Ramsey m h lot 16 Date: September 19, 2008 Permit status: Closed | Permit id: 08-04858 | |||||
August 18, 2008 2:49:45 pm kneel. New mh to lot 16 location: patton to n louisiana to right on emma left on emma hills.; september 25, 2008 10:26:43 am kneel. Premise redacted phone number8;sls; september 19, 2008 9:11:34 am kneel. New mh to lot 16; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended Permit type: Permits - historical | Permit status: Closed | Permit id: 08-04858 | Parcel: 20939 | |||||
Ramsey m/h lot 16 Date: September 19, 2008 Value: $50,000 Permit type: Historical | Permit status: Closed | Permit id: 08-04858 | |||||
SCORE 99 Ramsey m/h lot 16 Client: Ramsey M H Lot 16 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04858 | Parcel: 20939 | |||||
SCORE 100 Ramsey m/h lot 16 Client: Ramsey M H Lot 16 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04858 | Parcel: 20939 | |||||
SCORE 64 Ramsey m/h lot 16 Client: Ramsey M H Lot 16 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04858 | Parcel: 20939 | |||||
August 18, 2008 2:49:45 pm kneel. New mh to lot 16 location: patton to n louisiana to right on emma left on emma hills.; september 25, 2008 10:26:43 am kneel. Premise redacted phone number8;sls; september 19, 2008 9:11:34 am kneel. New mh to lot 16; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended Date: September 19, 2008 Permit type: Permits - historical | Permit status: Closed | Permit id: 08-04858 | Parcel: 20939 | |||||
Ramsey m h lot 16 Date: September 19, 2008 Value: $50,000 Permit type: Historical | Permit status: Closed | Permit id: 08-04858 |