Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
T i operating engineers union local no. 3 ~ 2 a c unit & 1 boiler behind roof screen to 3 a c units, 1 boiler & new pump heating (bldg plbg mech ele) Date: June 30, 2010 Permit type: Building | Permit status: Finaled | Completion date: April 26, 2011 | Permit id: Cb10-0506 | |||||
T i operating engineers local union no. #3: installation of a new permanent standby generator (bldg plbg elec) Date: September 12, 2012 Value: $250,000 Permit type: Building | Permit status: Issued | Permit id: Cb12-0663 | |||||
T/i operating engineers union local no. 3 ~ 2 a/c unit & 1 boiler behind roof screen to 3 a/c units, 1 boiler & new pump heating (bldg/plbg/mech/ele) Date: January 25, 2011 Permit type: Building | Permit status: Permit finaled | Completion date: April 26, 2011 | Expiration date: January 24, 2014 | Current use: Commercial | Permit id: Cb10-0506 | |||||
T/i operating engineers local union no. #3: installation of a new permanent standby generator (bldg/plbg/elec) Date: November 29, 2012 Value: $250,000 Permit type: Building | Permit status: Permit issued | Expiration date: November 29, 2015 | Current use: Commercial | Permit id: Cb12-0663 | |||||
Tear off and re-roof - overlay (bldg) Date: June 22, 2016 Value: $110,000 Permit type: Building | Permit status: Permit issued | Expiration date: June 22, 2019 | Current use: Commercial | Permit id: B16-0661 | |||||
SCORE 59 T i atpa - converting a break room to office space, moving sink to other side of the wall from new office, adding 2 new receptacles (bldg elec plumb) Permit type: Building | Permit status: Permit finaled | Completion date: March 12, 2014 | Expiration date: February 26, 2017 | Current use: Commercial | Permit id: Cb14-0081 | |||||
T i operating engineers union local no. 3 ~ 2 a c unit & 1 boiler behind roof screen to 3 a c units, 1 boiler & new pump heating (bldg plbg mech ele) Date: January 25, 2011 Permit type: Building | Permit status: Permit finaled | Completion date: April 26, 2011 | Expiration date: January 24, 2014 | Current use: Commercial | Permit id: Cb10-0506 | |||||
"extended stay" signs - replace existing wall sign with internally illuminated cabinet sign mounted flush on building and replace faces on existing internally illuminated monument sign (bldg elec) Date: April 3, 2012 Value: $1,750 Permit type: Building | Permit status: Finaled | Completion date: May 9, 2012 | Permit id: Cb12-0230 | |||||
"extended stay" signs - replace existing wall sign with internally illuminated cabinet sign mounted flush on building and replace faces on existing internally illuminated monument sign (bldg/elec) Date: April 16, 2012 Value: $1,750 Permit type: Building | Permit status: Permit finaled | Completion date: May 9, 2012 | Expiration date: April 16, 2015 | Current use: Commercial | Permit id: Cb12-0230 | |||||
Frito lay - install 11 ev charging stations for electrical vehicles in parking area Date: January 31, 2011 Permit type: Electrical | Permit status: Finaled | Completion date: June 14, 2011 | Permit id: E11-0010 | |||||
T i - family stations - installation of new walls, t-bar ceilings, lighting fixtures and controls. Replace mechanical units. Non-structural, interior demolition under separate permit. (bldg elec mech plbg) (14,639 sq ft) Date: November 17, 2015 Value: $900,000 Permit type: Building | Permit status: Plan review | Permit id: Cb15-1041 | |||||
Repair 8 of sewer lateral in parking lot Date: October 28, 2014 Value: $3,500 Permit type: Other | Permit status: Finaled | Completion date: November 3, 2014 | Permit id: Slr14-0182 | |||||
Demo of interior non structural wall for future t i Date: September 28, 2015 Value: $29,190 Permit type: Building | Permit status: Issued | Permit id: B15-1210 | |||||
Demo of interior non structural wall for future t/i Date: September 28, 2015 Value: $29,190 Permit type: Building | Permit status: Permit finaled | Completion date: May 25, 2016 | Expiration date: September 27, 2018 | Current use: Commercial | Permit id: B15-1210 | |||||
T/i - family stations - installation of new walls, t-bar ceilings, lighting fixtures and controls. Replace mechanical units. Non-structural, interior demolition under separate permit. (bldg/elec/mech/plbg) (14,639 sq ft) Date: January 25, 2016 Value: $900,000 Permit type: Building | Permit status: Permit finaled | Completion date: May 26, 2016 | Expiration date: January 24, 2019 | Current use: Commercial | Permit id: Cb15-1041 | |||||
SCORE 93 T i abbott diabetes care ~ convert (1) existing storage area into (2) storage area for same tenant Permit type: Other | Permit status: Permit finaled | Completion date: March 11, 2011 | Expiration date: February 15, 2014 | Current use: Commercial | Permit id: B11-0081 | |||||
SCORE 93 T i-abbott labs (upgrade existing lobby area w storefront glazing system for security purposes and relocate light fixtures) (fire sprinkler relocation to be under seperate permit) (bldg elec) Date: June 8, 2010 Contractor: Roger F Mairose Permit type: Building | Permit status: Permit finaled | Completion date: September 7, 2010 | Current use: Commercial | Permit id: Cb10-0446 | |||||
SCORE 93 T i-abbott labs (interior upgrades to convert existing manufacturing area to new 75 sq. Ft. Nurse & client suite and complaints investigation area (bldg plbg mech elec) Date: June 8, 2010 Contractor: Roger F Mairose Permit type: Building | Permit status: Permit finaled | Completion date: August 30, 2010 | Expiration date: July 19, 2013 | Current use: Commercial | Permit id: Cb10-0445 | |||||
T i - family stations - installation of new walls, t-bar ceilings, lighting fixtures and controls. Replace mechanical units. Non-structural, interior demolition under separate permit. (bldg elec mech plbg) (14,639 sq ft) Date: January 25, 2016 Value: $900,000 Permit type: Building | Permit status: Permit finaled | Completion date: May 26, 2016 | Expiration date: January 24, 2019 | Current use: Commercial | Permit id: Cb15-1041 | |||||
T i abbott diabetes care - remove & replace mechanical equipment @ equipement yard & screened roof top (bldg plbg mech ele) Date: February 11, 2010 Permit type: Building | Permit status: Finaled | Completion date: April 7, 2010 | Permit id: Cb10-0099 | |||||
T/i abbott diabetes care - remove & replace mechanical equipment @ equipement yard & screened roof top (bldg/plbg/mech/ele) Date: March 4, 2010 Permit type: Building | Permit status: Permit finaled | Completion date: April 7, 2010 | Expiration date: March 3, 2013 | Current use: Commercial | Permit id: Cb10-0099 | |||||
Che tofu - certificate of occupancy inspection scheduled for tuesday august 27, 2013 @ 1: pm Date: August 19, 2013 Value: $500 Permit type: Building | Permit status: Finaled | Completion date: August 27, 2013 | Permit id: B13-0766 | |||||
Ele ~ t i tric tool inc : from existing (2) meter sockets #9 & #12 install new sub-feeds & 4 v panel boards, additionally install transformer and 208 v panelboard Date: January 26, 2012 Value: $12,000 Permit type: Electrical | Permit status: Issued | Permit id: E12-0024 | |||||
Abbott laboratories - add 2 pit-style loading dock levelers w truck restraints at west-side dock doors (bldg elec) Date: September 9, 2009 Permit type: Building | Permit status: Finaled | Completion date: November 3, 2009 | Permit id: Cb09-0639 | |||||
Abbott diabetes care - replace 7 interior warehouse electrical doors (bldg elec) 2 11 09 revision to permit - changing wall framing details Date: November 20, 2008 Permit type: Building | Permit status: Finaled | Completion date: March 25, 2009 | Permit id: Cb08-0918 | |||||
T i abbott diabetes care - replace existing office with new lab- 13 sq ft (bldg plbg mech elec) 2 24 09 revision to permit - add new roof equipment support detail Date: October 28, 2008 Permit type: Building | Permit status: Finaled | Completion date: March 19, 2009 | Permit id: Cb08-0868 | |||||
T i abbott diabetes care - replace existing open 7 sqft office to 4-hr rated file storage vault 1 28 09~revised sheets a2. 01 & a7. 01 {minor changes to load-bearing walls, approved otc by jesse bright} bldg mech elec only Date: October 28, 2008 Permit type: Building | Permit status: Finaled | Completion date: March 19, 2009 | Permit id: Cb08-0866 | |||||
T i abbott diabetes-deferred electrical for b08-0183 Date: June 3, 2008 Permit type: Electrical | Permit status: Finaled | Completion date: June 6, 2008 | Permit id: E08-0590 | |||||
T i abbott diabetes - install remstar shuttle storage equipment in sqft of warehouse:remove & improvement concrete slab (deferred electrical) Date: February 29, 2008 Permit status: Finaled | Completion date: May 29, 2008 | Permit id: B08-0183 | |||||
T i abbott diabetes care ~ install 7 sqft exterior concrete slab for mechanical equipment (bldg elec) Date: February 21, 2008 Permit type: Building | Permit status: Finaled | Completion date: April 2, 2008 | Permit id: Cb08-0126 | |||||
Unit #106 ~ t i - yumbrella (food packaging): activate new meter for 2 amp, 4 v. Service & run power to new main panel in location x; run conduit and wiring to panel k; install trainsformers (4 volt to 2 volt & 4 volt to 1 volt); install subpanel for 2 volt in location z; install wiring for new equipment (compressor, refrig & sealing unit); and rewire existing receptacles & lighting to panel (all power in unit to be supplied by new meter) Date: November 12, 2013 Value: $5,500 Permit type: Electrical | Permit status: Finaled | Completion date: November 10, 2014 | Permit id: E13-0369 | |||||
Suite #100, #102 & #104 ~ t i tric tools inc & certificate of occupancy : demolition of interior partition walls, demo a pair of interior bathroom & convert (3) suites into 1 suite bldg plbg mech ele Date: August 1, 2011 Value: $10,000 Permit type: Building | Permit status: Issued | Permit id: Cb11-0589 | |||||
Ele ~ t/i tric tool inc : from existing (2) meter sockets #9 & #12 install new sub-feeds & 4 v panel boards, additionally install transformer and 208 v panelboard Date: January 26, 2012 Value: $12,000 Permit type: Electrical | Permit status: Permit issued | Expiration date: January 25, 2015 | Permit id: E12-0024 | |||||
Abbott laboratories - add 2 pit-style loading dock levelers w/truck restraints at west-side dock doors (bldg/elec) Date: September 18, 2009 Permit type: Building | Permit status: Permit finaled | Completion date: November 3, 2009 | Expiration date: September 17, 2012 | Current use: Commercial | Permit id: Cb09-0639 | |||||
Abbott diabetes care - replace 7 interior warehouse electrical doors (bldg/elec) 2/11/09 revision to permit - changing wall framing details Date: December 23, 2008 Permit type: Building | Permit status: Permit finaled | Completion date: March 25, 2009 | Expiration date: December 23, 2011 | Current use: Commercial | Permit id: Cb08-0918 | |||||
T/i abbott diabetes care - replace existing office with new lab- 13 sq ft (bldg/plbg/mech/elec) 2/24/09 revision to permit - add new roof equipment support detail Date: December 23, 2008 Permit type: Building | Permit status: Permit finaled | Completion date: March 19, 2009 | Expiration date: December 23, 2011 | Current use: Commercial | Permit id: Cb08-0868 | |||||
T/i abbott diabetes care - replace existing open 7 sqft office to 4-hr rated file storage vault 1/28/09~revised sheets a2. 01 & a7. 01 {minor changes to load-bearing walls, approved otc by jesse bright} bldg/mech/elec only Date: December 23, 2008 Permit type: Building | Permit status: Permit finaled | Completion date: March 19, 2009 | Expiration date: December 23, 2011 | Current use: Commercial | Permit id: Cb08-0866 | |||||
T/i abbott diabetes-deferred electrical for b08-0183 Date: June 5, 2008 Permit type: Electrical | Permit status: Permit finaled | Completion date: June 6, 2008 | Expiration date: June 5, 2011 | Permit id: E08-0590 | |||||
T/i abbott diabetes - install remstar shuttle storage equipment in sqft of warehouse:remove & improvement concrete slab (deferred electrical) Date: March 24, 2008 Permit status: Permit finaled | Completion date: May 29, 2008 | Expiration date: March 24, 2011 | Current use: Commercial | Permit id: B08-0183 | |||||
T/i abbott diabetes care ~ install 7 sqft exterior concrete slab for mechanical equipment (bldg/elec) Date: March 5, 2008 Permit type: Building | Permit status: Permit finaled | Completion date: April 2, 2008 | Expiration date: March 5, 2011 | Current use: Commercial | Permit id: Cb08-0126 | |||||
Suite #100, #102 & #104 ~ t/i tric tools inc & certificate of occupancy : demolition of interior partition walls, demo a pair of interior bathroom & convert (3) suites into 1 suite bldg/plbg/mech/ele Date: August 8, 2011 Value: $10,000 Permit type: Building | Permit status: Permit issued | Expiration date: August 7, 2014 | Current use: Commercial | Permit id: Cb11-0589 | |||||
Re-roof mil tpo roof system overlay Date: January 25, 2016 Value: $134,120 Permit type: Building | Permit status: Permit issued | Expiration date: January 24, 2019 | Current use: Commercial | Permit id: B16-0065 | |||||
SCORE 93 Revision to cb11-0311 ~ convert (e) open office space into 12 private offices (approx. 15 sqft) for t i abbott diabetes care ~ convert (e) manuafacturing space into office (34,0 sqft) & add new exterior window in new office space bldg plbg mech ele Permit type: Building | Permit status: Permit finaled | Completion date: November 28, 2011 | Expiration date: October 30, 2014 | Current use: Commercial | Permit id: Cb11-0311-Rev2 | |||||
SCORE 93 T i abbott diabetes care ~ convert (e) manuafacturing space into office (34,0 sqft) & add new exterior window in new office space bldg plbg mech ele Permit type: Building | Permit status: Expired | Expiration date: May 23, 2014 | Current use: Commercial | Permit id: Cb11-0311 | |||||
SCORE 93 Revision to cb11-0311: t i abbott diabetes care ~ revision of interior door sizes, structural steel support to roll-up door, upgrades to exhaust system, down size lighting & changes to outlets bldg plbg mech ele Permit type: Building | Permit status: Expired | Expiration date: June 26, 2014 | Current use: Commercial | Permit id: Cb11-0311-Rev1 | |||||
SCORE 93 T i abbott diabetes ~ (first floor 5,0 sqft) convert (e) manuafacturing space into office space with expansion of existing restroom (bldg plbg mech ele) Permit type: Building | Permit status: Permit finaled | Completion date: August 16, 2012 | Expiration date: May 3, 2015 | Current use: Commercial | Permit id: Cb12-0207 | |||||
Replacement of rooftop air conditioning unit, disconnect & reconnect of existing electrical, gas, condensate drain & controls (no curb modifications are required) Date: September 5, 2012 Value: $98,000 Permit type: Mechanical | Permit status: Finaled | Completion date: December 19, 2012 | Permit id: M12-0088 |