and half in the landscape. It will be replaced with a 36x42 non-skid lid moved back into the proposed sidewalk. On the sw corner need to remove an existing pedestal and replace four feet back int landscape with a 30x vault non skid pull in new coax from approximately feet west of new round-a-bout location into new 30x vault then out of vault down 162nd avenue ne approximately 4 feet to existing pedestal location then approximately 1 feet out of 30x vault to new 36x42 vault. Date: August 22, 2013 Contractor: Sefnco Applicant: Jill Look | Permit type: Right of way | Permit id: Row-2013-07363 |